X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20484

Well Details

Well ID: 37-115-20484
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Bridgewater Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148222
Farm/Lease Name: DERIANCHO 2
License Status:
Spud Date:
Permit Date: 2010-12-21
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.799414
Longitude: -75.8524

For data sources see[1][2][3]

Well History

Date Event
2010-12-21 New Permit Application
2011-06-20 Performed Spud Operation
2011-09-18 Drilling Completion
2011-11-06 Perforation
2011-11-06 Performed Stimulation
2012-06-22 DEVIATED
2015-12-07 Inactive Well Request Granted

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-01-02 2012-01-02 6,775 8,276,016

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 15 HCl Superior Well Services Acid Package Hydrochloric acid 7647-01-0 15.00 0.08
AI-2 Superior Well Services Corrosion Inhibitor Isopropanol 67-63-0 30.00 0.00030000
Propargyl alcohol 107-19-7 30.00 0.00030000
Proprietary Component 7.00 0.00007000
2-Butoxyethanol 111-76-2 30.00 0.00030000
KR-153SL Superior Well Services Biocide Ethylene glycol 107-21-1 1.00 0.00027000
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.00547000
Diethylene glycol 111-46-6 3.50 0.00096000
Polyethylene glycol 25322-68-3 50.00 0.01
Super TSC Superior Well Services Scale Control Anionic polymer 15.00 0.00374000
2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt 93858-78-7 15.00 0.00374000
Anionic copolymer 15.00 0.00374000
1,2-Propylene glycol 57-55-6 40.00 0.00997000
Water Carrier/Base Fluid 100.00 88.18
WFR-3B Superior Well Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 50.00 0.03
1,2-Propylene glycol 57-55-6 15.00 0.01
Ethoxylated alcohol blend 15.00 0.01
Poly(oxy-1,2-ethanediyl), .alpha.,.alpha.'-[[(9Z)-9-octadecenylimino]di-2,1-ethanediyl]bis[.omega.-hydroxy
-
26635-93-8 5.00 0.00344000
Sand (Proppant) Proppant 11.62

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-11-06 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 2,979,790.48 325 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 2,016,123.38 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 1,351,133.32 361 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 803,706.85 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 922,358.18 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 701,359.31 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 624,256.00 347 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 561,300.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 2,044.12 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 3.30 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Drill Cuttings 18.05 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Drill Cuttings 1,286.41 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Drill Cuttings 2.41 Tons LANDFILL 100081
2012 CABOT OIL & GAS CORP Fracturing Fluid Waste 2.73 Tons LANDFILL 101534
2012 CABOT OIL & GAS CORP Basic Sediment 22.41 Bbl LANDFILL 101534
2012 CABOT OIL & GAS CORP Produced Fluid 5,613.25 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Basic Sediment 9.70 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Fracturing Fluid Waste 41.21 Tons LANDFILL 100081
2012 CABOT OIL & GAS CORP Fracing Fluid Waste 13,077.74 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Fracturing Fluid Waste 31.26 Tons LANDFILL 100945
2012 CABOT OIL & GAS CORP Basic Sediment 42.52 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Produced Fluid 29.68 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 669.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 42.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 635.64 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 954.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 385.99 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 21.66 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 191.03 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 263.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 232.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 173.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 364.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 176.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 182.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2000344 Primary Facility 2011-08-17 Drilling/Alteration No Violations Noted H&P 371. Drillers log on site and up to date. Secondary containment in place and in good condition. Currently setting conductor. Will be setting at 217'. and will be cemented by Allied.
2368091 Primary Facility 2015-05-07 Routine/Complete Inspection No Violations Noted
2440244 Primary Facility 2016-01-13 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:50 p.m., the cellar was full of ice and snow, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 710psi on the production casing. I took a walk around the location and everything looked OK.

I left the site at 13:15 p.m.

2440736 Primary Facility 2015-09-08 Routine/Complete Inspection No Violations Noted Inspection in conjunction with the notice of termination inspection of the Vandermark Pipeline. No issued observed at the time of the inspection.
2540522 Primary Facility 2016-11-30 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:45p.m., the cellar was about a quarter full of water with no bubbling noticed. The (13x9) vent pipe was open and venting into a small poly tank, the (9x5) vent pipe was open and venting into a small poly tank. There was 556psi on the production casing. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 13:20p.m.

2627712 Primary Facility 2017-08-18 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 14:05p.m.

The cellar was full of water with no bubbling noticed. The (13x9) annulus vent pipe was open and venting into a small plastic tank, the (9x5) annulus vent pipe was open and venting into a small plastic tank. All the annulus vent pipes were connected to one pipe going into the same tank. There was 510psi on the production casing. I took a walk around the location and there were no obvious concerns noticed. I left the site at 14:35p.m.

2714140 Primary Facility 2018-04-03 Routine/Complete Inspection No Violations Noted I inspected the Deriancho well pad for RTNC inspection. The well pad was approximately 80,000 sq. ft. The cut slope and well pad had greater than 70% perennial vegetative cover. There were no temporary BMPs remaining on site. There were two wells associated with this site:

115-20484 115-20590.

There were no erosional issues noted.

There were no violations observed.

2737698 Primary Facility 2018-06-05 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water .5' below grade in the cellar and there was no bubbling noticed. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2833673 Primary Facility 2019-01-30 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was full of snow and ice, I was unable to check for gas. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 1/2/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[9]

References