If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-21476 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.961514,"lon":-76.061014,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Apolacon Township | |
Operator Name: REPSOL OIL & GAS USA LLC | |
Well Pad ID: 150471 | |
Farm/Lease Name: BUTLER 07 086 10 J 10H | |
License Status: Active | |
Spud Date: 2014-02-04 | |
Permit Date: 2013-10-09 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.961514 | |
Longitude: -76.061014 |
Date | Event |
---|---|
2013-10-09 | New Permit Application |
2013-11-22 | New Permit Application |
2013-11-25 | Performed Spud Operation |
2014-02-20 | Drilling Completion |
2014-04-06 | Perforation |
2014-04-09 | Perforation |
2014-04-09 | Performed Stage 1 of Stimulation |
2014-04-09 | Performed Stage 2 of Stimulation |
2014-04-10 | Perforation |
2014-04-10 | Performed Stage 3 of Stimulation |
2014-04-10 | Performed Stage 4 of Stimulation |
2014-04-10 | Performed Stage 5 of Stimulation |
2014-04-11 | Perforation |
2014-04-11 | Performed Stage 6 of Stimulation |
2014-04-11 | Performed Stage 7 of Stimulation |
2014-04-11 | Performed Stage 8 of Stimulation |
2014-04-12 | Perforation |
2014-04-12 | Performed Stage 10 of Stimulation |
2014-04-12 | Performed Stage 11 of Stimulation |
2014-04-12 | Performed Stage 9 of Stimulation |
2014-04-13 | Perforation |
2014-04-13 | Performed Stage 12 of Stimulation |
2014-04-13 | Performed Stage 13 of Stimulation |
2014-04-13 | Performed Stage 14 of Stimulation |
2014-04-14 | Perforation |
2014-04-14 | Performed Stage 15 of Stimulation |
2014-04-14 | Performed Stage 16 of Stimulation |
2014-04-14 | Performed Stage 17 of Stimulation |
2014-04-14 | Performed Stage 18 of Stimulation |
2014-04-15 | Perforation |
2014-04-16 | Perforation |
2014-04-16 | Performed Stage 22 of Stimulation |
2014-04-16 | Performed Stage 23 of Stimulation |
2014-04-16 | Performed Stage 24 of Stimulation |
2015-04-15 | Performed Stage 19 of Stimulation |
2015-04-15 | Performed Stage 20 of Stimulation |
2015-04-15 | Performed Stage 21 of Stimulation |
2019-01-15 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-04-16 | 2014-04-16 | 5,923 | 6,375,880 | 46,500 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AI-7NR (Acid Inhibitor) | Trican | Acid Inhibitor | Prop-2-yn-1-ol | 107-19-7 | 1 | 0.00001400 | 9.51376 |
Water | Customer | Carrier | Water | 7732-18-5 | 100 | 78.1241 | 53,209,300.0 | |
Other Chemicals | Acrylamide P/W acrylic acid ammonium salt | 26100-47-0 | 0 | 0 | 0 | |||
Sorbitan monooleate | 1338-43-8 | 0 | 0 | 0 | ||||
Alkyloxypolyethylene oxyethanol | 84133-50-6 | 0 | 0 | 0 | ||||
Nonionic Surfactant | Proprietary | 0 | 0 | 0 | ||||
Acrylamide | 79-06-1 | 0 | 0 | 0 | ||||
Polyethylene glycol monooleate | 9004-96-0 | 0 | 0 | 0 | ||||
Isopropanol | 67-63-0 | 0 | 0 | 0 | ||||
Water | 7732-18-5 | 0 | 0 | 0 | ||||
Trade Secret | Proprietary | 0 | 0 | 0 | ||||
Anionic polyacrylamide copolymer | Proprietary | 0 | 0 | 0 | ||||
Sorbitol Tetraoleate | 61723-83-9 | 0 | 0 | 0 | ||||
Ammonium Acrylate | 10604-69-0 | 0 | 0 | 0 | ||||
White 40/70 | Trican | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 8.47314 | 5,770,940.0 | |
LSI-21 (Scale Inhibitor) | Trican | Scale Inhibitor | Acrylic Polymer | 28205-96-1 | 15 | 0.00384 | 2615.7 | |
Sodium Salt of Phosphate Ester | 68131-72-6 | 15 | 0.00384 | 2615.7 | ||||
100 Mesh, Bulk (over 20K lbs)* | Trican | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 7.54392 | 5,138,060.0 | |
FEAC-20 (Iron Control) | Trican | Iron Control | Acetic acid | 64-19-7 | 45 | 0.001483 | 1010.36 | |
Citric acid | 77-92-9 | 30 | 0.000989 | 673.574 | ||||
15% HCL | Trican | Carrier | Hydrochloric acid | 7647-01-0 | 15 | 0.000983 | 669.719 | |
White 30/50 | Trican | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 5.17435 | 3,524,180.0 | |
7 1/2% HCL | Trican | Carrier | Hydrochloric acid | 7647-01-0 | 7.5 | 0.009531 | 6491.26 | |
FR-8 | Trican | Friction Reducer | Ammonium Chloride | 12125-02-9 | 1.5 | 0.000798 | 543.544 | |
Petroleum distillates, hydrotreated heavy paraffinic | 64742-54-7 | 8 | 0.004256 | 2898.9 | ||||
Mineral oil/ light hydrotreated pet. distillate | 64742-47-8 | 28 | 0.014897 | 10146.1 | ||||
Petroleum distillates, dewaxed heavy paraffinic | 64742-65-0 | 8 | 0.004256 | 2898.9 | ||||
AQUCAR DB 5 (Water Treatment Microbiocide) | Trican | Biocide | Sodium Bromide | 7647-15-6 | 1.5 | 0.000393 | 267.87 | |
Polyethylene glycol | 25322-68-3 | 65.2 | 0.017095 | 11643.4 | ||||
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 5 | 0.001311 | 892.899 | ||||
Dibromoacetonitrile | 3252-43-5 | 0.5 | 0.000131 | 89.2899 | ||||
3 1/2% HCL | Trican | Carrier | Hydrochloric acid | 7647-01-0 | 3.5 | 0.015439 | 10515.2 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-04-09 | 1 | White | 6,386,478 | 7,930 | 8,626 |
2014-04-09 | 2 | White | 6,386,478 | 8,015 | 8,632 |
2014-04-10 | 3 | White | 6,386,478 | 7,799 | 8,596 |
2014-04-10 | 4 | White | 6,386,478 | 8,155 | 8,880 |
2014-04-10 | 5 | White | 6,386,478 | 7,976 | 8,642 |
2014-04-11 | 6 | White | 6,386,478 | 7,712 | 8,567 |
2014-04-11 | 7 | White | 6,386,478 | 8,052 | 8,827 |
2014-04-11 | 8 | White | 6,386,478 | 8,416 | 9,025 |
2014-04-12 | 9 | White | 6,386,478 | 8,299 | 9,099 |
2014-04-12 | 10 | White | 6,386,478 | 8,311 | 8,934 |
2014-04-12 | 11 | White | 6,386,478 | 8,375 | 9,038 |
2014-04-13 | 12 | White | 6,386,478 | 8,596 | 9,014 |
2014-04-13 | 13 | White | 6,386,478 | 8,130 | 9,038 |
2014-04-13 | 14 | White | 6,386,478 | 7,750 | 8,516 |
2014-04-14 | 15 | White | 6,386,478 | 7,905 | 8,472 |
2014-04-14 | 16 | White | 6,386,478 | 7,842 | 8,811 |
2014-04-14 | 17 | White | 6,386,478 | 7,512 | 8,475 |
2014-04-14 | 18 | White | 6,386,478 | 7,047 | 8,575 |
2015-04-15 | 19 | White | 6,386,478 | 7,067 | 8,427 |
2015-04-15 | 20 | White | 6,386,478 | 6,837 | 8,719 |
2015-04-15 | 21 | White | 6,386,478 | 6,657 | 8,440 |
2014-04-16 | 22 | White | 6,386,478 | 7,505 | 8,364 |
2014-04-16 | 23 | White | 6,386,478 | 7,415 | 8,254 |
2014-04-16 | 24 | White | 6,386,478 | 6,689 | 8,547 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | REPSOL OIL & GAS USA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | REPSOL OIL & GAS USA LLC | 114,829.00 | 17 | 0.00 | 0 | 0.00 | 0 |
2015 | REPSOL OIL & GAS USA LLC | 1,168,144.90 | 358 | 0.00 | 0 | 0.00 | 0 |
2016 | REPSOL OIL & GAS USA LLC | 927,038.40 | 357 | 0.00 | 0 | 0.00 | 0 |
2017 | REPSOL OIL & GAS USA LLC | 673,229.90 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | REPSOL OIL & GAS USA LLC | 520,628.30 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | REPSOL OIL & GAS USA LLC | 420,136.60 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | REPSOL OIL & GAS USA LLC | Drill Cuttings | 14.91 Tons | LANDFILL | 8-0728-0004/013 |
2014 | REPSOL OIL & GAS USA LLC | Fracing Fluid Waste | 200.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | REPSOL OIL & GAS USA LLC | Fracing Fluid Waste | 15,777.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | REPSOL OIL & GAS USA LLC | Fracing Fluid Waste | 910.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | REPSOL OIL & GAS USA LLC | Fracturing Fluid Waste | 35.73 Tons | LANDFILL | 100361 |
2014 | REPSOL OIL & GAS USA LLC | Produced Fluid | 300.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | REPSOL OIL & GAS USA LLC | Produced Fluid | 400.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | REPSOL OIL & GAS USA LLC | Drill Cuttings | 1,294.13 Tons | LANDFILL | 8-0728-0004/013 |
2015 | REPSOL OIL & GAS USA LLC | Produced Fluid | 2,512.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | REPSOL OIL & GAS USA LLC | Produced Fluid | 6,287.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | REPSOL OIL & GAS USA LLC | Produced Fluid | 3,593.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 4,469.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 404.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 520.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 305.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 2,547.00 Bbl | REUSE (AT WELL PAD) | |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 495.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 1,985.00 Bbl | REUSE (AT WELL PAD) | |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 390.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 971.00 Bbl | REUSE (AT WELL PAD) | |
2019 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 105.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2219102 | Primary Facility | 2013-11-05 | Preoperation Inspection | No Violations Noted | |
2235852 | Primary Facility | 2014-01-07 | Routine/Complete Inspection | No Violations Noted | |
2357372 | Primary Facility | 2015-04-02 | Routine/Complete Inspection | No Violations Noted | |
2437796 | Primary Facility | 2016-01-05 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 12:00 p.m., the cellar was full of water with ice on the top, the (9x5) vent pipe was open and venting into the atmosphere with gas detected at 100% LEL and 16% methane, there was 954psi on the production casing and 949psi on the production tubing, I took a walk around the location and everything looked OK.
I left the site at 12:15 p.m. |
2451953 | Primary Facility | 2016-02-08 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a Routine Complete inspection of the Butler Well Pad (ESG13-115-0089). The well associated with this site is as follows:
115-21476. The site was well vegetated and there were no eroional issues apparent at this time.
If there are any questions, please feel free to contact me. |
2472032 | Primary Facility | 2016-03-16 | Routine/Partial Inspection | No Violations Noted | The Department was on site to conduct a Routine Partial Inspection of the Butler Well Site located in Apolacon Township, Susquehanna County. At the time of the inspection, it appeared as though the well site met temporary stabilization requirements. Steve Haight signed off for an inspection on 3/15/16. There was a small area of stained rock on the access road close to the well pad. The Department requests that the operator investigate this issue, within 2 days of receipt of this report, and contact the Department with your findings. |
2543578 | Primary Facility | 2016-12-07 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 10:00a.m., the cellar was about a quarter full of water with no bubbling noticed, there was cement between the (20x13) and (13x9) annuli’s with no gas detected, the (9x5) vent pipe was open and venting into the atmosphere with gas detected at 100% LEL and peaked at 8% methane with no measurable flow, there was 660psi on the production casing and 354psi on the production line. Phillip Kithcart was pumping water through the production line to clear salt in the line. I took a walk around the location and there were no obvious concerns noticed.
I left the site at 10:40a.m. |
2628874 | Primary Facility | 2017-08-24 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. I detected gas at the (9x5) annulus, it peaked at 84% LEL and 6% methane. There was a flat bed trailer with chemical containers on it that was on containment. The containment had two holes that I noticed, l called Kriss Perritt of Repsol to let him know of the holes. There was no indications of the containers leaking. |
2735717 | Primary Facility | 2018-05-29 | Routine/Complete Inspection | No Violations Noted | Jon Sassi and I inspected the Butler well pad for a RTNC inspection. The wells associated with this pad are as follows: 115-21476. The cut and fill slopes were well vegetated. There was a stockpile of stone to repair the rce on hand near the entrance. The access road and pad surface were both solid and stable. There were no noted erosional issues at the time of inspection.
There were no violations observed. |
2739241 | Primary Facility | 2018-06-08 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water 3.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. There was cement between the (20x13) and (13x9) annuli and there was no gas detected. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2835128 | Primary Facility | 2019-02-04 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was full of snow and ice, I was unable to check for gas. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[9]