Well ID: 37-115-21048
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Auburn Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 145507
Farm/Lease Name: BRAY B 3
License Status:
Spud Date:
Permit Date: 2012-11-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.719717
Longitude: -75.988006

For data sources see[1][2][3]

Well History

Date Event
2012-11-08 New Permit Application
2012-11-14 Performed Spud Operation
2013-04-10 Drilling Completion
2013-06-12 Perforation
2013-07-02 Performed Stimulation
2014-03-13 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-07-02 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 717,202.35 68 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 1,621,005.18 355 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 438,651.14 218 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 604,126.53 365 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 461,294.94 364 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 361,053.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 287,710.00 360 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 327.95 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 1.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 11,377.82 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Drill Cuttings 864.39 Tons LANDFILL 101247
2013 CABOT OIL & GAS CORP Drilling Fluid Waste 1,996.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Drill Cuttings 133.44 Tons LANDFILL THR029
2013 CABOT OIL & GAS CORP Produced Fluid 189.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 1,712.29 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 628.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2014 CABOT OIL & GAS CORP Produced Fluid 2,694.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 7.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 320.32 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 135.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Waste Water Treatment Sludge 0.11 Tons LANDFILL 301358
2016 CABOT OIL & GAS CORP Produced Fluid 304.81 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 87.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 255.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 167.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 129.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 253.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2142897 Primary Facility 2012-12-05 Drilling/Alteration No Violations Noted Patterson 253 on site. Drilling all topholes first, then drilling laterals. Cellar installed. No violations observed at this time.
2143016 Primary Facility 2012-11-13 Routine/Complete Inspection No Violations Noted
2144375 Primary Facility 2013-02-28 Drilling/Alteration No Violations Noted Patterson 253 currently on site drilling ahead on Bray 10H. Bray 3H has been spud. Site ID sign in place. Permit posted on site. Secondary containment in place.
2148093 Primary Facility 2013-03-13 Drilling/Alteration No Violations Noted Patterson Rig 253 on site. Have just skidded over to 3H. Conductor set @ 116'. Will drill down to KOP. Secondary containment in place. Crews on site patching liner. Driller 10 wells on location. Have drilled topholes on all wells except 3H and 11H. No violations observed at this time.
2390284 Primary Facility 2015-07-16 Routine/Partial Inspection No Violations Noted
2409815 Primary Facility 2015-09-24 Routine/Partial Inspection No Violations Noted
2475970 Primary Facility 2016-04-18 Routine/Partial Inspection No Violations Noted
2724700 Primary Facility 2018-04-30 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection of the Bray well site. The wells associated with this site are as follows: 115-20765, 115-21041, 115-21042, 115-21043, 115-21044, 115-21045, 115-21046, 115-21047, 115-21048, 115-21049. The wells were properly labeled.

The cut and fill slopes were small, well vegetated and surrounded by active agriculture. They were stable. The pad surface and access road were solid and stable. There were no erosional issues noted.

There were no violations noted.