X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-21933

Well Details

Well ID: 37-115-21933
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Rush Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID:
Farm/Lease Name: HOUSENICK J 2
License Status:
Spud Date:
Permit Date: 2015-01-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.812739
Longitude: -76.075936

For data sources see[1][2][3]

Well History

Date Event
2015-01-23 New Permit Application

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2463563 Primary Facility 2016-03-08 Incident- Response to Accident or Event No Violations Noted Cabot removed an approximate 12-15 cubic yards of material at the time the Department arrived. They stated that the machine sat from the time of the release until the morning of 3/8/16, when they were able to fix and then move it. It was reported that the bulldozer’s hose clamp broke and the hose disconnected from the reservoir. The tank was described as having a 15.8 gallon capacity. Cabot Oil & Gas presumes that they lost almost the entire volume of the tank, which is how they estimated the 15 gallons. The Department observed the excavation and noted that it appeared as though there was some remaining product floating on the water in the excavation. Violations associated with this inspection have been attached to Site ID# 785492.
2488378 Primary Facility 2016-05-16 Incident- Response to Accident or Event No Violations Noted On 5/12/2016, David Schoonover, PADEP OGI, received a text message on his work iPhone on 5/12/16 from the iPhone number of (412) 980-8973 regarding a hydraulic fluid spill. The text message stated the following. "Hey, we had a hydraulic line fail on the loader. 2 gallons on top of primary contaiment containment and mats. I'll have a report in the morning. I wasn't sure if I needed to let you know or not." Mr. Schoonover responded back via a text message to the unknown individual who sent the text inquiring if it was the J. Housenick Pad 1 that he/she was referring to where the spill occurred. The individual responded "yes" to Mr. Schoonover's inquiry.

Precision Drilling Rig #548 is at the location. The most recent drilling resumption notice submitted to the Department from Cabot was on 4/12/16. The notice indicated that Cabot would resume drilling after 30 days or more of notification on the J Housenick 3H well on 4/1/4/16 at 4:00 PM. On 5/3/16, Cabot submitted a casing cementing notification to the

2499148 Primary Facility 2016-06-27 Routine/Complete Inspection No Violations Noted
2657072 Primary Facility 2017-11-06 Routine/Complete Inspection No Violations Noted While out inspecting the Rigsby pipeline, I did a quick inspection on the Housenick well site. The site and access road were solid and stable with no erosional issues noted. The vegetation was healthy and sufficient.

There were no issues noted

For data sources see[5]

References