X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22002

Well Details

Well ID: 37-115-22002
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Bridgewater Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 152533
Farm/Lease Name: HALLIDAY A 6
License Status: Active
Spud Date: 2015-07-22
Permit Date: 2015-05-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.815183
Longitude: -75.902994

For data sources see[1][2][3]

Well History

Date Event
2015-05-19 New Permit Application
2015-07-21 Performed Spud Operation
2015-08-13 Drilling Completion
2016-06-21 Perforation
2016-08-05 Perforation
2016-08-05 Performed Stage 1 of Stimulation
2016-08-05 Performed Stage 2 of Stimulation
2016-08-06 Perforation
2016-08-07 Perforation
2016-08-07 Performed Stage 3 of Stimulation
2016-08-08 Perforation
2016-08-08 Performed Stage 4 of Stimulation
2016-08-09 Perforation
2016-08-09 Performed Stage 5 of Stimulation
2016-08-10 Perforation
2016-08-10 Performed Stage 6 of Stimulation
2016-08-11 Perforation
2016-08-11 Performed Stage 7 of Stimulation
2016-08-12 Perforation
2016-08-12 Performed Stage 8 of Stimulation
2016-08-13 Perforation
2016-08-13 Performed Stage 9 of Stimulation
2016-08-14 Perforation
2016-08-14 Performed Stage 10 of Stimulation
2016-08-15 Perforation
2016-08-15 Performed Stage 11 of Stimulation
2016-08-16 Perforation
2016-08-16 Performed Stage 12 of Stimulation
2016-08-17 Perforation
2016-08-17 Performed Stage 13 of Stimulation
2016-08-18 Perforation
2016-08-18 Performed Stage 14 of Stimulation
2016-08-19 Perforation
2016-08-19 Performed Stage 15 of Stimulation
2016-08-20 Perforation
2016-08-20 Performed Stage 16 of Stimulation
2016-08-21 Perforation
2016-08-21 Performed Stage 17 of Stimulation
2016-08-22 Perforation
2016-08-22 Performed Stage 18 of Stimulation
2016-08-23 Perforation
2016-08-23 Performed Stage 19 of Stimulation
2016-08-24 Perforation
2016-08-24 Performed Stage 20 of Stimulation
2016-08-25 Perforation
2016-08-25 Performed Stage 21 of Stimulation
2016-08-26 Perforation
2016-08-26 Performed Stage 22 of Stimulation
2016-08-27 Perforation
2016-08-27 Performed Stage 23 of Stimulation
2016-08-28 Perforation
2016-08-28 Performed Stage 24 of Stimulation
2016-08-29 Perforation
2016-08-29 Performed Stage 25 of Stimulation
2016-08-30 Perforation
2016-08-30 Performed Stage 26 of Stimulation
2016-08-30 Performed Stage 27 of Stimulation
2016-08-31 Perforation
2016-09-04 Perforation
2016-09-04 Performed Stage 28 of Stimulation
2016-09-05 Performed Stage 29 of Stimulation
2017-01-27 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-08-04 2016-09-04 6,631 10,732,100 0
2 2016-08-04 2016-09-04 6,631 10,572,800 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-08-05 1 SAND, WHITE 588,705 8,242 6,636
2016-08-05 2 SAND, WHITE 588,705 7,306 6,794
2016-08-07 3 SAND, WHITE 588,705 7,365 7,115
2016-08-08 4 SAND, WHITE 588,705 7,263 7,384
2016-08-09 5 SAND, WHITE 588,705 7,029 6,681
2016-08-10 6 SAND, WHITE 588,705 7,024 7,139
2016-08-11 7 SAND, WHITE 588,705 6,822 6,969
2016-08-12 8 SAND, WHITE 588,705 6,626 6,738
2016-08-13 9 SAND, WHITE 588,705 6,416 6,861
2016-08-14 10 SAND, WHITE 588,705 6,429 7,189
2016-08-15 11 SAND, WHITE 588,705 6,501 7,180
2016-08-16 12 SAND, WHITE 588,705 6,362 6,865
2016-08-17 13 SAND, WHITE 588,705 6,462 6,988
2016-08-18 14 SAND, WHITE 588,705 6,318 6,361
2016-08-19 15 SAND, WHITE 588,705 6,498 6,493
2016-08-20 16 SAND, WHITE 588,705 6,411 6,789
2016-08-21 17 SAND, WHITE 588,705 6,520 6,640
2016-08-22 18 SAND, WHITE 588,705 6,637 6,957
2016-08-23 19 SAND, WHITE 588,705 6,389 6,818
2016-08-24 20 SAND, WHITE 588,705 6,528 6,847
2016-08-25 21 SAND, WHITE 588,705 6,260 6,629
2016-08-26 22 SAND, WHITE 588,705 6,249 6,527
2016-08-27 23 SAND, WHITE 588,705 6,410 6,475
2016-08-28 24 SAND, WHITE 588,705 6,525 6,415
2016-08-29 25 SAND, WHITE 588,705 6,448 5,848
2016-08-30 26 SAND, WHITE 588,705 6,437 6,523
2016-08-30 27 SAND, WHITE 588,705 6,270 6,723
2016-09-04 28 SAND, WHITE 588,705 5,797 5,260
2016-09-05 29 SAND, WHITE 588,705 5,682 4,578

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 1,549,053.33 110 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 3,481,304.55 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 2,295,797.00 363 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 1,737,512.00 364 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CABOT OIL & GAS CORP Drilling Fluid Waste 161.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 CABOT OIL & GAS CORP Drill Cuttings 1,205.58 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Synthetic Liner Materials 10.71 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Fracturing Fluid Waste 13,195.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Fracturing Fluid Waste 37.60 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CABOT OIL & GAS CORP Produced Fluid 3,648.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Fracturing Fluid Waste 966.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 CABOT OIL & GAS CORP Waste Water Treatment Sludge 23.36 Tons LANDFILL 100933
2016 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.10 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2017 CABOT OIL & GAS CORP Produced Fluid 926.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 2,456.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 0.59 Tons LANDFILL 301358
2018 CABOT OIL & GAS CORP Produced Fluid 1,028.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 908.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 1,067.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2391739 Primary Facility 2015-07-22 Routine/Complete Inspection No Violations Noted
2396110 Primary Facility 2015-08-06 Drilling/Alteration No Violations Noted
2511296 Primary Facility 2016-08-16 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:00a.m., Keane was on site and fracturing the wells, I met with company man Larry Fulmer. They were fracturing stage 13 out of 35 on the 3H and running a plug and perorating on the 6H.

They have completed: 13 stages out of 35 on the 1H, 12 stages out of 30 on the 2H, 12 stages out of 34 on the 5H, and 13 stages out of 29 on the 6H. They were fracturing with fresh water and recycled water, all the tanks were on containment and the containment looked in good condition. I took a walk around the location and everything looked OK. I left the site at 11:50a.m.

2519981 Primary Facility 2016-09-09 Routine/Complete Inspection No Violations Noted I met with Carl Potter, site company man and completions consultant of Cabot oil and Gas. There are (2) coil tubing units on the location in the process of drilling out hydraulic fracturing plugs. One of the coil tubing units is owned by Cudd Energy Services, while the other is owned by Legend Energy Services. Cabot submitted a stimulation notice to the Department on 8/3/16. The notice indicated that pressure test surface iron to begin frac operations on the Halliday 1H, 2H, 3H, 5H and 6H on 8/4/16 at 8AM. There are no wells in production. Mr. Potter stated the following. "Frac plug drill outs commenced on 9/7/16. The plugs are currently being drilled out on the 2H and 5H wells. In the southeast section of the well pad near frac tanks used as working tanks during hydraulic fracturing operations, I observed (2) small spots of dark staining on the ground surface. The dark staining was indicative of a petroleum substance released to the pad surface. I observed a significant amount of what appears
2534046 Primary Facility 2016-11-02 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 11:25a.m., the wells were recently completed and put into production. The cellar had water at the bottom with no bubbling noticed. The (20x13) vent pipe was open and venting into a tank, the (13x9) vent pipe was open and venting into a tank, the (9x5) vent pipe was open and venting into a tank. There was 743psi on the production casing. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 12:45p.m.

2597026 Primary Facility 2017-05-17 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a Routine Complete Inspection.
2622704 Primary Facility 2017-08-04 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 11:05a.m.

The cellar was full of water with no bubbling noticed. The (20x13) annulus vent pipe was open and venting into a small plastic tank, the (13x9) annulus vent pipe was open and venting into a small plastic tank, the (9x5) annulus vent pipe was open and venting into a small plastic tank. All the annulus vent pipes were connected to one pipe going into the same tank. There was 630psi on the production casing. I took a walk around the location and there were no obvious concerns noticed. I left the site at 11:55a.m.

2639085 Primary Facility 2017-08-16 Routine/Complete Inspection No Violations Noted Currently the 6H, 2H, 3H, 5H, and 1H wells are present.
2732591 Primary Facility 2018-05-16 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and venting to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2787201 Primary Facility 2018-10-02 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection of the Halliday well site.

The day was warm with intermittent rain, heavy at times.

The wells were properly labeled.

The access road and roadside ditch were solid and stable as were all slopes leading to the well pad. The well pad cut and fill slopes were well vegetated, in excess of the 70% required by the Department. The vegetation was lush, healthy and perennial.

There were no erosional issues noted.

There were no violations noted.

2831171 Primary Facility 2019-01-24 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water and ice 6.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 1/2/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[9]

References