X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-21315

Well Details

Well ID: 37-115-21315
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Gibson Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 145684
Farm/Lease Name: BINIEWICZ S 3
License Status:
Spud Date:
Permit Date: 2013-07-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.802050
Longitude: -75.656014

For data sources see[1][2][3]

Well History

Date Event
2013-07-11 New Permit Application
2013-08-31 Performed Spud Operation
2013-11-04 Drilling Completion
2014-01-09 Perforation
2014-01-31 Performed Stimulation
2014-05-01 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-01-30 2014-02-19 6,732 6,658,180 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Ferrotrol 300L Baker Hughes Iron Control Citric Acid 77-92-9 60 0.0007577 479.13
FRW-18 Baker Hughes Friction Reducer Petroleum Distillates 64742-47-8 30 0.0276383 17477.4
Water Operator Carrier Water 7732-18-5 100 87.7894 55,514,500.0
Scaletrol 720 Baker Hughes Scale Inhibitor Ethylene Glycol 107-21-1 30 0.0045047 2848.6
Calcium Chloride 10043-52-4 5 0.0007508 474.767
Other Chemicals Modified Thiorea Polymer 68527-49-1 0 0.00006100 38.57
Sorbitan Monooleate Trade Secret 0 0.0046064 2912.9
Formaldehyde 50-00-0 0 0.00000870 5.51
Sodium Chloride 7647-14-5 0 0.00000450 2.8486
Poly (acrylamide-co-acrylic acid) Trade Secret 0 0.0276383 17477.4
Ethoxylated Alcohol Trade Secret 0 0.0018426 1165.16
Salt Trade Secret 0 0.0046064 2912.9
Polyacrylate Trade Secret 0 0.0030031 1899.07
Water 7732-18-5 0 0.0679354 42959.7
Hydrochloric Acid 7647-01-0 0 0.00000870 5.51
Potassium Chloride 7447-40-7 0 0.00000750 4.7477
Sand, White, 40/70 Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100 10.8707 6,874,200.0
Alpha 1427 Baker Hughes Biocide Ethanol 64-17-5 5 0.0011436 723.188
Quaternary Ammonium Compound 68424-85-1 5 0.0011436 723.188
Glutaraldehyde 111-30-8 30 0.0068618 4339.13
Didecyl Dimethyl Ammonium Chloride 7173-51-5 10 0.0022873 1446.38
Sand, White, 100 mesh Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100 0.602821 381200
CI-14 Baker Hughes Corrosion Inhibitor Fatty Acids Trade Secret 10 0.00008710 55.1
Polyoxyalkylenes Trade Secret 30 0.0002614 165.3
Methanol 67-56-1 100 0.0008713 551
Propargyl Alcohol 107-19-7 5 0.00004360 27.55
Olefin Trade Secret 5 0.00004360 27.55
HCl, 10.1 - 15% Baker Hughes Acidizing Water 7732-18-5 85 0.493799 312259
Hydrochloric Acid 7647-01-0 15 0.0871409 55104.5

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-01-31 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 892,786.94 108 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 1,453,635.97 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 950,232.05 365 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 513,343.19 357 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 616,987.00 334 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 595,964.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CABOT OIL & GAS CORP Drilling Fluid Waste 26.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2013 CABOT OIL & GAS CORP Drill Cuttings 994.43 Tons LANDFILL 8-0728-0004/013
2014 CABOT OIL & GAS CORP Fracing Fluid Waste 23.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2014 CABOT OIL & GAS CORP Produced Fluid 3,593.95 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Fracing Fluid Waste 11,002.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 2,816.68 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 5.61 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 10.78 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE004
2016 CABOT OIL & GAS CORP Produced Fluid 314.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 411.07 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 0.96 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Produced Fluid 182.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 219.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017 CABOT OIL & GAS CORP Produced Fluid 148.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 13.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Produced Fluid 482.68 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 104.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 32.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 564.41 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2197541 Primary Facility 2013-08-21 Routine/Complete Inspection No Violations Noted The Department was on site at the Biniewicz, S. Pad to conduct a Preoperational Inspection. Well permits that have been issued for this pad are the 1H (115-21313), 2H (115-21314), 3H (115-21315), 5H (115-21317), and the 6H (115-21318). All perimeter BMP’s in place. Pad is approximately 95% complete. No violations noted.
2240622 Primary Facility 2014-01-29 Drilling/Alteration No Violations Noted
2257204 Primary Facility 2014-03-26 Routine/Complete Inspection No Violations Noted
2316024 Primary Facility 2014-10-24 Routine/Complete Inspection No Violations Noted The Department conducted an inspection of the Cabot Biniewicz, S. Pad on 10/24/14 in response to a nearby water supply complaint. There are 6 wells drilled and in production on this pad. They are: Biniewicz 1H (115-21313), 2H (115-21314), 3H (115-21315), 4H (115-21316), 5H (115-21317), and the 6H (115-21318). The inspection revealed that the pad was constructed per the plan. There has been no drilling activity on this pad for the last 6 months. No violations were observed at the pad site.
2468338 Primary Facility 2016-03-25 Routine/Complete Inspection No Violations Noted
2513813 Primary Facility 2016-08-25 Routine/Complete Inspection No Violations Noted On 8/25/16, the Department conducted an inspection of the COG Biniewicz, S. Pad located in Gibson Township, Susquehanna County. Last Cabot E&S inspection documented at site as having been conducted on 8/22/16. The entrance to the access road is also the shared driveway and parking area for a house located at the entrance. The access road is paved for about 50’. All six wells have been drilled, stimulated, and appear to be in production. The well pad berms have been eliminated. The tank pad has been reclaimed with what appears to be the tank pad modified material for the pad having been used to create an access road presumably for the landowners use to access his property from the well pad access road. The new owner access road cuts across the old tank pad location and proceeds to the wood line across the diversion swale. A cross culvert pipe has been placed in this swale. The culvert pipe is elevated approximately 1’ from the contour of the diversion swale. Recent heavy rain events suggest this cha
2530206 Primary Facility 2016-10-13 Routine/Complete Inspection No Violations Noted
2530338 Primary Facility 2016-10-12 Routine/Complete Inspection No Violations Noted
2542192 Primary Facility 2016-12-07 Routine/Complete Inspection No Violations Noted The Department was on site, to conduct a Routine Complete Inspection, in response to the submittal of a Restoration Report. The E&S Inspection Log indicated that Stephen P. Opteka conducted the most recent inspection on 12/1/16 and it was a Post Rain Event Inspection.

On site it was noted that what appeared to be new filter sock was situated along the access road and well site and it appeared to be in place for the pipeline. The PCSM/ Site Restoration Plan 1 Map noted that the proposed earthen level spreader has been substitutued for an existing subsurface level spreader.

The tank pad has been removed and is now vegetated.

2552337 Primary Facility 2017-01-12 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 11:35a.m., the cellar was about three quarters full of water and ice with no bubbling noticed. The (13x9) vent pipe was open and venting into a small plastic tank, the (9x5) vent pipe was open and venting into a small plastic tank. There was 591psi on the production casing. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 12:15p.m.

2639961 Primary Facility 2017-09-26 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was containment at the 5H and appeared tubing was recently put in the wells. All the annulus vent pipes were connected together and going to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2655040 Primary Facility 2017-10-26 Site Restoration No Violations Noted This inspection was conducted to confirm Cabot's assessment that the project meets the minimum requirements for permanent stabilization. The Departments determination is that the site meets the requirements for permit termination.
2745577 Primary Facility 2018-06-26 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 2' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2844928 Primary Facility 2019-02-26 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was ice 1.5' below grade in the cellar and I was unable to check for gas. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was no gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 2/5/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[9]

References