37-115-20719

Well Details

Well ID: 37-115-20719
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Clifford Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 145366
Farm/Lease Name: BERNSTEIN PRICE 5H
License Status:
Spud Date:
Permit Date: 2011-11-04
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.718731
Longitude: -75.635353

For data sources see[1][2][3]

Well History

Date Event
2011-11-04 New Permit Application
2011-11-17 Performed Spud Operation
2012-01-30 Drilling Completion
2013-03-27 Perforation
2013-03-27 Performed Stimulation
2013-12-05 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-03-27 2013-03-27 7,530 4,233,054

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Southwester n Energy Water Water 7732-18-5 100.0 90.1722319473
HCl Acid (12.5-18.0) Nabors Completion and Production Services Bulk Acid Hydrogen Chloride 7647-01-0 18.0 0.159192
Water 7732-18-5 87.5 0.773851
Services None None
KR-153SL Nabors Completion and Production Services Biocides Water 7732-18-5 80.0 0.009505
Polyethlyene-Glycol 25322-68-3 50.0 0.005941
2,2-dibromo-3-nitrilopropionamide 10222-01-2 20.0 0.002376
WFR-3B Nabors Completion and Production Services Friction Reducer Ethoxylated oleylamine 26635-93-8 5.0 0.004869
Hydrotreated light distillates, non-aromatic, BTEX free 64742-47-8 50.0 0.048691
Propylene glycol 57-55-6 15.0 0.014607
Polyacrylamide 57-55-6 40.0 0.038953
Ethoxylated alcohols 68551-12-2 15.0 0.014607
Water 7732-18-5 40.0 0.038953
Microparticle Proprietary 1.0 0.000974
PA Specific 30/50 mesh Sand Nabors Completion and Production Services Sand - Bulk - Pennsylvania Titanium Oxide 13463-67-7 0.1 0.007567
Aluminum Oxide 1344-28-1 1.1 0.083233
Iron Oxide 1309-37-1 0.1 0.007567
Crystalline Silica, quartz 14808-60-7 99.9 7.559029
(AI-2) Completion and Production Services None None
Acid Inhibitor 2 (AI-2) Nabors Completion and Production Services Acid Corrosion Inhibitors Glycol Ethers 111-46-6 40.0 0.000676
2-Butoxyethanol 111-76-2 13.0 0.00022
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10.0 0.000169
Water 7732-18-5 48.0 0.000811
Propargyl Alcohol 107-19-7 40.0 0.000676
Dioxane 123-91-1 1.0 0.00001700
Ethoxylated Nonylphenol 68412-54-4 13.0 0.00022
Super TSC-LT Nabors Completion and Production Services Paraffin & Scale Additives Proprietary Proprietary 50.0 0.010779
Water 7732-18-5 60.0 0.012935
Proprietary Proprietary 15.0 0.003234
PA Specific 30/50 mesh Sand Nabors Completion and Production Sand - Bulk - Pennsylvania
Acid Inhibitor 2 Nabors Acid Corrosion Inhibitors Isopropyl Alcohol 67-63-0 40.0 0.000676
PA Specific 100 mesh Sand Nabors Completion and Production Services Sand - Bulk - Pennsylvania Crystalline Silica, quartz 14808-60-7 99.9 1.243014
Titanium Oxide 13463-67-7 0.1 0.001244
Iron Oxide 1309-37-1 0.1 0.001244
Aluminum Oxide 1344-28-1 1.1 0.013687

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-03-27 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 SOUTHWESTERN ENERGY PROD CO 0.00 0 0.00 0 0.00 0
2012 SOUTHWESTERN ENERGY PROD CO 0.00 0 0.00 0 0.00 0
2013 SOUTHWESTERN ENERGY PROD CO 684,942.00 269 0.00 0 0.00 0
2014 SOUTHWESTERN ENERGY PROD CO 599,928.00 329 0.00 0 0.00 0
2015 SWN PROD CO LLC 500,034.00 347 0.00 0 0.00 0
2016 SWN PROD CO LLC 452,497.00 366 0.00 0 0.00 0
2017 SWN PROD CO LLC 387,295.00 365 0.00 0 0.00 0
2018 SWN PROD CO LLC 346,328.00 365 0.00 0 0.00 0
2019 SWN PROD CO LLC 317,253.00 363 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 SOUTHWESTERN ENERGY PROD CO Drill Cuttings 180.00 Tons LANDFILL NY STATE #32S11
2012 SOUTHWESTERN ENERGY PROD CO Drill Cuttings 1,686.00 Tons LANDFILL THR029
2013 SOUTHWESTERN ENERGY PROD CO Produced Fluid 19,302.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 SOUTHWESTERN ENERGY PROD CO Fracturing Fluid Waste 44.52 Tons LANDFILL 101247
2013 SOUTHWESTERN ENERGY PROD CO Fracing Fluid Waste 110.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 SOUTHWESTERN ENERGY PROD CO Produced Fluid 3,855.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 SWN PROD CO LLC Produced Fluid 3,948.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Other Oil & Gas Wastes 50.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Produced Fluid 3.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 SWN PROD CO LLC Produced Fluid 742.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SWN PROD CO LLC Other Oil & Gas Wastes 173.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Produced Fluid 566.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SWN PROD CO LLC Produced Fluid 4,020.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Other Oil & Gas Wastes 27.50 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Produced Fluid 1,071.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Produced Fluid 213.00 Bbl SURFACE IMPOUNDMENT 826342
2018 SWN PROD CO LLC Produced Fluid 247.50 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Other Oil & Gas Wastes 222.55 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 596.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 209.25 Bbl SURFACE IMPOUNDMENT 826342
2019 SWN PROD CO LLC Produced Fluid 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC035

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2034648 Primary Facility 2012-01-10 Drilling/Alteration No Violations Noted Falcon Rig 23. Hole depth at time of inspection = 1608'. Running 9 5/8" casing downhole at time of inspection. Expect to be cementing 9 5/8" casing later today. Casing to be set at 1599.81'.
2037785 Primary Facility 2012-01-26 Drilling/Alteration No Violations Noted Desoto Rig 9. Currently at depth 8531'. Drilling on SOBM in lateral. Proposed TD = 12029'. Drillers log on site and up to date. BOP charts posted. Secondary containment in place and good condition. Last well on location. When complete will be moving to KK pad. Cement reports indicated good returns on both surface and intermediate casing strings. No water or gas shows reported in vertical section.
2110048 Primary Facility 2012-10-04 Drilling/Alteration No Violations Noted
2284483 Primary Facility 2014-03-06 Routine/Complete Inspection No Violations Noted The Department conducted an inspection on 3/6/14 of the SWN PU DD Neubert – Price Pad (also known as the Bernstein – Price Pad). There are 3 wells permitted for this pad, the Bernstein – Price 1H (115-21303), 2H (115-21271), and 5H (115-20719). The 1H and 2H have been spud. The 1H has been drilled. Stimulation has not occurred yet. The pad construction is complete. Temporary stabilization appears to be adequate. Fill material has been dumped to the right of the access road near the pad entrance. This site should be monitored and further stabilized if necessary. No violations noted.
2288542 Primary Facility 2014-07-21 Routine/Complete Inspection No Violations Noted Flowback procedures were in progress as we arrived at the site. P.J. Winowicz and Geno of Southwestern Energy were at the site during the inspection. The 5H well is in the production phase of operations. According to Mr. Winowicz the 1H and 2H wells are being flowed back. Flowback of the wells commenced on 7/17/14. As flowback fluid flows to the surface of the wells, it is routed through flowback iron, to (2) gas buster tanks. The fluid is then routed via a pump through a trailer containing filter tanks. There are (50) micron filter socks inside the filter tanks used to filter out the solid material in the flowback fluid. Upon filtration of the flowback fluid, the fluid is sent to frac tanks staged behind the trailer. The fluid is transported to a SWN permitted centralized waste impoundment for storage. There are (2) in line heaters, (2) sand traps and (2) separation units used in the flowback process. The entire operation takes place on secondary containment.
2397526 Primary Facility 2015-08-05 Routine/Complete Inspection No Violations Noted On 8/5/15, an inspection was conducted in response to a reported small spill that was called in by SWN on their PU DD Bernstein Price Pad. The spill was identified while crews were in the process of moving the SWN Rig 44 off the pad. As part of the process of breaking down and moving equipment off the pad, small holes were identified in the drilling rig liner that had allowed the soapy water related to power washing the equipment before removal from the containment. Upon arrival at the location, I was directed to the location of the spill. A trench was dug along the edge of the containment. It appears as if this excavation, which was probably initiated in response to the initial spill detection, had caused additional damage to the containment. As evidenced in the photographs, contaminated water was accumulating along this area and was continuing to be released to the pad surface. I contacted Mike Deming by phone and described what I had observed and suggested that they employ a vac truck to suck up the water and cease the release.
2397541 Primary Facility 2015-08-06 Routine/Complete Inspection No Violations Noted As the photographs show, it appears as if the release had increased as contaminated water was still present in the containment in this area, and the amount of “water” present in the excavation had increased. Again, the Department suggested that a vac truck be utilized to help reduce/eliminate the release. Since it appeared as if the release was now potentially reaching a quantity at or above a barrel, Mr. Klemish was told that the Department would now require that at a minimum, biased sampling of the impacted area would need to be conducted. The Department suggested that at this point, SWN test for surfactants, the diesel short list analytes, and metals similar to the Departments 946 suite. Jon Caden, SWN company man on-site thought that by tomorrow, they would be able to pull back some of the containment and would be in a better position to assess the extent of the impact.
2400300 Primary Facility 2015-08-07 Follow-up Inspection No Violations Noted The containment was pulled back a further distance from where it was located during the 8/6/15 inspection in order to determine the presence of staining and potential impact to the pad surface beneath it associated with a spill reported by SWN to the Department on 8/5/15. The liner was pulled back at 8:15 AM and a dump truck arrived at 8:30 AM which was around the time the remediation process of the impacted area of the pad surface associated with the spill reported to the Department commenced on 8/7/15. The pad surface is wet in this particular area. Leidos performed electrical conductivity screening upon completion of the excavation. The highest soil conductivity reading Leidos recorded was (813) microSiemens/cm³ at the bottom of the excavation, EC sample # 4 at N- 41.71926°; W-75.63492°. A total of (20) tons of impacted material, which is equivalent to (1) truckload, has been excavated and sent off site to a landfill for disposal.
2652200 Primary Facility 2017-10-24 Routine/Complete Inspection No Violations Noted Arrived on location 9am. 4 wells, 4 treaters and 4 separators on location. Wells 1, 2 and 5 had cellars filled with gravel. 3H had cellar filled with water but no visible bubbling. Prod Casing pressure on 5H=354.90psi. No violations noted at time of inspection.
2682563 Primary Facility 2018-01-08 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Overall site conditions appear to be stable. No spills detected. No violations noted.
2755077 Primary Facility 2018-07-24 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was full of gravel and there was no gas detected at the perimeter of the cellar. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2851832 Primary Facility 2019-03-08 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Overall the site appears to have good stabilization. No E&S issues identified. No violations noted.
2855988 Primary Facility 2019-03-20 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was full of gravel and there was no gas detected at the perimeter of the cellar with a MSA Altair 5X multi gas detector that was calibrated on 3/4/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[9]