37-115-20457

Well Details

Well ID: 37-115-20457
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Lenox Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 149356
Farm/Lease Name: STALTER 8
License Status: Plugged and Abandoned
Spud Date: 2010-12-09
Permit Date: 2010-11-01
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: No
Latitude: 41.716897
Longitude: -75.686317

For data sources see[1][2][3]

Well History

Date Event
2010-11-01 New Permit Application
2010-12-09 Performed Spud Operation
2011-02-01 Drilling Completion
2011-02-13 Perforation
2011-02-28 Performed Stage 1 of Stimulation
2011-02-28 Performed Stage 2 of Stimulation
2011-07-26 Fully Plugged
2017-01-10 Begin Plugging
2017-01-12 Finished Plugging

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-02-28 2011-02-28 7,571 666,432

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 WFR-3B Superior Friction Reducer Paraffionic solvent 64742-47-8 50.0 0.04305
Water Carrier / Base Fluid 100.0 63.1751
15 HCl Superior Acid Package Hydrochloric acid 7647-01-0 15.0 0.09048
Recycled Water Carrier / Base Fluid 100.0 23.99192
KR-153SL Kroff Biocide 2,2-Dibromo-3-nitrilo-propionamide 10222-01-2 20.0 0.00392
Sand (Proppant) Proppant 100.0 12.64557
Polyethylene glycol 25322-68-3 50.0 0.0098
Anionic copolymer Proprietary 15.0 0.00161
Anionic polymer Proprietary 15.0 0.00161
Ethoxylated oleylamine 26635-93-8 5.0 0.0043
Ethylene glycol 107-21-1 1.0 0.0002
Propylene glycol 57-55-6 15.0 0.01291
Ethoxylated alcohol blend Proprietary 15.0 0.01291
Diethylene glycol 111-46-6 3.5 0.00069
2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt 93858-78-7 15.0 0.00161
Super TSC Superior Scale Inhibitor Propylene glycol 57-55-6 40.0 0.00431

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-02-28 1 OTTAWA WHITE 965 6,109 0
2011-02-28 2 OTTAWA WHITE 965 5,086 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CABOT OIL & GAS CORP Fracturing Fluid Waste 6.16 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 649.98 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 98.29 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2011 CABOT OIL & GAS CORP Drill Cuttings 9.22 Tons LANDFILL NY # 50S08
2011 CABOT OIL & GAS CORP Drill Cuttings 0.99 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 0.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 1.32 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 9.42 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Drill Cuttings 5.11 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 170.76 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 11.67 Bbl LANDFILL 100955
2011 CABOT OIL & GAS CORP Drill Cuttings 863.30 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 6.87 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD014286009
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 1.70 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 CABOT OIL & GAS CORP Drill Cuttings 4.35 Tons LANDFILL 132310
2011 CABOT OIL & GAS CORP Drill Cuttings 0.82 Tons LANDFILL 100081
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 4,481.14 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 5.04 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2012 CABOT OIL & GAS CORP Servicing Fluid 6.44 Bbl LANDFILL 101534
2012 CABOT OIL & GAS CORP Servicing Fluid 4.00 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Servicing Fluid 404.33 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2012 CABOT OIL & GAS CORP Servicing Fluid 153.89 Bbl LANDFILL 100945
2012 CABOT OIL & GAS CORP Servicing Fluid 12.61 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Servicing Fluid 1,894.73 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 4.09 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Servicing Fluid 200.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1933378 Primary Facility 2010-12-05 Routine/Complete Inspection Violation(s) Noted
1939214 Primary Facility 2010-12-22 Follow-up Inspection No Violations Noted All E&S controls appeared to have been installed consistent with E&S plan. Will use this inspection to close out violations incurred on 12/5/2010.
1946776 Primary Facility 2011-02-01 Drilling/Alteration No Violations Noted Pioneer 61, TD-7571. Casing run and cemented yesterday. In process of rigging down and moving rig off location. Haliburton cemented long string. plug bumped on 1/31 12:08 am. Well control cert's posted. BOP test chart inspected. See inspection report for all cementing details.
1968892 Primary Facility 2011-04-20 Routine/Complete Inspection Violation(s) Noted Routine inspection of well and site. Well is shut in. Metal plate over cellar. Construction fence up. Two other cellars are installed with conductors. Construction fence needs maintenance. On wel 8V there is no well tag. Site ID sign does not have permit numbers for addtional spudded wells on property.
2000337 Primary Facility 2011-08-16 Follow-up Inspection No Violations Noted Work started on Friday. Ran tubing in hole on saturday. No activity on sunday. Currently trying to retrieve tubing plug. May flow back once plug is retrieved. Checked cellar. No bubbling observed. Approximately 6" of fluid in cellar. Secondary in place and in good condition.
2002242 Primary Facility 2011-09-07 Drilling/Alteration No Violations Noted Pulled tubing. RBP set at 4990' with 100' sand above plug. Schlumberger ran logs yesterday. Have 2 vent lines (9x5 and 13x9) no pressures reported. Running in hole to try and identify any leaks in casing. On 9/7 pressured up to 2200 psig @ 8:19 am. At 8:51 recorded 1700 psig. Shut well in @ 6:00 am with 25 lbs....pressured up to 350 after 12 hours..
2005193 Primary Facility 2011-09-15 Drilling/Alteration No Violations Noted Currently running camera down hole. Showing some collar leaks. No pressures on 9 5/8" or 13 3/8". Both vents are open. Downhole camera shows significant leaks at various depths. Top of sand 4728' (gl). Observed gas bubbling @ top of sand. Operator taking information and will propose options for remdiation.
2009314 Primary Facility 2011-10-05 Follow-up Inspection No Violations Noted DEP on site at 11:45. Follow up on status of well as part of onging gas migration investigation. WEll is shut in and has been fracced. VEnts are open and venting to condesate tanks. No bubbling observed in cellar. Fluid level below tops of casing strings. No personnel on site. DEP offsite at 11:55.
2027846 Primary Facility 2011-12-08 Follow-up Inspection Outstanding Violations - No Viols Req'd Follow up inspectionon condition of well. Inspection completed as part of ongoing gas migration investigation. NOV sent 9/19/11 citing defective cement/casing. Well is currently shut in. Annuli vented to Brine tank. Can hear gas venting to brine tank. Noticeable odor near brine tank. Approximately 500 psi noted on gauge on well head.
2031110 Primary Facility 2011-08-16 Complaint Inspection Violation(s) Noted GMI resulting from complaint, 3 gas wells at Stalter Pad investigated, violations entered against 8V, initial complaint water well shows 49.2 mg/L CH4.
2031111 Primary Facility 2011-08-18 Follow-up Inspection Violation(s) Noted GMI resulting from complaint, 3 gas wells at Stalter Pad investigated, violations entered against 8V, follow-up to initial complaint water well inspection shows 57.6 mg/L CH4.
2037783 Primary Facility 2012-01-25 Drilling/Alteration No Violations Noted Stone service rig on site. Moved rig on hole on 1/20/12. Have CIBP set at 6000'. Currently swabbing hole dry and then will monitor for 12 hours to determine presence of any gas flow. Will perforate and squeeze as needed. Had 3100 lbs on tubing when came on well. Vents were open at that time. Request Operator to keep DEP up to date with workover operations.
2041315 Primary Facility 2012-02-06 Follow-up Inspection No Violations Noted Follow up on squeeze and perforation work on well. Ran pressure test on 5700-5702' interval which was location of perf/squeeze. Perforations are still leaking so planning on performing 2nd squeeze at this interval. Will be drilling to 5900' swab tubing dry. After squeeze will WOC a minimum of 24 hrs then perform a pressure test to 1500 lbs. Will hold pressure for 24 hrs and determine if squeeze is holding. Superior is cement contractor.
2046923 Primary Facility 2012-02-23 Drilling/Alteration No Violations Noted Stone service rig on well. Currently in process of swabbing well dry to 5870. Then TIH with tubing and packer to 2950 and set packer. Will flow well through tubing and on 2x5 annulus. Have completed 3 squeezes on 9x5'. Current pressure on 9 x 5" 0 to 1.5 psi. Will be monitoring pressures above and below the packer to identify gas sources and then proceed with further remedial work.
2047065 Primary Facility 2012-02-28 Drilling/Alteration No Violations Noted Currently doing flow meter tests on 2x5 annulus and backside of 5".When set packer @ 4118' - nothing on backside of 2". Currently setting packer @ 5016' - will collect pressure readings on tubing and flow on 2x5". Shutting down operations until March 8th.
2051347 Primary Facility 2012-03-14 Drilling/Alteration No Violations Noted Follow up on workover. Stone Service Rig on site. Drilling out cement to CIBP set at 6020'. Then will drill out CIBP. Will set packer at @5016'. Tubing will be set down through packer to @ 7050'. Will swab well and shut it in and install gauge on 2x5 annulus and monitor. Pressure build up will be vented to poly tank. once complete, rigging down and prepare well for production. At this point no further remedial activites are planned. Pressure on 9 x5 annulus has remained at 0 psi.
2059477 Primary Facility 2012-04-13 Follow-up Inspection No Violations Noted No activity on site. Well is not online. 13 x 9" and 9 x 5" vented to condensate tank. Gauge on 9 x 5" reads 0 psi. Gauge on production string reads 0 psi. Appears to be some sort of flow meter on well head.
2070084 Primary Facility 2012-05-14 Drilling/Alteration No Violations Noted Currently doing remedial squeeze work on well. Perforated 6655' and pumped 11.75 bbls of Standard A cement into backside of production string. Increased pressure to 750# and 1.5 bpm. Continue to 900# and began to take fluid at 1 bpm. Pumped 6 bbls into formation and pressure rose to 1500#. Shut down for 5 mins - had no bleed off. Pressure up to 2000# and shut down - no bleed off. Pressured back down to 1500# and shut well in for 24hrs. On 5/13 - came back and had pressure build up of 700#.
2070092 Primary Facility 2012-05-22 Drilling/Alteration No Violations Noted Follow up on remedial work. Plan for today is as follows: pump 55 sks Standard A cement into perforations (4750 - 4751, 4spf = 8 holes). Will load well and try to squeeze later today with Superior. Inspected Site with Company Man Kit Murphy. Containment in place and in good condition. No violations observed.
2070096 Primary Facility 2012-05-22 Drilling/Alteration No Violations Noted Follow up on remedial work. Service rig on well. Since last inspection = have swabbed well dry to 5800'. Perforated 5700- 4holes. Pumped 2bbl freshwater, pumped 55 sks (Standard A/.2%CD20/ .5% Gasblock) Pressured up to 750#. Pumped 4.75 bbl into perforations. Pressured increased to 1500#, then increased pressure to 2000# and held at this level for 10 min with no reported bleed off. The plugs were then drilled out, and the hole was cleaned out to CIBP set at 6800'. Ran noise/temp log. Logs didnt seem to show any improvement as of this morning. See inspection record 2070092 for plan for today on this well. No violations observed.
2074427 Primary Facility 2012-05-30 Drilling/Alteration No Violations Noted Follow uo on remedial work. As of 5/22 - pumped 44.5 bbl lead, pumped 11.75 bbls cement (15.5 #) loaded hole with 86 bbls. Caught pressure - eased into throttle @ 2 bpm. pressure increased to 800# and began to ease up @ 1.3bpm. Pumped a total of 96.3 bbl flush and pressure @ 2000#. Got 2.3 bbls squeezed away - not sure if went into formation or not. Drilled out and swabbed hole dry. Cement was right below perf's (5700 - 5702). Put meter on but meter did not work over weekend. Have installed new meter on this morning and will monitor pressures/flow. No violations observed.
2085103 Primary Facility 2012-07-16 Drilling/Alteration No Violations Noted SErvice Rig on well. Currently still getting influx of gas from open hole into 5 1/2" (cemented to surface). Venting upper Marcellus to flowback tank - have @ 3lbs on tubing. Still gaining some pressure on 5 1/2". As of this morning had 50 psi on 5 1/2" after 30 mins. Will continue to monitor flow and pressures at this time. No violations observed.
2085263 Primary Facility 2012-07-20 Drilling/Alteration No Violations Noted Follow up on remedial work. Met Company Man Larry Arnold on site. The most recent cement squeeze was 87 bbls @ 7020'. At @ 4550lbs were able to pump at rate of 1.5 bbl/min. CIBP is set at 7250'. According to daily reports - pre-squeeze pressure on 5 1/2" was up to 500lbs. Post-squeeze conditions are currently showing very little gas. Mr. Arlnold installed a 100lb ga. on 5 1/2 while I was present. the gauge showed no pressure increase. The needle vavle was left open. After @ 1.5 mins, the audible gas venting was no longer heard. A cup of water was then held over needle valve. No bubbling was observed in the water indicating no gas flow at that time. At this time the cement and CIBP have not been drilled out. Operations shut down for weekend and will continue to monitor pressures on well. Cabot also collecting water samples from residences in the area of this site. DEP offsite at 15:30. No violations observed.
2086058 Primary Facility 2012-07-24 Drilling/Alteration No Violations Noted Workover rig on site. On 7/21/12 pressure on 5 1/2" was 95 lbs (6 am). Well was bled off. At 16:00 that afternoon pressure was back up to 80 lbs. On Monday 7/23 at 6 am, pressure was up to 365lbs. Well was bled down. Then tripped in hole with tubing and bit. On 7/24 spotted acid @ 5700' in location of perforations previously made. Ran injection test and were able to pump 50 bbls @ 2 bpm with 2660lbs. At time of visit, crew in process of setting cement retainer @ 5680'. On 7/25, 400 sks of cement are being delivered to the site to perform squeeze @ 5700'. The pressure gauge on the Stalter 1H read 260 lbs which is up from 120lbs indicated on 7/20. On Stalter 2H found lower master valve was shut. When opened the pressure was 675lbs on the 5 1/2". Well was bled down and flowed back 6 bbls of fluid at that time. As of 6:00 am this morning (7/24) pressure was up to 780 lbs on the Stalter 2H - 5 1/2" casing. DEP will continue to follow up on remedial efforts.
2089480 Primary Facility 2012-08-01 Drilling/Alteration No Violations Noted Service rig on well. Tubing is currently out of hole. Will be flow testing 5 1/2" later today when opacker arrives. Last perforation 2486-2488'. Cement retainer set at 5685'. Pressures as of this morning= 1H is 475psi, 2H is 810 psi. Have flowmeter currently on 8V 5 1/2" and venting to tank. No violations observed at this time.
2105643 Primary Facility 2012-09-20 Follow-up Inspection No Violations Noted At time of arrival, met Phil Hill and Rich Mullins of Cabot. Pump truck on site to suck out fluid from cellar inorder to identify and label all vent lines for future reference. All vents are now labeled with paint pen. (20 x 13 3/8"), (13 3/8" x 9 5/8"), (9 5/8" x 5 1/2"), and (5 1/2").
2106827 Primary Facility 2012-09-25 Follow-up Inspection No Violations Noted On site to perform 72 hr shut in on all annular spaces of wells on site. DEP - Steve Watson and Andrea Schmid on site with flowmeter. Cabot on site to facilitate data collection and install digital pressure recorders on all annuli. Will return on Friday 9/28 to complete shut in test. At time of inspection the following data was recorded: 20 x 13" = 0.3 psi, 0 flow using 1/8" plate. 13 x 9" = 0 psi, 0 flow with 1/8" plate. 9 x 5 = 0 psi, 0 flow with 1/8" plate. Shut in started at approximately 9 am.
2106880 Primary Facility 2012-09-28 Follow-up Inspection No Violations Noted On site to complete 72 hr shut in. Started test on 9/25/12. Shut in 10 x 13", 13 x 9", and 9 x 5" annuli. Cabot installed digital pressure recorders on each annulus. Pressures were recorded prior to ending test. (20 x 13' = 1.2 psi), (13 x 9" = 1.1psi), and (9 x 5' = 1.7 psi) Cabot disconnected digital recorders and will submit data to DEP. Also collected data from Stalter 1H and 2H.
2117443 Primary Facility 2012-11-19 Drilling/Alteration No Violations Noted packer-4275
2124436 Primary Facility 2012-12-17 Drilling/Alteration No Violations Noted 0 pressure o flow
2124442 Primary Facility 2012-12-12 Drilling/Alteration No Violations Noted toc plug at 3290 no flow or pressure
2125278 Primary Facility 2012-12-07 Plugging(Includes Plugged/Mined Through) No Violations Noted Currently swabbing hole dry. haliburton will be on site tomorow to cement. At 4722' will pump 156 sks - expect to bring cement to @ 3250'. Will pressure up to 1000lbs and leave on overnight. Will return Sunday and tag TOC, swab hole clean, then start flow meter on 5 1/" casing. Currently have CIBP set at 7250', retainers at 7020' and 5680', plug at 4759' - 4774', and have miled casing from 4696' - 4722'.
2135075 Primary Facility 2013-01-24 Drilling/Alteration No Violations Noted Met Mr. Edward Lorenzo - Co. Man on site overseeing flowback. Rigging up to drill out plugs on 1H and 2H. Will flowback while drilling out plugs. Will not require flaring. Once done drilling out, will send gas directly to sales. Checked gauges on 8V - pressures show 0 psi. Secondary containment in place. No violations observed.
2244811 Primary Facility 2013-12-11 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Wells shut in 6:57AM. Opened at 9AM to obtain samples.
2322400 Primary Facility 2014-11-18 Drilling/Alteration No Violations Noted
2443507 Primary Facility 2016-01-06 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2443723 Primary Facility 2016-01-07 Follow-up Inspection Outstanding Violations - No Viols Req'd
2475911 Primary Facility 2016-04-15 Follow-up Inspection Outstanding Violations - No Viols Req'd
2475956 Primary Facility 2016-04-05 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2476104 Primary Facility 2016-04-06 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2476483 Primary Facility 2016-04-13 Follow-up Inspection Outstanding Violations - No Viols Req'd
2498683 Primary Facility 2016-07-05 Site Restoration No Violations Noted On 7/5/16, the Department conducted an inspection of the Cabot Stalter D Pad 1 in response to Cabot’s submittal of a Notice of Termination form for this site. The Department finds that the site is permanently stabilized, and that the record drawings dated 10/15/2010 match the as-built drawings which reflect conditions on the ground as observed by the Department. 3 wells have been drilled on this pad, the 1H (115-20517) and 2H (115-20496) both appear to be in production, while the 8V (115-20457) is not tied into production. There are 3 other wells associated with this well pad, the 3H (115-20506), the 4H (115-20497, and the 6H (115-20522), none of which have been drilled. I recommend this notice of termination be approved.
2516963 Primary Facility 2016-09-06 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2518803 Primary Facility 2016-09-13 Follow-up Inspection Outstanding Violations - No Viols Req'd
2519790 Primary Facility 2016-09-15 Follow-up Inspection Outstanding Violations - No Viols Req'd
2519825 Primary Facility 2016-09-19 Follow-up Inspection Outstanding Violations - No Viols Req'd
2520347 Primary Facility 2016-09-20 Follow-up Inspection Outstanding Violations - No Viols Req'd
2530737 Primary Facility 2016-09-22 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2530751 Primary Facility 2016-09-26 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2530774 Primary Facility 2016-10-03 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2551727 Primary Facility 2017-01-10 Plugging(Includes Plugged/Mined Through) No Violations Noted
2551960 Primary Facility 2017-01-12 Plugging(Includes Plugged/Mined Through) No Violations Noted
2555149 Primary Facility 2017-01-23 Plugging(Includes Plugged/Mined Through) No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1933378 601104 12/05/2010 2010-12-05 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety Silt Sock Stakes loose. Cross drain culvert not installed. Extra Silt sock in ditches on access road. Grubbing piles and Topsoil piles not on plan but present on site.
1968892 609725 04/20/2011 2011-04-20 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling Administrative well tag installed/permit posted
1968892 609726 04/20/2011 2011-04-20 203TAG - Failure to affix, in a permanent manner, a registration number on a well within 60 days of registration Administrative well tag installed/permit posted
2031110 628314 08/16/2011 2011-08-16 CSL401CAUSPL - Polluting substance(s) allowed to discharge into Waters of the Commonwealth Environmental Health & Safety GMI
2031110 628317 08/16/2011 2011-08-16 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative GMI
2031110 628318 08/16/2011 2011-08-16 78.81(a)2 - CASING AND CEMENTING - GENERAL PROVISIONS - Operator conducted casing and cementing activities that failed to prevent migration of gas or other fluids into sources of fresh groundwater. Environmental Health & Safety GMI
2031111 628316 08/18/2011 2011-08-18 CSL401CAUSPL - Polluting substance(s) allowed to discharge into Waters of the Commonwealth Environmental Health & Safety GMI
2031111 628319 08/18/2011 2011-08-18 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative GMI
2031111 628320 08/18/2011 2011-08-18 78.81(a)2 - CASING AND CEMENTING - GENERAL PROVISIONS - Operator conducted casing and cementing activities that failed to prevent migration of gas or other fluids into sources of fresh groundwater. Environmental Health & Safety GMI

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
628314 278905 NOV - Notice of Violation
628314 349806 COA - Consent Order and Agreement $274,421.00 $274,421.00
628317 278905 NOV - Notice of Violation
628317 349806 COA - Consent Order and Agreement $274,421.00 $274,421.00
628318 278905 NOV - Notice of Violation
628318 349608 NOV - Notice of Violation Comply/Closed 2017-11-21
628318 349806 COA - Consent Order and Agreement $274,421.00 $274,421.00
628316 278905 NOV - Notice of Violation
628316 349806 COA - Consent Order and Agreement $274,421.00 $274,421.00
628319 278905 NOV - Notice of Violation
628319 349806 COA - Consent Order and Agreement $274,421.00 $274,421.00
628320 278905 NOV - Notice of Violation
628320 349806 COA - Consent Order and Agreement $274,421.00 $274,421.00

For data sources see[9]