If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-21058 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.703264,"lon":-75.751592,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Lenox Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 147525 | |
Farm/Lease Name: RUTKOWSKI B 6 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-11-21 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.703264 | |
Longitude: -75.751592 |
Date | Event |
---|---|
2012-11-21 | New Permit Application |
2012-12-01 | Performed Spud Operation |
2013-01-02 | Drilling Completion |
2013-02-23 | Perforation |
2013-02-23 | Performed Stimulation |
2013-05-28 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-17 | 2013-02-17 | 7,433 | 8,253,966 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | CI-150 | FTSI | Corrosion Inhibitor | Isopropanol | 67-63-0 | 60.0 | 0.00057 | |
ICI-3240 | FTSI | Biocide | Dazomet | 533-74-4 | 24.0 | 0.00675 | ||
BXL-2 | Fractech | Borate Crosslinker | Sodium Metaborate | 10555-76-7 | 25.0 | 0.00007000 | ||
APB-1 | FTSI | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 95.0 | 0.00035 | ||
40/70 White | FTSI | Proppant | Crystalline Silica | NA | 100.0 | 10.6051 | ||
CS-500 SI | FTSI | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 10.0 | 0.00278 | ||
FRW-200 | FTSI | Friction Reducer | Petroleum Distillate Hydrotrea | 64742-47-8 | 26.0 | 0.0235 | ||
100 Mesh | FTSI | Proppant | Crystalline Silica | NA | 100.0 | 0.59317 | ||
HVG-1 | FTSI | Gel | Guar Gum | 9000-30-0 | 50.0 | 0.0044 | ||
Petroleum Distillate | 64742-47-8 | 55.0 | 0.00484 | |||||
Water | 7732-18-5 | 85.0 | 0.43875 | |||||
Surfactant | 68439-51-0 | 2.0 | 0.00018 | |||||
Boric Acid | 10043-35-3 | 15.0 | 0.00004000 | |||||
Organic Amineresin Salt | Proprietary | 30.0 | 0.00028 | |||||
Aromatic aldehyde | Proprietary | 10.0 | 0.00009000 | |||||
Potassium Hydroxide | 1310-58-3 | 12.0 | 0.00003000 | |||||
Quaternary ammonium compound | Proprietary | 10.0 | 0.00009000 | |||||
Clay | 14808-60-7 | 2.0 | 0.00018 | |||||
Sodium Hydroxide | 1310-73-2 | 4.0 | 0.00112 | |||||
Dimethylformamide | 68-12-2 | 10.0 | 0.00009000 | |||||
Water | Operator | Carrier | Water | 7732-18-5 | 100.0 | 88.12717 | ||
FE-100L | FTSI | Iron Control Product | Citric Acid | 77-92-9 | 55.0 | 0.00094 | ||
HCl, 10.1 - 15 | FTSI | Acidizing | Hydrochloric Acid | 7647-01-0 | 15.0 | 0.00774 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-02-23 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 1,203,562.00 | 58 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 4,269,866.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 2,362,764.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 1,752,257.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 1,323,273.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 1,180,729.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 965,580.00 | 357 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 678.10 Tons | LANDFILL | 101247 |
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 453.57 Tons | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 633.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 69.98 Bbl | LANDFILL | THR029 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 8,483.05 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 9,295.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 262.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Drill Cuttings | 168.81 Tons | LANDFILL | 101247 |
2013 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 475.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Drill Cuttings | 121.52 Tons | LANDFILL | THR029 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 1,739.81 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 950.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 5.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 410.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 361.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 178.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 223.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 187.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 481.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 60.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 193.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 271.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2125303 | Primary Facility | 2012-12-12 | Drilling/Alteration | No Violations Noted | In process of rigging up Patterson 263. Well has been spud. Secondary containment in place on pad under rig and around mud storage tanks. No violations observed at this time. |
2151292 | Primary Facility | 2013-03-11 | Drilling/Alteration | No Violations Noted | During well flaring on March 11, 2013, Cabot discovered the release of an unknown volume of brine to soil that apparently occurred during previous hydrofracturing operations. ECB received a final report from Cabot's consultants documenting their cleanup on June 10, 2013. Act 2 relief from liability for this incident was granted on June 25, 2013. |
2163169 | Primary Facility | 2013-03-11 | Routine/Complete Inspection | Violation(s) Noted | |
2514895 | Primary Facility | 2016-08-26 | Routine/Complete Inspection | No Violations Noted | |
2585043 | Primary Facility | 2017-04-20 | Routine/Complete Inspection | No Violations Noted | Todays inspection, 4/3/17 is a routine complete inspection. The entire site has good stability. Silt sock present could probably be removed. There is only one well, the 6H drilled and in production. No violations noted. |
2665776 | Primary Facility | 2017-11-30 | Routine/Complete Inspection | No Violations Noted | Arrived on location at: 11:30. Weather: Clear, mild ~ 42 degs. The 6H well was producing and is the only well on pad. This wells (13x9) and (9x5) annuli were open and venting, plumbed to a common poly vent tank. A Gas check performed at the common poly vent tank showed 0 % LEL, 0 % CH4. -This wells Prod. casing, Static and Differential pressures were being monitored by a wireless sending unit to onsite Total Flow Control Unit "TFCU". - TFCU readings were taken off control panel at ~ 12:00. (CP= prod. casing press., SP= static press., DP= differential press.)
- 6H: CP= 558.9 psi, SP= 563.2 psi., DP= 113.4 psi. - Overall, well and pad were found in good condition. No obvious concerns noted at time of inspection. No violations noted. Left location at 12:30. |
2672769 | Primary Facility | 2017-11-29 | Complaint Inspection | No Violations Noted | Today's inspection is being conducted as part of an investigation into a nearby water supply complaint. Only one well, the 6H has been drilled and is in production. No violations were identified during this inspection. Good pad stabilization. Good perennial vegetation present. |
2818984 | Primary Facility | 2018-12-18 | Routine/Complete Inspection | No Violations Noted | Today's inspection has been conducted as a routine inspection. Entire site has been reworked. No E&S issues were evident. No violations noted. |
2843127 | Primary Facility | 2019-02-21 | Routine/Complete Inspection | No Violations Noted | Today's inspection was conducted as a routine inspection. As the photo's show, the site is snow covered. Overall the site appears to have good stabilization. No E&S issues identified. No violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2163169 | 667065 | 03/11/2013 | 2013-03-11 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | |
2163169 | 667066 | 03/11/2013 | 2013-03-11 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | |
2163169 | 667067 | 03/11/2013 | 2013-03-11 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety |
For data sources see[9]