If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20608 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.677194,"lon":-75.835547,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Lathrop Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 148676 | |
Farm/Lease Name: KERR UNIT B 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-07-28 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.677194 | |
Longitude: -75.835547 |
Date | Event |
---|---|
2011-07-28 | New Permit Application |
2011-09-20 | Performed Spud Operation |
2011-10-27 | Drilling Completion |
2013-01-29 | Perforation |
2013-01-29 | Performed Stimulation |
2013-05-24 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-02-22 | 2012-02-22 | 7,455 | 937,482 | |
2 | 2013-01-26 | 2013-01-26 | 7,455 | 3,917,172 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FRW-18 | BJ Services Company | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 0.07 | ||
Scale Inhibitor - Gyptron T-390 | Champion Technologies | Scale Inhibitor | Methanol | 67-56-1 | 0.00800000 | |||
Fresh Water | Base Fluid | |||||||
Fresh Water | 100.00 | 77.98 | ||||||
Biocide - Bactron K 139 | Champion Technologies | Biocide | ||||||
Glutaraldehyde | 111-30-8 | 0.03 | ||||||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | |||||||
benzyl-C12-16 alkyldimethyl,chlorides | ||||||||
Ethanol | 64-17-5 | |||||||
Hydrochloric Acid 15 | BJ Services Company | Acid | Hydrochloric acid | 7647-01-0 | 0.64 | |||
Water | 7732-18-5 | 75.00 | ||||||
Sand (Proppant) | BJ Services Company | Propping Agent | Quartz | 14808-60-7 | 99.90 | 21.27 | ||
2 | Gyptron T-390 Champion Technologies | Scale Inhibitor | ||||||
Methanol 67-56-1 10.00 |
0.01 | |||||||
Biocide - Bactron K 139 | Champion Technologies | Biocide | Ethanol | 64-17-5 | 5.00 | |||
Glutaraldehyde | 111-30-8 | 5.00 | 0.04 | |||||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 10.00 | ||||||
FRW-66 | Halliburton Energy Services | Friction Reducer | Hydrotreated Light Distillate 64742-47-8 |
0.08 | ||||
Gyptron T-390 Champion Technologies | Halliburton Energy Services | Scale Inhibitor | ||||||
Water | Base Fluid | Fresh Water | 100.00 | 75.00 | ||||
Hydrochloric Acid 28 | Halliburton Energy Services | Acid | Water 7732-18-5 85 |
|||||
Hydrochloric acid | 7647-01-0 | 0.50 | ||||||
Sand (Proppant) | Halliburton Energy Services | Propping Agent | Quartz | 14808-60-7 | 99.90 | 25.00 | ||
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-01-29 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHIEF OIL & GAS LLC | 116,385.00 | 33 | 0.00 | 0 | 0.00 | 0 |
2013 | CHIEF OIL & GAS LLC | 2,400,835.00 | 313 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 2,034,866.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 1,283,578.89 | 362 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 1,031,177.48 | 316 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 799,340.52 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 633,456.80 | 282 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 558,963.96 | 307 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,651.01 Tons | LANDFILL | 301626 |
2012 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 5,118.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHIEF OIL & GAS LLC | Produced Fluid | 225.70 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 937.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHIEF OIL & GAS LLC | Produced Fluid | 2,665.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHIEF OIL & GAS LLC | Fracturing Fluid Waste | 5.33 Tons | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC006 |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 97.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 200.91 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Fracturing Fluid Waste | 40.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 389.51 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 71.02 Bbl | REUSE (AT WELL PAD) | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 15.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 73.33 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 216.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 150.47 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Synthetic Liner Materials | 4.17 Tons | LANDFILL | 301358 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2011524 | Primary Facility | 2011-10-13 | Drilling/Alteration | No Violations Noted | DEP on site at 14:30. Patterson Rig 251. Checked drillers log - needs to be updated with gas/water show data. Walked site - secondary containment in place and in good condition. Cement reports show good returns on both 13 3/8" and 9 5/8". |
2018697 | Primary Facility | 2011-11-07 | Routine/Complete Inspection | Pending | DEP on site 14:00. Crews on site cleaning up pad. Patterson 251 moving to Squire Unit B. Walked site. Crews picking up mats and moving rest of equipment off location. Inspected cellar - can hear gas venting through one of the vents. Cupped hand over vent - pressure buildup exists. Can not determine which annulus it is. REquest Operator to identify and report to DEP with findings. |
2020622 | Primary Facility | 2011-11-09 | Routine/Complete Inspection | No Violations Noted | |
2031194 | Primary Facility | 2012-01-03 | Follow-up Inspection | Pending | DEP -Steve Watson, Kevin Costello and Andrea Schmid on site 11 am. Meth with Rich Adams and other Chief personnel to investigate backside pressures on well. While on site, Operator installed 100 lb gauge on 9 x 13" annulus, and 100 lb gauge on 9 x 5" annulus. No noticeable increase in pressure on 9 x 13" while on site. Operator going to monitor 9 x 13" for 24 hours to see if any buildup. After 21 mins...SIP on 9 x 5" was 28 psi. Operator will continue venting 9 x 5" to poly tank. Once 24 hr shut in test complete, Operator will report data to DEP. Inspection results Pending at this time. |
2310439 | Primary Facility | 2014-10-02 | Drilling/Alteration | No Violations Noted | |
2445793 | Primary Facility | 2016-01-25 | Routine/Complete Inspection | No Violations Noted | Routine inspection of the Kerr Unit B Well Pad prior to the start of fracking activities of the 2H and 3H wells. I was accompanied by Jon Sassi, DEP Environmental Protection Specialist. During the inspection we met Water Foreman, Ralph Larsen, and Company Man, Bret Fowler, both of Chief. The Department received stimulation notices for both wells on January 22, 2016. At the time of the inspection, fracking continues on the Kerr Unit 4H well.
The site is stable with no observable E & S issues at the time of the inspection. Post Construction Stormwater Management BMPs are installed and appear to functioning properly. Containment was in place around the water and brine tanks, etc, and crews were at work constructing the remaining containment and building the heater houses for the water and brine tanks. |
2473919 | Primary Facility | 2016-03-24 | Routine/Complete Inspection | No Violations Noted | Routine inspection of the Kerr Unit B Well Pad in conjunction with the Notice of Termination inspection of the Kerr B Lateral pipeline. Crews were removing containment and equipment from the recent fracking of the 2H and 3H wells. Much of the surface of the pad was still covered but no issues were observed. The Department will visit the pad at a later date for a more detailed post-frack inspection of the pad. |
2715941 | Primary Facility | 2018-04-06 | Site Restoration | No Violations Noted | This inspection was conducted to confirm Chief's assessment that the project meets the minimum requirements for permit termination. The one infiltration berm for this pad has been installed. The Department’s determination is that the site meets the requirements for permit termination. I recommend the NOT be approved. |
For data sources see[9]