If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20901 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.959086,"lon":-75.912325,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Silver Lake Township | |
Operator Name: SWN PROD CO LLC | |
Well Pad ID: 148811 | |
Farm/Lease Name: MACGEORGE NORTHEAST 1 9H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-04-25 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.959086 | |
Longitude: -75.912325 |
Date | Event |
---|---|
2012-04-25 | New Permit Application |
2012-05-30 | Performed Spud Operation |
2012-08-22 | Drilling Completion |
2012-10-24 | Perforation |
2012-10-24 | Performed Stimulation |
2013-04-17 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-10-23 | 2012-10-23 | 6,070 | 3,068,011 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | LP-65 | Halliburton Energy Services | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10.00 | 0.00390000 | |
Water | Carrier/Base Fluid | Water | 100.00 | 85.90 | ||||
GBW-30 Breaker | Halliburton Energy Services | Breaker | ||||||
Carbohydrates | 95.00 | 0.00078000 | ||||||
Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00012000 | |||||
WG-36 Gelling Agent | Halliburton Energy Services | Gel | Guar gum | 9000-30-0 | 100.00 | 0.00164000 | ||
Hydrochloric Acid | Halliburton Energy Services | Acid | Hydrochloric acid | 7647-01-0 | 30.00 | 0.12 | ||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
Sand- Silica Sand | Halliburton Energy Services | Proppant | Quartz | 14808-60-7 | 100.00 | 13.90 | ||
SP Breaker | Halliburton Energy Services | Breaker | Sodium persulfate | 7775-27-1 | 100.00 | 0.00082000 | ||
Cla-Web | Halliburton Energy Services | Clay Control | ||||||
Proprietary | 60.00 | 0.02 | ||||||
BE-9M | Halliburton Energy Services | Biocide | Methanol | 67-56-1 | 30.00 | 0.01 | ||
Tri-n-butyl tetradecyl phosphonium chloride | 81741-28-8 | 10.00 | 0.00466000 | |||||
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-10-24 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XPR RESOURCES LLC | 491,782.28 | 190 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 514,355.65 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | SWN PROD CO LLC | 43,778.24 | 44 | 0.00 | 0 | 0.00 | 0 |
2016 | SWN PROD CO LLC | 121,864.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | SWN PROD CO LLC | 35,474.00 | 241 | 0.00 | 0 | 0.00 | 0 |
2018 | SWN PROD CO LLC | 33,733.00 | 315 | 0.00 | 0 | 0.00 | 0 |
2019 | SWN PROD CO LLC | 39,616.00 | 340 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XPR RESOURCES LLC | Drill Cuttings | 831.17 Tons | LANDFILL | 8-0728-0004/013 |
2012 | XPR RESOURCES LLC | Drilling Fluid Waste | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC006 |
2013 | XPR RESOURCES LLC | Produced Fluid | 529.31 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2013 | XPR RESOURCES LLC | Produced Fluid | 588.74 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2013 | XPR RESOURCES LLC | Drilling Fluid Waste | 20.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2013 | XPR RESOURCES LLC | Produced Fluid | 607.26 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2013 | XPR RESOURCES LLC | Produced Fluid | 1,071.31 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | XPR RESOURCES LLC | Produced Fluid | 399.79 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | XPR RESOURCES LLC | Produced Fluid | 182.81 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC010 |
2014 | XPR RESOURCES LLC | Produced Fluid | 946.65 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2014 | XPR RESOURCES LLC | Produced Fluid | 378.35 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | XPR RESOURCES LLC | Produced Fluid | 421.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SWN PROD CO LLC | Fracing Fluid Waste | 6.67 Bbl | LANDFILL | THR029 |
2015 | SWN PROD CO LLC | Produced Fluid | 1,559.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SWN PROD CO LLC | Other Oil & Gas Wastes | 6.66 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SWN PROD CO LLC | Produced Fluid | 40.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | SWN PROD CO LLC | Produced Fluid | 350.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | SWN PROD CO LLC | Other Oil & Gas Wastes | 87.67 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2017 | SWN PROD CO LLC | Produced Fluid | 151.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018 | SWN PROD CO LLC | Produced Fluid | 15.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018 | SWN PROD CO LLC | Produced Fluid | 36.67 Bbl | REUSE (AT WELL PAD) | |
2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 8.33 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2019 | SWN PROD CO LLC | Produced Fluid | 33.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC035 |
2019 | SWN PROD CO LLC | Produced Fluid | 69.33 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2019 | SWN PROD CO LLC | Other Oil & Gas Wastes | 7.25 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2019 | SWN PROD CO LLC | Produced Fluid | 36.67 Bbl | SURFACE IMPOUNDMENT | 826342 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2069946 | Primary Facility | 2012-05-03 | Routine/Complete Inspection | No Violations Noted | Pre-operations inspection |
2093181 | Primary Facility | 2012-08-20 | Drilling/Alteration | No Violations Noted | Patterson 332. Drilling ahead @ 10 182'. Td - proposed 10,700'. Walked site - containment in good condition. No spills or tears observed. Checked cellar - no bubbling observed. Drillers log on site and up to date. Will be skidding to 5H well next. No violations observed at this time. |
2110494 | Primary Facility | 2012-10-24 | Drilling/Alteration | No Violations Noted | Arrived on location 14:25. wpx fracing well did full inspection tour . All e and s measures in place .Frac crew finishing stage 6 on 9-h. backside prssure 56# during treatment .Positively.Commented on the extra measures taken to contain flow back being used as part of frac slurry. |
2286502 | Primary Facility | 2014-07-10 | Routine/Partial Inspection | No Violations Noted | |
2358384 | Primary Facility | 2015-04-06 | Routine/Complete Inspection | No Violations Noted | |
2415332 | Primary Facility | 2015-10-13 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 10:15 a.m., the cellar was full of gravel, the vent pipe was open and set up with a Taylor plug with 0psi on the pressure gauge, there was no gas detected at the perimeter of the cellar, there was about 1150psi on the production casing and 1150psi on the production line. I took a walk around the location, everything looked OK. |
2436789 | Primary Facility | 2015-12-02 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a routine complete inspection of the Mac George well pad (ESX11-115-0188). The wells associated with this site are as follows: |
2493161 | Primary Facility | 2016-06-15 | Routine/Complete Inspection | No Violations Noted | The Department, represented by Frank Hoehle, was on site to conduct a Routine Complete Inspection of the MacGeorge Well Pad (ESX11-115-0188). This pad has four wells associated with it:
115-20899 115-20900 115-20901 115-20902 There were no issues with erosion and sedimentation at this time, and the site was stable. There were no violations. If there are any questions please feel free to call me at (570) 346-5539. |
2513761 | Primary Facility | 2016-08-23 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 12:35p.m., the cellar was full of gravel and no gas was detected. The vent pipe was open and set up with a Taylor plug to check for pressure, there was 246psi on the production casing and 218psi on the production line. I took a walk around the location and everything looked OK.
I left the site at 13:10p.m. |
2605601 | Primary Facility | 2017-06-19 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 11:10a.m.
The cellar was full of gravel and there was no gas detected at the perimeter of the cellar. The (9x5) annulus vent pipe was open and set up with a Taylor plug to check for pressure with a Crystal pressure gauge and a 5000psi pressure gauge with 0psi on it. There was 381psi on the production casing and about 151psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 11:55a.m. |
2667706 | Primary Facility | 2017-11-22 | Routine/Complete Inspection | No Violations Noted | I inspected the MacGeorge well pad on November 22, 2017. The access road was firm and stable as was the pad surface. The wells inspected (115-20899, 115-20900, 115-20901) were properly labeled. The cut and fill slopes were solid and stable. All vegetation was healthy and sufficient for the application. There were no apparent erosional issues.
There were no violations noted. |
2709614 | Primary Facility | 2018-03-22 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was full of gravel and there was no gas detected at the perimeter of the cellar. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2811546 | Primary Facility | 2018-12-06 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was shut in at the GPU. The cellar was full of gravel and was unable to check for gas at the perimeter of the cellar because the gravel was frozen. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[9]