If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-21760 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.677269,"lon":-75.835503,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Lathrop Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 148676 | |
Farm/Lease Name: KERR UNIT B 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-06-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.677269 | |
Longitude: -75.835503 |
Date | Event |
---|---|
2014-06-12 | New Permit Application |
2014-08-21 | Performed Spud Operation |
2014-11-03 | Drilling Completion |
2016-02-03 | Perforation |
2016-02-03 | Performed Stimulation |
2016-05-12 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-02-03 | 2016-02-07 | 7,307 | 5,371,510 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Friction Reducer, Unislick CST | Universal | Friction Reducer | petroleum distillates | 64742-47-8 | 20 | 0.00175 | 0 |
Oleic Acid Diethoanolamide | 93-83-4 | 2 | 0.00017 | 0 | ||||
Water | 7732-18-5 | 45 | 0.00393 | 0 | ||||
Alcohols, C12-16 ethoxylated | 68551-12-2 | 2 | 0.00017 | 0 | ||||
copolymer of 2-propenamide | 69418-26-4 | 30 | 0.00262 | 0 | ||||
Ammonium chloride | 12125-02-9 | 1 | 0.00009000 | 0 | ||||
Sand (Proppant) | Universal | Proppant | Silica Substrate | 14808-60-7 | 100 | 14.9091 | 0 | |
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Methanol | 67-56-1 | 5 | 0.00001000 | 0 | |
Short Chained Glycol Ether | 112-34-5 | 60 | 0.00006000 | 0 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000100 | 0 | ||||
Thiourea | 62-56-6 | 1 | 0.00000100 | 0 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000100 | 0 | ||||
Ethoxylated alcohol | 68002-97-1 | 35 | 0.00004000 | 0 | ||||
Hydrochloric Acid (15%) | PVS | Acidizing | Water | 7732-18-5 | 85 | 0.10753 | 0 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.01866 | 0 | ||||
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.02003 | 0 | |
Alcohols, ethoxylated | 68551-12-2 | 5 | 0.00334 | 0 | ||||
Water | 7732-18-5 | 42 | 0.02804 | 0 | ||||
Ammonium acetate | 631-61-8 | 13 | 0.00868 | 0 | ||||
Alcohols, ethoxylated | 68002-97-1 | 5 | 0.00334 | 0 | ||||
Alcohols, ethoxylated | 68439-50-9 | 5 | 0.00334 | 0 | ||||
Water | Chief | Base Fluid | Water | 7732-18-5 | 100 | 84.8909 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-02-03 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 829,388.78 | 313 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 518,520.02 | 362 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 433,299.44 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 310,355.83 | 334 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 60.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,822.81 Tons | LANDFILL | 100933 |
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 2,077.95 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Drill Cuttings | 32.01 Tons | LANDFILL | 301358 |
2015 | CHIEF OIL & GAS LLC | Drill Cuttings | 9.25 Tons | LANDFILL | 301358 |
2016 | CHIEF OIL & GAS LLC | Fracturing Fluid Waste | 220.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | CHIEF OIL & GAS LLC | Fracturing Fluid Waste | 4,453.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 13,964.14 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 1,953.72 Bbl | REUSE (AT WELL PAD) | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 399.88 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 1,284.96 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 615.39 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Synthetic Liner Materials | 4.17 Tons | LANDFILL | 301358 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2310442 | Primary Facility | 2014-10-02 | Drilling/Alteration | No Violations Noted | |
2445789 | Primary Facility | 2016-01-25 | Routine/Complete Inspection | No Violations Noted | Routine inspection of the Kerr Unit B Well Pad prior to the start of fracking activities of the 2H and 3H wells. I was accompanied by Jon Sassi, DEP Environmental Protection Specialist. During the inspection we met Water Foreman, Ralph Larsen, and Company Man, Bret Fowler, both of Chief. The Department received stimulation notices for both wells on January 22, 2016. At the time of the inspection, fracking continues on the Kerr Unit 4H well.
The site is stable with no observable E & S issues at the time of the inspection. Post Construction Stormwater Management BMPs are installed and appear to functioning properly. Containment was in place around the water and brine tanks, etc, and crews were at work constructing the remaining containment and building the heater houses for the water and brine tanks. |
2473913 | Primary Facility | 2016-03-24 | Routine/Complete Inspection | No Violations Noted | Routine inspection of the Kerr Unit B Well Pad in conjunction with the Notice of Termination inspection of the Kerr B Lateral pipeline. Crews were removing containment and equipment from the recent fracking of the 2H and 3H wells. Much of the surface of the pad was still covered but no issues were observed. The Department will visit the pad at a later date for a more detailed post-frack inspection of the pad. |
2715949 | Primary Facility | 2018-04-06 | Site Restoration | No Violations Noted | This inspection was conducted to confirm Chief's assessment that the project meets the minimum requirements for permit termination. The one infiltration berm for this pad has been installed. The Department’s determination is that the site meets the requirements for permit termination. I recommend the NOT be approved. |
For data sources see[9]