X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-21723

Well Details

Well ID: 37-115-21723
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Choconut Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 151373
Farm/Lease Name: COREY 07 089 04 J 4H
License Status:
Spud Date:
Permit Date: 2014-05-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.977128
Longitude: -76.045761

For data sources see[1][2][3]

Well History

Date Event
2014-05-02 New Permit Application
2014-08-20 Performed Spud Operation
2014-09-22 Drilling Completion
2014-10-21 Perforation
2014-10-29 Performed Stimulation
2015-04-09 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-06 2014-11-06 5,824 4,153,640 18,000

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AI-7NR (Acid Inhibitor) Trican Acid Inhibitor Prop-2-yn-1-ol 107-19-7 1 0.00000800 3.33816
Water Customer Carrier Water 7732-18-5 100 78.0076 34,663,800.0
Other Chemicals Trade Secret Proprietary 0 0 0
Acrylamide 79-06-1 0 0 0
Sorbitan monooleate 1338-43-8 0 0 0
Water 7732-18-5 0 0 0
LSI-21 (Scale Inhibitor) Trican Scale Inhibitor Sodium Salt of Phosphate Ester 68131-72-6 15 0.003758 1670.12
Acrylic Polymer 28205-96-1 15 0.003758 1670.12
7 1/2% HCL Trican Carrier Hydrochloric acid 7647-01-0 7.5 0.002922 1298.25
AQUCAR DB 5 (Water Treatment Microbiocide) Trican Biocide 2,2-dibromo-3-nitrilopropionamide 10222-01-2 5 0.001275 566.402
Polyethylene glycol 25322-68-3 65.2 0.016621 7385.88
Dibromoacetonitrile 3252-43-5 0.5 0.000127 56.6402
Sodium Bromide 7647-15-6 1.5 0.000382 169.921
White 40/70 Trican Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 8.65842 3,847,490.0
White 30/50 Trican Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 5.18822 2,305,460.0
100 Mesh, Bulk (over 20K lbs)* Trican Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 7.68784 3,416,200.0
FR-17 (Friction Reducer) Trican Friction Reducer Mineral oil/ light hydrotreated pet. distillate 64742-47-8 28 0.018302 8132.7
Polyacrylamide Proprietary 30 0.019609 8713.6
Ethoxylated alcohols Proprietary 4 0.002615 1161.81
Ethylene Glycol 107-21-1 3 0.001961 871.36
3 1/2% HCL Trican Carrier Hydrochloric acid 7647-01-0 3.5 0.010517 4673.43
FEAC-20 (Iron Control) Trican Iron Control Acetic acid 64-19-7 45 0.000798 354.513
Citric acid 77-92-9 30 0.000532 236.342

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-10-29 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2015 REPSOL OIL & GAS USA LLC 346,251.60 86 0.00 0 0.00 0
2016 REPSOL OIL & GAS USA LLC 1,048,360.70 361 0.00 0 0.00 0
2017 REPSOL OIL & GAS USA LLC 759,371.70 365 0.00 0 0.00 0
2018 REPSOL OIL & GAS USA LLC 589,630.00 365 0.00 0 0.00 0
2019 REPSOL OIL & GAS USA LLC 500,466.50 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 REPSOL OIL & GAS USA LLC Fracing Fluid Waste 1,544.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 REPSOL OIL & GAS USA LLC Fracing Fluid Waste 7,806.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 REPSOL OIL & GAS USA LLC Fracing Fluid Waste 2,071.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 REPSOL OIL & GAS USA LLC Drill Cuttings 1,136.70 Tons LANDFILL 8-0728-0004/013
2015 REPSOL OIL & GAS USA LLC Fracing Fluid Waste 1,800.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 REPSOL OIL & GAS USA LLC Fracturing Fluid Waste 50.98 Tons LANDFILL 100361
2015 REPSOL OIL & GAS USA LLC Produced Fluid 693.02 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 REPSOL OIL & GAS USA LLC Fracing Fluid Waste 52.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 REPSOL OIL & GAS USA LLC Fracing Fluid Waste 47.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 REPSOL OIL & GAS USA LLC Produced Fluid 1,187.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 REPSOL OIL & GAS USA LLC Produced Fluid 31.09 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 REPSOL OIL & GAS USA LLC Produced Fluid 2,585.80 Bbl REUSE OTHER THAN ROAD SPREADING
2016 REPSOL OIL & GAS USA LLC Produced Fluid 86.66 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 REPSOL OIL & GAS USA LLC Produced Fluid 316.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 REPSOL OIL & GAS USA LLC Produced Fluid 43.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 REPSOL OIL & GAS USA LLC Produced Fluid 68.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 REPSOL OIL & GAS USA LLC Produced Fluid 1,208.89 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Produced Fluid 112.42 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 REPSOL OIL & GAS USA LLC Produced Fluid 104.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 REPSOL OIL & GAS USA LLC Produced Fluid 582.31 Bbl REUSE (AT WELL PAD)
2019 REPSOL OIL & GAS USA LLC Produced Fluid 33.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Produced Fluid 374.95 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2264162 Primary Facility 2014-04-22 Administrative/File Review No Violations Noted
2266933 Primary Facility 2014-04-30 Routine/Partial Inspection No Violations Noted
2284210 Primary Facility 2014-07-03 Preoperation Inspection No Violations Noted The Department was on site at the Talisman Energy Corey Well Site to conduct a Preoperational Inspection. The Well Permit issued for this pad is the Corey 1H (115-21722, 115-21723). The perimeter BMP's were in place and the pad was less than 40% complete. There were large wood chip piles on site which were in the process of being removed during inspection. Rock sumps for the culvert piping across the access road were in the process of being completed. Due to recent rain storm activity, progress on site was not as advanced as anticipated, however a post rain event inspection was recently completed. The most recent inspection activity was 7/2/2014. No violations noted. If you have any questions please contact me.
2335307 Primary Facility 2014-12-31 Routine/Complete Inspection No Violations Noted The Department was on site at the Talisman Energy Corey Well Site to conduct a Routine Complete Inspection. The Well Permits issued for this pad are the Corey 1H (115-21722, 115-21723). The site was stable and there were no erosional issues at this time. The most recent inspection activity was 12/31/2014. No violations noted. If you have any questions please contact me.
2375391 Primary Facility 2015-06-01 Routine/Complete Inspection No Violations Noted The Department was on site at the Corey Well Pad to do a routine complete inspection of the erosion and sediment controls. The site was not well vegetated, and recently had a small slip near the corner of the pad on the cut slope. The site surface is hydroseeded with a tackifying agent, and the slip had been recently repaired with rip rap so it is now stable. There was no evidence of any sediment leaving the site, and there is a contractor scheduled to scarify and reseed all poorly vegetated areas.
2402447 Primary Facility 2015-08-27 Routine/Complete Inspection No Violations Noted
2462623 Primary Facility 2016-02-29 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a Routine Complete inspection of the Corey Well Site (ESX29-115-14-0043) The site was well vegetated and there were no erosional issues present at this time.

There are no violations.

If there are any questions please feel free to contact me.

2491431 Primary Facility 2016-06-08 Routine/Partial Inspection No Violations Noted The Department was on site to conduct a Routine Partial Inspection at the Corey Well Site located in Choconut Township, Susquehanna County. At the time of the inspection, the E&S Plan was on site and the E&S inspection log indicated that the most recent inspection was conducted on 5/29/16.

The Department noted that there are areas along the slopes on the access road that do not appear to meet temporary stabilization requirements. The Department requests that the operator deploy a method of temporary stabilization that is consistent with your E&S Plan within 3 days of receipt of this report.

In the area where the culvert (STA 18+50,Stream Crossing of the UNT to Choconut Creek -WWF/MF) is, there are rills running down the access road. Sediment laden water is running down these rills, across the road, down the rip rap fill slope, and into the UNT to Choconut Creek. The creek is being impacted with sediment laden water but is running clear upstream from this interference. This is a violation of the Penn

2498597 Primary Facility 2016-07-05 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 9:55a.m., the cellar was about half full of water with no bubbling noticed, the (20x13) vent pipe was open and venting into the atmosphere with no gas detected, the (13x9) vent pipe was open and venting into the atmosphere with no gas detected, the (9x5) vent pipe was open and venting into the atmosphere with gas detected at 100% LEL and peaked at 14% methane with no measurable flow. There was 792psi on the production casing and 433psi on the production tubing. The production line was connected to a separator and the bottom line was going to a 500bbl tank that was on containment and the valve was closed. I took a walk around the location and everything looked OK.

I left the site at 10:35a.m.

2504469 Primary Facility 2016-07-06 Routine/Partial Inspection No Violations Noted
2526661 Primary Facility 2016-09-26 Follow-up Inspection No Violations Noted The Department was on site to conduct a Follow-Up Inspection of the Corey Well Site access road in the vicinity of the areas of concern documented in the 6/8/2016 inspection. At the time of the inspection, the Department noted that the UNT to Choconut Creek was running clear. The area has been stabilized, and the side of the road has been built up and the material seems to be compacted. A filter sock sediment trap is located at the base of the road alongside the stream as an extra layer of protection. At the top of the slope (on the access road) “rip rap” is spray painted with two lines continuing toward the FSST. New filter sock has also been added and several water bars have been installed on the access road directing the flow of water to either side. The culvert outlet adjacent to the pipeline is still full of sediment and should be maintained. The pipeline interface also appears to be better vegetated than in previous inspections. The Department plans to return during an active rain event for a
2526798 Primary Facility 2016-09-29 Follow-up Inspection No Violations Noted
2544504 Primary Facility 2016-11-17 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a Routine Complete inspection of the Corey Well Site (ESX29-115-14-0043) The site was well vegetated and there were no erosional issues present at this time.

There are no violations.

If there are any questions please feel free to contact me.

2588476 Primary Facility 2017-04-27 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 13:15p.m.

The cellar was full of water with no bubbling noticed. The (20x13) annulus vent pipe was open and venting into the atmosphere with no gas detected, the (13x9) annulus vent pipe was open and venting into the atmosphere with no gas detected, the (9x5) annulus vent pipe was open and venting into the atmosphere with no gas detected. There was 561psi on the production casing and 389psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 13:50p.m.

2697782 Primary Facility 2018-02-20 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 1.5' below grade in the cellar and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2795749 Primary Facility 2018-10-29 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 1.5' below grade in the cellar and there was no bubbling noticed. The (20x13), (13x9) and (9x5) annuli were venting to the atmosphere. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[9]

References