X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-21136

Well Details

Well ID: 37-115-21136
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Lathrop Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 147108
Farm/Lease Name: D MCLEAN 1
License Status:
Spud Date:
Permit Date: 2013-01-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.662481
Longitude: -75.776767

For data sources see[1][2][3]

Well History

Date Event
2013-01-15 New Permit Application
2013-03-06 Performed Spud Operation
2013-05-12 Drilling Completion
2013-05-20 Perforation
2013-06-13 Performed Stimulation
2014-03-11 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-06-12 2013-06-21 7,655 12,760,700

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 WBK-134 WFT Breaker Ammonium Persulfate 7727-54-0 75 0.00001850 30
WAI-251LC WFT Inhibitor 1-Decanol 112-30-1 5 0.00005570 1354.79
Isopropyl Alcohol 67-63-0 5 0.00005570 1354.79
Triethylphosphate 78-40-0 5 0.00005570 1354.79
2-Butoxyethanol 111-76-2 10 0.000111402 1354.79
N,N-Dimethylformamide 68-12-2 20 0.000222803 1354.79
1-Octanol 111-87-5 5 0.00005570 1354.79
Ethoxylated Nonylphenol 68412-54-4 5 0.00005570 1354.79
Ethylene Glycol 111-76-2 40 0.000445607 1354.79
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.000111402 1354.79
WGA-15L WFT Gelling Agents Petroleum Distillates 64742-47-8 60 0.00471372 9554.18
WSI-671L WFT Inhibitor Ammonium Chloride 12125-02-9 20 0.00573653 34881.9
15% HCL WFT Acid Hydrochloric Acid 7647-01-0 15 0.0812732 658926
WXL-106L WFT Crosslink Control Potassium Hydroxide 1310-58-3 15 0.00008224 666.733
Potassium tetraborate 1332-77-0 40 0.000219296 666.733
Water Cabot Oil & Gas Carrier / Base Fluid Carrier / Base Fluid - Water 7732-18-5 100 87.4059 106,297,000.0
40/70 Premium WFT Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 11.2695 13,705,200.0
WIC-641L WFT Iron Control Citric acid 77-92-9 60 0.00379557 7693.19
WXL-100L WFT Crosslink Control Ethylene Glycol 107-21-1 40 0.00006679 203.059
WBK-133 WFT Breaker Ammonium Persulfate 7727-54-0 100 0.00009045 110
Other Chemicals Dioxane 123-91-1 0 0.00001114 0
2-PROPENAMIDE, POLYMER WITH 2-PROPENOIC
ACID AND SODIUM 2-PROPENOATE
62649-23-4 0 0.0266552 0
Sorbitan Monoolite 1338-43-8 0 0.000888508 0
Proprietary Ingredient Proprietary 0 0.000650113 0
Crystalline Silica in the form of Quartz 14808-60-7 0 0.00007856 0
Alcohols, C12-16, Ethoxylated 68551-12-2 0 0.00007856 0
Ethanolamine Borate 68425-67-2 0 0.00006679 0
Sodium Chloride 7647-14-5 0 0.00444254 0
Ethylene Oxide 75-21-8 0 0.00001114 0
Polyoxyethylene sorbitan monooleate 9005-65-6 0 0.000888508 0
Guar gum 9000-30-0 0 0.0039281 0
Deionized Water 7732-18-5 0 0.0128652 0
Amines, polyethylenepoly-, ethoxylated, phosphonomethylated 68966-36-9 0 0.0114731 0
Amides, Tall- Oil Fatty, N, N-Bis(Hydroxyethyl) 68155-20-4 0 0.00444254 0
Acrylamide 79-06-1 0 0.000888508 0
Alcohol Ethoxylate 68002-97-1 0 0.00007856 0
2-Butoxyethanol 111-76-2 0 0.00007856 0
Arlacel 83 8007-43-0 0 0.00007856 0
Acetaldehyde 75-07-0 0 0.00001114 0
Cinnamaldehyde 104-55-2 0 0.00005570 0
100 Mesh Sand WFT Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 0.623395 758130
Bio- WFT Bactericide Polyethylene Glycol 25322-68-3 50 0.0128652 31291.5
2,2-dibromo-3-nitriloproppionamide 10222-01-2 5 0.00128652 31291.5
WFR-61LA WFT Friction Reducer Ammonium chloride 12125-02-9 5 0.00444254 108054
Alcohols, C12-16, Ethoxylated 68551-12-2 5 0.00444254 108054
Petroleum Distillates 64742-47-8 20 0.0177702 108054

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-06-13 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 903,668.00 215 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 522,982.00 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 1,051,620.00 360 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 772,470.00 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 716,012.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 668,477.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 18,331.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 610.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2013 CABOT OIL & GAS CORP Drill Cuttings 1,035.46 Tons LANDFILL 101247
2013 CABOT OIL & GAS CORP Drilling Fluid Waste 1,821.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Drill Cuttings 871.83 Tons LANDFILL THR029
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 39,644.48 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 2,322.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2014 CABOT OIL & GAS CORP Produced Fluid 19,761.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 230.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2014 CABOT OIL & GAS CORP Fracing Fluid Waste 17,419.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Fracing Fluid Waste 330.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2014 CABOT OIL & GAS CORP Produced Fluid 7,610.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 CABOT OIL & GAS CORP Produced Fluid 10,577.55 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 5.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 4,200.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 CABOT OIL & GAS CORP Synthetic Liner Materials 3.08 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE004
2016 CABOT OIL & GAS CORP Produced Fluid 2,196.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 10,751.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 2.08 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Produced Fluid 5,530.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 800.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017 CABOT OIL & GAS CORP Produced Fluid 3,758.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 100.00 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Produced Fluid 210.00 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 5,452.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 2,558.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 2,790.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 4,149.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2144682 Primary Facility 2013-03-04 Routine/Partial Inspection No Violations Noted At the time of the inspection it was noted that the Site ID Sign was installed and the E&S Plan was on site. The E&S Inspection Log indicated that Dillon Otten (Tioga Environmental Consulting) conducted an inspection on 2/28/13. It was noted that silt sock has been red lined at the entrance. This silt sock does not appear to be installed efficiently. Operator, please review the placement of this silt sock and make any appropriate adjustments. The area across from the tank pad entrance does not appear to be temporarily stabilized. Please note that 25 PA Code §102.22(b)(1) states “Upon temporary cessation of an earth disturbance activity or any stage or phase of an activity where a cessation of earth disturbance activities will exceed 4 days, the site shall be immediately seeded, mulched, or otherwise protected from accelerated erosion and sedimentation pending future earth disturbance activities.”Overall the site construction, along with red lined additions, appears to be installed as designed.
2159395 Primary Facility 2013-04-15 Drilling/Alteration No Violations Noted see paper copy
2284014 Primary Facility 2014-04-15 Incident- Response to Accident or Event No Violations Noted
2437330 Primary Facility 2015-11-24 Routine/Complete Inspection No Violations Noted Inspection in conjunction with Hickory Ridge Pipeline NOT inspection. No issues observed.
2488755 Primary Facility 2016-05-26 Site Restoration No Violations Noted Inspection of the McLean D P1 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit.

Temporary E&S BMPs have been removed from the site. The restored pad size is consistent with the PCSM/Site Restoration Plan. Post construction storm water management devices were in place according to approved plans and appear to be functioning properly.

However, the cut slope on the north side of the pad has not achieved greater than 70% uniform perennial growth.

Based on the site inspection, I recommend this notice of termination be DENIED.

2651770 Primary Facility 2017-10-23 Site Restoration No Violations Noted This inspection was conducted to confirm Cabot's assessment that the project meets the minimum requirements for permanent stabilization. The Department's determination is that the site meets the requirements for permit termination.
2691117 Primary Facility 2018-02-05 Administrative/File Review No Violations Noted The Well Site Restoration Report required by 78.56 was accepted. No violations were noted. If you have any questions, please contact me.

For data sources see[9]

References