If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20404 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.697633,"lon":-75.855006,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148115 | |
Farm/Lease Name: COSNER 5 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-07-21 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.697633 | |
Longitude: -75.855006 |
Date | Event |
---|---|
2010-07-21 | New Permit Application |
2010-12-27 | Performed Spud Operation |
2011-05-12 | Drilling Completion |
2011-06-01 | Perforation |
2011-06-01 | Performed Stimulation |
2011-11-01 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-07-06 | 2011-07-06 | 7,531 | 6,357,330 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 15 HCl | BJ Services Company | Acid Package | Hydrochloric acid | 7647-01-0 | 15.00 | 0.09 | |
Scaletrol 720 | BJ Services Company | Scale Inhibitor | Ethylene glycol | 107-21-1 | 35.00 | 0.00369000 | ||
Diethylene glycol | 111-46-6 | 5.00 | 0.00053000 | |||||
Water | Carrier/Base Fluid | 100.00 | 88.50 | |||||
Sand (Proppant) | Proppant | 100.00 | 11.34 | |||||
Ferrotrol 300L | BJ Services Company | Iron Control Product | Citric acid | 77-92-9 | 70.00 | 0.00092000 | ||
FRW-18 | BJ Services Company | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | ||
Alpha 1427 | BJ Services Company | Antibacterial Agent | Didecyl dimethyl ammonium chloride | 7173-51-5 | 10.00 | 0.00227000 | ||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 7.00 | 0.00159000 | |||||
Ethanol | 64-17-5 | 5.00 | 0.00114000 | |||||
Glutaraldehyde | 111-30-8 | 30.00 | 0.00682000 | |||||
CI-14 | BJ Services Company | Corrosion Inhibitor | Methanol | 67-56-1 | 68.00 | 0.00062000 | ||
Propargyl alcohol | 5.00 | 0.00005000 | ||||||
Clay Master-5C | BJ Services Company | Clay Stabilization | No hazardous ingredients | 0.00060000 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-06-01 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 1,089,382.21 | 132 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 2,922,538.59 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 1,090,415.39 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 1,062,444.18 | 355 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 582,909.71 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 926,752.10 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 673,508.28 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 633,835.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 485,841.00 | 352 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 20.61 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 169.84 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.50 Tons | LANDFILL | NY # 50S08 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.17 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 0.25 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 26.63 Bbl | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1,049.13 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 463.69 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 3,365.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 0.25 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 82.00 Bbl | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.30 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 8,596.07 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 188.65 Tons | LANDFILL | 100945 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 12.65 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 2,901.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 4.90 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 17.70 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 20.40 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 381.17 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 97.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 492.55 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 7.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 353.41 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 5.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 485.24 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 358.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 242.93 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 168.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 334.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 64.36 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 703.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1918642 | Primary Facility | 2010-09-22 | Routine/Complete Inspection | No Violations Noted | |
1941085 | Primary Facility | 2011-01-04 | Drilling/Alteration | No Violations Noted | Conductor Rig on site drilling with auger rig. Checked with operator for permit. Permit was on site. Excavator on site digging cellar out for Cosner 3H. Plan to place a base of stone, and then top with layer of concrete around conductor. No violations observed. |
1965398 | Primary Facility | 2011-04-04 | Drilling/Alteration | No Violations Noted | BJ Services on site. Cementing 13 3/8' casing. Pump on cement truck broke down...Cement job stopped and had to flush out all cement and dispose of. Contractor bringing replacement pump truck to complet job. Mixer failed on pump truck... |
1974977 | Primary Facility | 2011-05-12 | Drilling/Alteration | No Violations Noted | Richard Durant - Company Man. At TD = 11 620'. 5 1/2" set at 11609'. Cemented with 290 sks Class H 15.5 lb. lead. 1325 sks Class H 15.6 lb tail. Drilled with SOBM. Cemented back up to approximately 4785' with 20 %excess (BJ Services). Walked site...crews cleaning up rig for demobilization. |
2007590 | Primary Facility | 2011-09-01 | Routine/Complete Inspection | No Violations Noted | |
2032291 | Primary Facility | 2012-01-06 | Incident- Response to Accident or Event | Violation(s) Noted | NERO EC&B Act 2 ROL granted on 4/5/12, MBC data cleaan-up 5/6/15. Arrived at the site at 10AM in response to a production fluid spill that occurred on January 5, 2012 at 3:30 PM. A hammer union came loose on the production fluid line associated with the Cosner 5H separation unit causing the production fluid to leak and contact the surface of the ground on the Well Pad. The estimated quantity of the release was 2-3 bbls. Cleanup procedures started last night, 1-5-12. More cleanup will be required as there is still evidence of the production fluid on the surface of the ground on the Well Pad in a close proximity to where the Cosner 5H separation unit is housed. |
2053580 | Primary Facility | 2012-01-10 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | GDS was in the process of excavating test pits in preparation for the URS sampling event. As of 11 AM (5) test pits have been dug and sampling just got underway in a test pit 30-40 feet away from the Cosner 5H separation unit, where the hammer union leaked production fluid. The test pits have been dug to a depth of 2 -3 feet. The representative from URS sampled from the base of the test pit. |
2060083 | Primary Facility | 2011-12-22 | Follow-up Inspection | No Violations Noted | NERO EC&B Act 2 ROL graanted 1/26/15, MBC daataa cleaan-up 5/6/15. Folow up on report of incident associated with Production unit malfunction associated with 5H well. Reportedly a coil ruptured on the production unit and a small release of fluid was observed. At the time of inspection I spoke with the production crew who was on site installing the new unit. According to the crew on location, a surge of sand likely caused the coil to break down and eventually wore a hole through the steel elbow and ultimately causing fluid to escape. A minimal amount of spray (less than 20 gallons) ws reported. The flow was immediately shut off according to Cabot. When i arrived on site, the damaged production unit was already loaded onto a truck and the new unit was in place. Based on my inspection, there was no evidence of any significant impact to the pad from the reported release. |
2436425 | Primary Facility | 2015-12-29 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a Notice of Termination (NOT) for the Cosner W P1 well site. The wells associated with this site are as follows: |
2552140 | Primary Facility | 2017-01-06 | Administrative/File Review | No Violations Noted | |
2720920 | Primary Facility | 2018-04-18 | Routine/Complete Inspection | No Violations Noted | Arrived on location at: 11:30. Weather: Clear, cool, ~ 40 degs. (4) wells were present and in production, the Cosner 4H, 5H, 2H & 3H. All wells (13 3/8"x 9 5/8") and (9 5/8"x 5 1/2") annuli were open and venting, plumbed to a common, shared vent tank. A Gas check performed at shared vent tank showed 100% LEL, 100% CH4. *Due to the possible commingling of gas within the (13x9) and (9x5) annular vents to shared vent tank, a follow-up inspection will need to be scheduled to check the (13x9) cemented annuli for any sustained presence of gas. Please contact me when these (13x9) vents can be isolated and rechecked. (kenkennedy@pa.gov).
- All wells Prod. casing, Static and Differential pressures were being monitored by wireless sending units sending data to onsite Total Flow Control Unit "TFCU". Well pressures were taken off of TFCU readouts beside each wells gas production units "GPUs". See individual well pressures listed below: (PCP= prod. casing press., SP= static press., DP= differential press.) - 4H: PCP = |
2725023 | Primary Facility | 2018-04-30 | Routine/Complete Inspection | No Violations Noted | Arrived on location at: 08:45. Weather: Clear, cool, ~ 40 degs. (4) wells were present and in production, the Cosner 4H, 5H, 2H & 3H. Onsite in follow-up to recheck the isolated, venting (13 3/8"x 9 5/8") cemented annuli as requested in initial insp. report of 4/18/18. Upon arrival I met with Cabot O&G Rep., Aaron Onks. This morning Aaron had isolated all (4) wells (13 3/8"x 9 5/8") annuli and vented to atmosphere at ~ 08:00. Gas checks were performed at all (4) wells (13 3/8"x 9 5/8") annuli using a ALTAIR 5X gas meter, calibrated on 4/26/18. No gas was detected at any of the wells (13 3/8"x 9 5/8") cemented annuli. It appears that the initial gas detected at the shared poly vent tank on 4/18/18 was from the (9 5/8"x 5 1/2") annuli vents. Being that all (4) wells 5 1/2" casing cement was left down, beneath the intermediate casing shoe, this venting is expected and not a violation.
- Following the gas rechecks, Aaron realigned and opened all (4) wells (13 3/8"x 9 5/8") and (9 5/8"x 5 1/2") annuli vents to c |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2032291 | 628588 | 01/06/2012 | 2012-01-06 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | NERO EC&B Act 2 ROL granted on 4/5/12, MBC data cleaan-up 5/6/15. |
2032291 | 628589 | 01/06/2012 | 2012-01-06 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | NERO EC&B Act 2 ROL granted on 4/5/12, MBC data cleaan-up 5/6/15. |
2032291 | 628592 | 01/06/2012 | 2012-01-06 | 78.57 - Failure to post pit approval number | Administrative | NERO EC&B Act 2 ROL granted on 4/5/12, MBC data cleaan-up 5/6/15. Failure to collect brine & other fluids produced during operation & service of well in a tank, pit or series of pits or tanks, or other device approved by the Dept for subsequent disposal or reuse. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
628588 | 279213 | NOV - Notice of Violation | Administrative Close Out | 2012-04-05 | |||
628589 | 279213 | NOV - Notice of Violation | Administrative Close Out | 2012-04-05 | |||
628592 | 279213 | NOV - Notice of Violation | Administrative Close Out | 2012-04-05 |
For data sources see[9]