If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20375 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.716444,"lon":-75.961736,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148684 | |
Farm/Lease Name: KING 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-07-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.716444 | |
Longitude: -75.961736 |
Date | Event |
---|---|
2010-07-27 | New Permit Application |
2010-10-26 | Performed Spud Operation |
2011-01-19 | Drilling Completion |
2011-03-19 | Perforation |
2011-03-19 | Performed Stimulation |
2011-07-26 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-04-11 | 2011-04-11 | 7,049 | 9,260,118 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FRW-18 | BJ Services Company | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | |
Scaletrol 720 | BJ Services Company | Scale Inhibitor | Ethylene glycol | 107-21-1 | 35.00 | 0.00366000 | ||
Diethylene glycol | 111-46-6 | 5.00 | 0.00052000 | |||||
Ferrotrol 300L | BJ Services Company | Iron Control Product | Citric acid | 77-92-9 | 70.00 | 0.00086000 | ||
Sand (Proppant) | Proppant | 100.00 | 11.31 | |||||
Alpha 1427 | BJ Services Company | Antibacterial Agent | Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 7.00 | 0.00159000 | ||
Ethanol | 64-17-5 | 5.00 | 0.00114000 | |||||
Glutaraldehyde | 111-30-8 | 30.00 | 0.00683000 | |||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10.00 | 0.00228000 | |||||
15 HCl | BJ Services Company | Acid Package | Hydrochloric acid | 7647-01-0 | 15.00 | 0.08 | ||
Water | Carrier/Base Fluid | 100.00 | 88.55 | |||||
CI-14 | BJ Services Company | Corrosion Inhibitor | Propargyl alcohol | 5.00 | 0.00004000 | |||
Methanol | 67-56-1 | 68.00 | 0.00058000 | |||||
Clay Master-5C | BJ Services Company | Clay Stabilization | No hazardous ingredients | 0.00057000 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-03-19 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 3,927,406.75 | 224 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 3,550,135.86 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 1,908,210.27 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 1,763,032.05 | 359 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 236,228.35 | 67 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 38,220.90 | 46 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 627,122.34 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 511,324.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 405,992.00 | 362 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 188.50 Tons | LANDFILL | THR029 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 156.89 Tons | LANDFILL | 101615 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 146.00 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 579.98 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 722.22 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 11.67 Bbl | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 23.22 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 4.10 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 5.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 3.58 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 643.75 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 9.42 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,118.35 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 98.40 Tons | LANDFILL | 101615 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 3,794.16 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 24.47 Tons | LANDFILL | NY # 50S08 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.79 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 2.30 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 238.48 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 13,417.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.82 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 179.94 Tons | LANDFILL | 100945 |
2011 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 18.24 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1.32 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 4.07 Bbl | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 6.84 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 193.00 Bbl | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 4.35 Tons | LANDFILL | 132310 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 3.72 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 0.04 Tons | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 4.37 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 4.04 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 29.68 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 0.11 Tons | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 1,108.46 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 40.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 169.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 327.07 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 777.26 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 82.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 115.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 1.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 290.06 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 479.36 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 124.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 161.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 94.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 252.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1938959 | Primary Facility | 2010-12-15 | Drilling/Alteration | No Violations Noted | Patterson 538 Not logging 17" hole. Will start logging after 13 3/8" set. Have not started drilling out 17" hole yet. Will be drilling hole on fluid. Site is lined with secondary containment. Conductor set at 90'. |
1944080 | Primary Facility | 2011-01-20 | Drilling/Alteration | No Violations Noted | David Blood - Company Man. In process of moving rig Patterson 538 to next hole on pad (King 3H). Drillers log on site and up to date. No violations observed at this time. all cement information located on hard copy inspection report. |
1956740 | Primary Facility | 2011-02-18 | Follow-up Inspection | No Violations Noted | |
2140697 | Primary Facility | 2013-01-29 | Incident- Response to Accident or Event | No Violations Noted | Incident Inspection in response to a self-reported release of 20 gallons of production fluid. At the time of the inspection, it was noted that two (2) Diaz roll offs were staged on site. Additionally, an area that appeared to be excavated was covered in plastic.On 2/6/13 the Department spoke to Brody Webster concerning the complaint. Mr. Webster indicated that each of the wells on the King well site were connected to two (2) GPUs. Cabot rigged down one GPU from each well and installed a bull plug at the hammer union on a joint of pipe. Water was in the line and froze which blew out the plug releasing 20 gallons of production fluid. On 1/26/13 crews vacuumed up the residuals and covered it with plastic. On 1/28/13 GDS excavated the release and Resource Environmental Sampled. The Department requests a copy of the sample results be sent within 3 business days of receipt.Violations (§6018.301, §691.402, §78.57) associated with this inspection have been attached to the King 3H Well Site ( Permit #115-20378) |
2353954 | Primary Facility | 2015-03-23 | Routine/Complete Inspection | No Violations Noted | |
2356520 | Primary Facility | 2015-03-31 | Drilling/Alteration | No Violations Noted | |
2358890 | Primary Facility | 2015-04-07 | Drilling/Alteration | No Violations Noted | |
2364606 | Primary Facility | 2015-03-11 | Routine/Partial Inspection | No Violations Noted | |
2364762 | Primary Facility | 2015-03-11 | Preoperation Inspection | No Violations Noted | The Department was on site at the King, D Pad1 to conduct a Preoperational Inspection. Scott Kuchta (DEP-Water Quality Specialist) and I met with Marc Talarico and Shane Christian. The E&S Inspection Log indicated that Paul Koval conducted a weekly inspection on 3/4/15. During the inspection, the site was covered in snow. The Department walked the perimeter of the well site. At the time of the inspection, there were no obvious E&S issues. It appeared as though the perimeter BMP’s (although snow covered) have been installed per the E&S Plan. |
2481748 | Primary Facility | 2016-04-28 | Routine/Complete Inspection | No Violations Noted | |
2483976 | Primary Facility | 2016-05-15 | Follow-up Inspection | No Violations Noted | At time of inspection, arrived on site at 11:50 a.m. to conduct a follow-up inspection for an inspection conducted by Ken Kennedy on 4/28/16 pertaining to gas detected at the vent tanks on the side of the pad. The wells are not producing, the 2H & 3H are shut in and the 4H, 6H, 8H, 9H, & 10H are drilled to TD but haven’t been stimulated yet. I met with Dan Smales (Production Forman) and Bob Birtch (Lead Operator) for Cabot Oil & Gas. Dan unlocked the valves and open and closed the valves so each annulus could be checked separately for gas with an Altair 5X gas detector. There was no gas detected at the vent tanks on the 4H, 6H, & 8H. Gas was detected at the vent tanks for the 2H, 3H, 9H, & 10H.
I left the site at 13:10 p.m. Results of gas shows are on page two. |
2533436 | Primary Facility | 2016-10-24 | Routine/Complete Inspection | No Violations Noted | |
2828097 | Primary Facility | 2019-01-10 | Routine/Complete Inspection | No Violations Noted | I performed a RTNC inspection of the King Pad. The pad was snow covered and the weather was about 27 degrees.
The access road was short and solid. The pad surface was partially vegetated and was stone in others. The pad surface was all solid and stable during the inspection. The cut and fill slopes were stable and solid appearing, and some vegetation was visible through the snow. There were no erosional issues apparent on site at the time of the inspection. The wells were properly labeled. There were no violations noted. |
2842404 | Primary Facility | 2019-02-01 | Routine/Complete Inspection | No Violations Noted | I arrived onsite at 1440 to conduct a site restoration inspection. The weather was sunny and frigid at approximately 12 degrees F with relatively calm winds and clear skies.
The short access road and pad surface was plowed and covered in a packed layer of snow. The pad contains seven (7) producing wells, seven corresponding GPUs, and one produced water tank. Unfortunately, site stabilization was unable to be assessed due to snow cover. An additional inspection will need to be performed to ascertain whether the site meets restoration requirements. No violations were noted. Please feel free to contact me with any questions. |
For data sources see[9]