Well Details

Well ID: 37-115-21700
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Gibson Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 150998
Farm/Lease Name: PLONSKI I 3
License Status:
Spud Date:
Permit Date: 2014-03-03
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.795328
Longitude: -75.568333

For data sources see[1][2][3]

Well History

Date Event
2014-03-03 New Permit Application
2014-06-12 Performed Spud Operation
2014-08-21 Drilling Completion
2014-10-19 Perforation
2014-11-03 Performed Stimulation
2015-03-17 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-01 2014-11-20 7,256 7,887,940 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Ferriplex 40 Chemplex Iron Control Trisodium Nitrilotriacetate 5064-31-3 40 0.00115462 867.88
Sodium Hydroxide 1310-73-2 1 0.00002887 21.697
Sodium Sulfate Anhydrous 7757-82-6 2 0.00005773 43.394
Sand (Proppant) TSS Proppant Silica Substrate 14808-60-7 100 11.137 8,371,200.0
Plexcide 15G Chemplex Biocide Didecyl Dimethyl Ammonium Chloride 7173-51-5 3 0.000664114 499.185
Ethanol 64-17-5 3 0.000664114 499.185
Alkyl Dimethyl Benzyl Ammonium Chloride 68424-85-1 3 0.000664114 499.185
Glutaraldehyde 111-30-8 14 0.0030992 2329.53
Hydrochloric Acid (15%) Reagent Acidizing Hydrochloric Acid 7647-01-0 15 0.0886101 66604.3
Plexhib 256 Chemplex Acid Inhibitor Polyethoxylated Alcohol Surfactant 68951-67-7 30 0.000229148 172.241
Methyl Alcohol 67-56-1 60 0.000458297 344.482
Thiourea/Formaldehyde Copolymer 68527-49-1 30 0.000229148 172.241
Propargyl Alcohol 107-19-7 10 0.00007638 57.414
C-14 to C-16 Alpha Olefins 64743-02-8 5 0.00003819 28.707
Plexbreak 145 Chemplex Non-Emulsifier Diethanolamine 111-42-2 3 0.00002558 19.227
Methyl Alcohol 67-56-1 15 0.000127897 96.134
Cocamide Based Surfactant Proprietary 10 0.00008526 64.09
2-Butoxyethanol 111-76-2 15 0.000127897 96.134
Plexslick 957 Chemplex Friction Reducer Paraffinic, Naphtehenic Solvent 64742-47-8 30 0.0280363 21073.7
Ammonium Chloride 12125-02-9 5 0.00467272 3512.28
Poly (acrylamide-co-acrylic acid), partial sodium salt 62649-23-4 35 0.0327091 24586
Nonionic Surfactants Proprietary 1.5 0.00140182 1053.68
Greenhib 679 Chemplex Friction Reducer Glycerine 56-81-5 20 0.0048345 3633.88
Proprietary Proprietary 35 0.00846037 6359.29
Chemplex 4-N-1 Chemplex Combination/Iron Control Acetic Acid 64-19-7 85 0.000251001 188.666
Propargyl Alcohol 107-19-7 1 0.00000295 2.22
Alcohol Ethoxylate Surfactants Proprietary 2 0.00000591 4.439
thiourea-formaldehyde copolymer 68527-49-1 2 0.00000591 4.439
n-olefins Proprietary 1 0.00000295 2.22
Methyl Alcohol 67-56-1 10 0.00002953 22.196
2-Ethylhexanol 104-76-7 10 0.00002953 22.196
Cocamide Diethanolamine Salt 68603-42-9 2 0.00000591 4.439
Diethanolamine 111-42-2 2 0.00000591 4.439
Water Select Carrier/Base Fluid Water 7732-18-5 100 88.1277 66,241,700.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-11-03 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CABOT OIL & GAS CORP 120,130.01 25 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 1,143,821.04 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 656,665.06 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 451,036.23 359 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 484,230.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 413,175.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CABOT OIL & GAS CORP Fracing Fluid Waste 897.99 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2014 CABOT OIL & GAS CORP Fracturing Fluid Waste 14.55 Tons LANDFILL UT2300249
2014 CABOT OIL & GAS CORP Fracing Fluid Waste 11,574.27 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Fracing Fluid Waste 5,366.82 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CABOT OIL & GAS CORP Drill Cuttings 1,401.45 Tons LANDFILL 101247
2014 CABOT OIL & GAS CORP Drilling Fluid Waste 44.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2015 CABOT OIL & GAS CORP Fracing Fluid Waste 606.47 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 11,022.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 42.75 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 84.56 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE004
2016 CABOT OIL & GAS CORP Waste Water Treatment Sludge 1.07 Tons LANDFILL 301358
2016 CABOT OIL & GAS CORP Produced Fluid 1,290.55 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 797.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 121.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 41.87 Bbl REUSE (AT WELL PAD)
2017 CABOT OIL & GAS CORP Produced Fluid 480.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 0.64 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Produced Fluid 899.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 75.22 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 1,008.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 195.53 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Produced Fluid 521.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 163.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 1,332.31 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2278000 Primary Facility 2014-06-11 Preoperation Inspection No Violations Noted The Department was on site at the Cabot Well Site and Tank Pad to conduct a Preoperational Inspection. The well permits that have been issued for this pad are the Plonski I 1H (115-21698), 2H (115-21699), 3H (115-21700), and the 4H (115-21701). All perimeter BMP’s in place to include red lined additions. Pad is approximately 98% complete. No violations noted.
2278011 Primary Facility 2014-05-28 Routine/Complete Inspection No Violations Noted The Department conducted an inspection of the Cabot Plonski I well pad on 5/28/14. The site is approximately 50% complete. Both sediment traps are in place. Perimeter controls appear to be installed properly, but site is currently not developed enough to determine if controls installed in proper locations. No violations noted. This inspection does not qualify as a preoperational inspection.
2282599 Primary Facility 2014-06-25 Routine/Complete Inspection No Violations Noted The following wells which have been spud on this pad are the Plonski I 1H (115-21698), 2H (115-21699), 3H (115-21700), and the 4H (115-21701). A crew is on-site installing a liner for a drill rig.
2284283 Primary Facility 2014-06-17 Drilling/Alteration No Violations Noted UDI spudder rig on location
2294087 Primary Facility 2014-07-21 Follow-up Inspection No Violations Noted Arrived at the site at 12:25 to conduct a Follow-up inspection in relation to a hydraulic fluid spill that occurred on 6/24/14. It was reported that an estimated (20) gallons of hydraulic fluid fluid was spilled to the pad surface. The spill has been reported as cleaned up. The Deparmtent is awaiting a spill report from Cabot.
2298782 Primary Facility 2014-08-21 Drilling/Alteration No Violations Noted
2311216 Primary Facility 2014-10-09 Administrative/File Review No Violations Noted On 6/24/14, Cabot Oil and Gas reported a 20 gallon release of hydraulic fluid to the ground due to the failure of a master cylinder of a dump truck. Cabot emailed an electronic copy of their remediation summary report for this spill. Attached is a copy of that report. After a review of the report, the Department concludes that the spill response was adequate and that no further action is required by the Department. VIOIC associated with Inspection Record # 2282584.
2421130 Primary Facility 2015-10-23 Routine/Complete Inspection No Violations Noted The Department was on site to perform a routine complete inspection at the Plonski I Well Pad (ESG13-115-0085). The wells associated with this site are:
2453889 Primary Facility 2016-02-23 Routine/Complete Inspection No Violations Noted On 2/23/16, the Department collected water samples from a nearby complainant. The samples were clear with no effervescence observed. The nearest gas well activity/development to the complainant’s water well are the following 3 Cabot well pads:

Reilly J Pad This is the closest pad and is located approximately 2900’ away. There is only one well on this pad, the 3H which is in production. The well was spud on 8/10/2012, drilling was completed on 10/12/2012, and stimulation was completed on 1/10/2013.

Plonski I Pad This pad is located approximately 3500’ away. There are 5 producing wells on this pad. All the wells were spud in June, 2014 with stimulation completed for all three wells in November, 2014.

Stellitano A Pad This pad is located approximately 4000’ away. There are 8 drilled wells on this pad that are currently being stimulated.

There are no violations associated with this complaint inspection.

2477052 Primary Facility 2016-04-21 Routine/Complete Inspection No Violations Noted
2498557 Primary Facility 2016-07-05 Routine/Complete Inspection No Violations Noted
2579198 Primary Facility 2017-04-03 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 13:25p.m.

The cellar was about half full of water and ice with no bubbling noticed. The (13x9) annulus vent pipe was open and venting into a small plastic tank, the (9x5) annulus vent pipe was open and venting into a small plastic tank. There was 641psi on the production casing. I took a walk around the location and there were no obvious concerns noticed. I left the site at 14:05p.m.

2618197 Primary Facility 2017-07-24 Routine/Complete Inspection No Violations Noted Today' inspection, 7/20/17 is being conducted as a routine inspection. A work over rig is on-site working. The entire site is stable. Rig appears to have good containment. All slopes stable, no violations noted. No photos attached due to a technical glitch.
2684106 Primary Facility 2018-01-18 Routine/Complete Inspection No Violations Noted At time of inspection.

The (20x13) annulus was above the ice in the cellar and there was no gas detected. The (13x9) and (9x5) annuli vent pipes were connected together and venting to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2759476 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. No E&S issues identified. No violations noted.
2782103 Primary Facility 2018-09-25 Routine/Complete Inspection No Violations Noted Today's inspection has been conducted as a routine inspection. Site has good site stabilization. No E&S issues identified. No violations noted.
2784481 Primary Facility 2018-10-04 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 5.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2800540 Primary Facility 2018-11-06 Routine/Complete Inspection No Violations Noted This inspection was conducted to confirm Cabot's assessment that the project meets the minimum requirements for permit termination. The Department’s determination is that the site meets the requirements for permit termination. I recommend the NOT be approved.

For data sources see[9]