If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-21208 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.662058,"lon":-75.818806,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Lathrop Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 144968 | |
Farm/Lease Name: CARPENETTI R 7 | |
License Status: | |
Spud Date: | |
Permit Date: 2013-04-09 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.662058 | |
Longitude: -75.818806 |
Date | Event |
---|---|
2013-04-09 | New Permit Application |
2013-05-24 | Performed Spud Operation |
2013-07-25 | Drilling Completion |
2013-10-07 | Perforation |
2013-10-24 | Performed Stimulation |
2014-03-11 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-23 | 2013-11-02 | 7,555 | 7,944,340 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 40/70 White | FTSI | proppant | Silica, Quartz | 14808-60-7 | 100 | 0.104882 | 7,877,800.0 |
CI-150 | FTSI | Acid Corrosion Inhibitor | Fatty Acid Salt | Proprietary | 0.1 | 0.00000001 | 0.72 | |
Ethylene Glycol | 107-21-1 | 30 | 0.00000288 | 216.48 | ||||
Aromatic aldehyde | Proprietary | 10 | 0.00000096 | 72.16 | ||||
Dimethylformamide | 68-12-2 | 10 | 0.00000096 | 72.16 | ||||
Fatty Acid | Proprietary | 0.1 | 0.00000001 | 0.72 | ||||
Diethylene glycol | 111-46-6 | 1 | 0.00000010 | 7.22 | ||||
Water | 7732-18-5 | 5 | 0.00000048 | 36.08 | ||||
Aliphatic alcohol | Proprietary | 0.1 | 0.00000001 | 0.72 | ||||
Quaternary ammonium compound | Proprietary | 10 | 0.00000096 | 72.16 | ||||
Organic amine resin salt | Proprietary | 30 | 0.00000288 | 216.48 | ||||
Alkylene Oxide Block Polymer | Proprietary | 10 | 0.00000096 | 72.16 | ||||
Isopropanol | 67-63-0 | 30 | 0.00000288 | 216.48 | ||||
100 Mesh Sand | FTSI | proppant | Silica, Quartz | 14808-60-7 | 100 | 0.00588329 | 441900 | |
Hydrochloric Acid (HCl) | FTSI | Acid | Water | 7732-18-5 | 85 | 0.00462577 | 347446 | |
Hydrogen Chloride | 7647-01-0 | 15 | 0.000816312 | 61314 | ||||
CS-500 SI | FTSI | Scale inhibitor | Acrylic Polymer | Proprietary | 0 | 0 | 0 | |
Sodium Polyacrylate | 9003-04-7 | 5 | 0.00001496 | 1123.56 | ||||
Water | 7732-18-5 | 55 | 0.000164545 | 12359.1 | ||||
Ethylene glycol | 107-21-1 | 10 | 0.00002992 | 2247.12 | ||||
Sodium chloride | 7647-14-5 | 6 | 0.00001795 | 1348.27 | ||||
BXL-2 | FTSI | Borate crosslinker | Potassium hydroxide | 1310-58-3 | 12 | 0.00000058 | 43.33 | |
Boric acid | 10043-35-3 | 15 | 0.00000072 | 54.17 | ||||
Water | 7732-18-5 | 75 | 0.00000361 | 270.84 | ||||
Sodium metaborate | 10555-76-7 | 25 | 0.00000120 | 90.28 | ||||
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 0.882106 | 66,255,800.0 | |
APB-1 | FTSI | Gel breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.00000027 | 20 | |
FRW-200 | FTSI | Friction reducer | Alkyloxypolyethyleneoxyethanol | 84133-50-6 | 1 | 0.00001038 | 779.79 | |
Acrylamide | 79-06-1 | 0.1 | 0.00000104 | 77.98 | ||||
Ammonium Acrylate | 10604-69-0 | 0.5 | 0.00000519 | 389.89 | ||||
Alcohols (C12-C14), ethoxylated | 68439-50-9 | 4 | 0.00004153 | 3119.15 | ||||
Ammonium Chloride | 12125-02-9 | 12 | 0.000124581 | 9357.44 | ||||
Surfactant | Proprietary | 7 | 0.00007267 | 5458.5 | ||||
Alcohols (C12-C16), ethoxylated | 68551-12-2 | 4 | 0.00004153 | 3119.15 | ||||
Isopropanol | 67-63-0 | 0.3 | 0.00000311 | 233.94 | ||||
Water | 7732-18-5 | 48 | 0.000498326 | 37429.8 | ||||
Polyethylene glycol monooleate | 9004-96-0 | 3 | 0.00003115 | 2339.36 | ||||
Acrylamide P/W acrylic acid, ammonium salt | 26100-47-0 | 25 | 0.000259545 | 19494.7 | ||||
Hydrotreated heavy paraffinic | 64742-54-7 | 5 | 0.00005191 | 3898.93 | ||||
Dewaxed heavy paraffinic | 64742-65-0 | 1.5 | 0.00001557 | 1169.68 | ||||
Sorbitol Tetraoleate | 61723-83-9 | 2 | 0.00002076 | 1559.57 | ||||
Copolymer of acrylamide and sodium acrylate | 25987-30-8 | 33 | 0.000342599 | 25733 | ||||
Petroleum distillate hydrotreated light | 64742-47-8 | 26 | 0.000269927 | 20274.5 | ||||
Sorbitan Monooleate | 1338-43-8 | 3 | 0.00003115 | 2339.36 | ||||
Alcohols (C10-C16), ethoxylated | 68002-97-1 | 4 | 0.00004153 | 3119.15 | ||||
FE-100L | FTSI | Iron control | Citric acid | 77-92-9 | 55 | 0.00000949 | 712.93 | |
Water | 7732-18-5 | 60 | 0.00001035 | 777.74 | ||||
BIO-3240 | FTSI | Biocide | Dazomet (Tetrahydro-3, 5-dimethyl-2H-1, 3, 5-thiadiazine-2-thione. |
533-74-4 | 24 | 0.00007269 | 5459.83 | |
Water | 7732-18-5 | 55 | 0.000166582 | 12512.1 | ||||
Sodium Hydroxide | 1310-73-2 | 23 | 0.00006966 | 5232.34 | ||||
HVG-1 | FTSI | Water Gelling Agent | Clay | 14808-60-7 | 2 | 0.00000030 | 22.27 | |
Surfactant | 154518-36-2 | 1 | 0.00000015 | 11.14 | ||||
Clay | 1302-78-9 | 5 | 0.00000074 | 55.68 | ||||
Raffinates (Petroleum), Sorption Process | 64741-85-1 | 50 | 0.00000741 | 556.8 | ||||
Petroleum Distillate | 64742-47-8 | 55 | 0.00000815 | 612.48 | ||||
Surfactant | 24938-91-8 | 1 | 0.00000015 | 11.14 | ||||
Surfactant | 9043-30-5 | 1 | 0.00000015 | 11.14 | ||||
Guar Gum | 9000-30-0 | 55 | 0.00000815 | 612.48 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-10-24 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CABOT OIL & GAS CORP | 136,410.37 | 35 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 1,644,581.33 | 362 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 1,410,723.38 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 1,181,476.20 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 903,096.82 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 764,369.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 452,833.00 | 237 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,660.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 16,776.28 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Drill Cuttings | 583.60 Tons | LANDFILL | 101247 |
2013 | CABOT OIL & GAS CORP | Drill Cuttings | 506.81 Tons | LANDFILL | THR029 |
2013 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 102.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 2,585.25 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1,621.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 2,852.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 7,122.83 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 93.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 8.12 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 849.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 181.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 394.98 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 144.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Soil Contaminated by Oil | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 245.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Soil Contaminated by Oil & Gas Related Spills | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 252.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 124.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 672.65 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 484.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2167831 | Primary Facility | 2013-05-07 | Routine/Partial Inspection | No Violations Noted | -The roadside ditches have not been lined and they have not been shaped as per design. |
2167942 | Primary Facility | 2013-05-08 | Follow-up Inspection | No Violations Noted | |
2167983 | Primary Facility | 2013-05-02 | Routine/Partial Inspection | No Violations Noted | |
2179931 | Primary Facility | 2013-06-12 | Drilling/Alteration | No Violations Noted | Spudder rig on location |
2489091 | Primary Facility | 2016-05-31 | Site Restoration | No Violations Noted | Inspection of the Carpenetti P1 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit.
The site has been stabilized and vegetation was found to be greater than 70% uniform perennial growth. Temporary E&S BMPs have been removed from the site. No E&S problems were observed at the time of the inspection. The restored pad size is consistent with the PCSM/Site Restoration Plan. Post construction storm water management devices were in place according to approved plans and appear to be functioning properly. Based on the site inspection, I recommend this notice of termination be APPROVED. |
2639132 | Primary Facility | 2017-08-09 | Routine/Complete Inspection | No Violations Noted | Today's inspection, 8/9/17 was conducted as a routine inspection. 4 wells have been drilled and all appear to be in production. Very good stability exists at this site. Perennial vegetation is well established. No violations noted. |
2732834 | Primary Facility | 2018-05-18 | Preoperation Inspection | No Violations Noted | The Department (Casy Baldwin and I) was on site to conduct a Preoperational Inspection in accordance with 3258(a.1). Upon arrival the Department reviewed the E&S Inspection Log which indicated that the most recent inspection was conducted on 5/17/18. The Department met with Mike Murnin (Construction Foreman-Cabot ) and Larry Cheatwood (Company Man-Cabot). This site was previously permitted under ESCGP ESX12-115-0191. The previous ESCGP was Terminated in May of 2016 and was re-permitted under the new ESCGP2 to enlarge the pad and drill an additional 9 wells. At the time of the inspection they were placing shot rock on the site. On the eastern side of the access road where it meets the pad they redlined a ditch on the fill and will grade it back and allow stormwater to travel to the previously existing access road roadside ditch. |
For data sources see[9]