If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-21048 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.719717,"lon":-75.988006,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Auburn Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 145507 | |
Farm/Lease Name: BRAY B 3 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-11-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.719717 | |
Longitude: -75.988006 |
Date | Event |
---|---|
2012-11-08 | New Permit Application |
2012-11-14 | Performed Spud Operation |
2013-04-10 | Drilling Completion |
2013-06-12 | Perforation |
2013-07-02 | Performed Stimulation |
2014-03-13 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-07-02 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 717,202.35 | 68 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 1,621,005.18 | 355 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 438,651.14 | 218 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 604,126.53 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 461,294.94 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 361,053.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 287,710.00 | 360 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 327.95 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 11,377.82 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Drill Cuttings | 864.39 Tons | LANDFILL | 101247 |
2013 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,996.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Drill Cuttings | 133.44 Tons | LANDFILL | THR029 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 189.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1,712.29 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 628.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 2,694.20 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 7.30 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 320.32 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 135.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 0.11 Tons | LANDFILL | 301358 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 304.81 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 87.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 255.92 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 167.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 129.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 253.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2142897 | Primary Facility | 2012-12-05 | Drilling/Alteration | No Violations Noted | Patterson 253 on site. Drilling all topholes first, then drilling laterals. Cellar installed. No violations observed at this time. |
2143016 | Primary Facility | 2012-11-13 | Routine/Complete Inspection | No Violations Noted | |
2144375 | Primary Facility | 2013-02-28 | Drilling/Alteration | No Violations Noted | Patterson 253 currently on site drilling ahead on Bray 10H. Bray 3H has been spud. Site ID sign in place. Permit posted on site. Secondary containment in place. |
2148093 | Primary Facility | 2013-03-13 | Drilling/Alteration | No Violations Noted | Patterson Rig 253 on site. Have just skidded over to 3H. Conductor set @ 116'. Will drill down to KOP. Secondary containment in place. Crews on site patching liner. Driller 10 wells on location. Have drilled topholes on all wells except 3H and 11H. No violations observed at this time. |
2390284 | Primary Facility | 2015-07-16 | Routine/Partial Inspection | No Violations Noted | |
2409815 | Primary Facility | 2015-09-24 | Routine/Partial Inspection | No Violations Noted | |
2475970 | Primary Facility | 2016-04-18 | Routine/Partial Inspection | No Violations Noted | |
2724700 | Primary Facility | 2018-04-30 | Routine/Complete Inspection | No Violations Noted | I performed a RTNC inspection of the Bray well site. The wells associated with this site are as follows: 115-20765, 115-21041, 115-21042, 115-21043, 115-21044, 115-21045, 115-21046, 115-21047, 115-21048, 115-21049. The wells were properly labeled.
The cut and fill slopes were small, well vegetated and surrounded by active agriculture. They were stable. The pad surface and access road were solid and stable. There were no erosional issues noted. There were no violations noted. |
For data sources see[8]