If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20567 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.653575,"lon":-75.867589,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 150750 | |
Farm/Lease Name: JOHN LOPATOFSKY 1V | |
License Status: | |
Spud Date: | |
Permit Date: 2011-05-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.653575 | |
Longitude: -75.867589 |
Date | Event |
---|---|
2011-05-11 | New Permit Application |
2011-07-09 | Performed Spud Operation |
2011-08-19 | Drilling Completion |
2011-10-09 | Perforation |
2011-10-09 | Performed Stimulation |
2012-02-06 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-10-10 | 2011-10-10 | 8,786 | 682,836 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Proppant | 100.00 | 12.42 | ||||
FRW-200 | Frac Tech Services (FTS) | Friction Reducer | No hazardous ingredients | 100.00 | 0.10 | |||
Water | Carrier/Base Fluid | 100.00 | 87.41 | |||||
CS-500 SI | Frac Tech Services (FTS) | Scale Inhibitor | No hazardous ingredients | 100.00 | 0.04 | |||
ICI-3240 | Frac Tech Services (FTS) | Antibacterial Agent | Sodium hydroxide | 1310-73-2 | 4.00 | 0.00150000 | ||
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.00898000 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-10-09 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 90,105.00 | 140 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 91,049.00 | 341 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 6,187.25 | 98 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 11,390.95 | 352 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 11,322.58 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 28,477.94 | 279 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 8,606.00 | 177 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 8,092.00 | 168 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,508.95 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.83 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 423.24 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 59.85 Tons | LANDFILL | 101615 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1,370.25 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 3.31 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 3,520.54 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 11.11 Tons | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 269.64 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 2.70 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 2.13 Tons | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 469.93 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 149.60 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 116.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 1,779.43 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 583.52 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 17.49 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 43.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 2.06 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 0.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1989205 | Primary Facility | 2011-07-20 | Drilling/Alteration | No Violations Noted | Pioneer 63. Call from operator there is a presence of bubbling near wall of tin-horn. Only conductor set. Had 35u of gas at 92'. Observed intermittent bubbles coming up to surface on western wall of tin-horn. Will revisit site tomorrow with gas meter to determine if gas. Conductor and cellar floor cemented. |
1989208 | Primary Facility | 2011-07-21 | Follow-up Inspection | No Violations Noted | Pioneer 63. Follow up on presence of bubbling in cellar on west wall of tin-horn. At time of inspection, bubbling has ceased. Plan to start drilling later today. Operator will monitor cellar conditions and report to DEP any changes in conditions. |
2000263 | Primary Facility | 2011-08-03 | Drilling/Alteration | No Violations Noted | Pioneer 63. Drilling depth 7520'. Cored from 7295 to 7520'. Proposed depth 8665'. Inspected cellar - no bubbling observed. TOH - first core. Walked around location - secondary containment in place and in good condition. Mentioned to Company Man ti inspect drum storage container on backside of pad. Appears to be leaking. It's on containment...DEP will follow up. Conductor set at 90'. 13 3/8" set at 465' (30bbls return), 9 5/8" set at 1505' (50 bbl returns). |
2000359 | Primary Facility | 2011-08-17 | Drilling/Alteration | No Violations Noted | Pioneer 63. BJ on site to flush out stack. Hooked up incorrectly to A-section and collapsed sectionand collapsed 9 5/8" casing. Operator removing well head and will assess damage. If possible, will cut off section of bad casing. If necessary, will washover 9 5/8" casing and remove top joint of pipe. |
2006590 | Primary Facility | 2011-07-21 | Routine/Complete Inspection | No Violations Noted | |
2006925 | Primary Facility | 2011-08-24 | Routine/Complete Inspection | No Violations Noted | |
2006990 | Primary Facility | 2011-08-01 | Routine/Complete Inspection | No Violations Noted | |
2007010 | Primary Facility | 2011-08-25 | Follow-up Inspection | Violation(s) Noted | NERO EC&B Act 2 ROL granted 12/1/11, MBC data clean-up 3/27/15. |
2282165 | Primary Facility | 2014-06-23 | Incident- Response to Accident or Event | No Violations Noted | Arrived at the site at 13:05 in response to a (7) gallon spill of a hydrochloric acid. Cabot contacted the Department at 5:30 PM on 6-18-14 to report they lost (7) gallons of hydrochloric acid on the Pad and it has been neutralized and cleaned up. Hydraulic fracturing operations were in progress during the inspection. Halliburton is the subcontractor at the location conducting the operations. A Halliburton truck containing hydrochloric acid, which is used during well stimulation procedures, lost acid out of a hatch on top of the truck while en route to move the truck from near the access road of the Pad to the truck storage area. Apparently, as the truck stopped, acid sloshed back and forth in the truck, eventually escaping either an open, loose or not completely closed hatch on the top of the truck. The acid flowed down the side of the truck to the ground the surface of the Well Pad. |
2530968 | Primary Facility | 2016-10-20 | Site Restoration | No Violations Noted | Inspection of the Lopatofski J P1 in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit. EPS, Jon Sassi, was also present on this inspection.
The site has been stabilized and vegetation was found to be greater than 70% uniform perennial growth. Temporary E&S BMPs have been removed from the site. No E&S problems were observed at the time of the inspection. Post Construction Stormwater Management BMPs appear to be installed properly according to the site restoration plans. The well pad is less than or equal to the size indicated on the site restoration plans. Based on the site inspection, I recommend this notice of termination be APPROVED. Jon and I also conducted a general inspection of the pad. Signs and labeling appeared to be correct. The mailbox contained the required items. There were no apparent issues with containment. Conductivity readings of water on the pad were of no concern. |
2583323 | Primary Facility | 2017-04-04 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a Routine Complete Inspection of the well site. The E&S Inspection Log showed that Paul Hoven conducted the final E&S Inspection on 2/14/17, it was a post rain event inspection. The site appears to be stable. Being that the ESCGP for this site has been terminated, please remove the E&S Controls. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2007010 | 621315 | 08/25/2011 | 2011-08-25 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | NERO EC&B Act 2 ROL granted 12/1/11, MBC data clean-up 3/27/15. |
2007010 | 621316 | 08/25/2011 | 2011-08-25 | 691.1 - Clean Streams Law-General. Used only when a specific CLS code cannot be used | Administrative | 402 NERO EC&B Act 2 ROL granted 12/1/11, MBC data clean-up 3/27/15. |
2007010 | 621317 | 08/25/2011 | 2011-08-25 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | 6018.610 NERO EC&B Act 2 ROL granted 12/1/11, MBC data clean-up 3/27/15. |
For data sources see[9]