X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20328

Well Details

Well ID: 37-115-20328
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Springville Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148594
Farm/Lease Name: J OAKLEY 1
License Status:
Spud Date:
Permit Date: 2010-03-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.684064
Longitude: -75.874642

For data sources see[1][2][3]

Well History

Date Event
2010-03-29 New Permit Application
2010-06-25 Performed Spud Operation
2010-10-01 Drilling Completion
2010-11-01 Perforation
2010-12-02 Performed Stimulation
2011-10-28 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2010-12-02 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 1,671,613.75 180 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 3,520,575.30 365 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 1,478,530.04 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 1,346,674.10 363 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 1,001,841.11 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 942,725.25 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 706,246.05 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 624,042.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 459,882.00 310 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CABOT OIL & GAS CORP Basic Sediment 3.00 Bbl LANDFILL 101534
2010 CABOT OIL & GAS CORP Drill Cuttings 77.30 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 101247
2010 CABOT OIL & GAS CORP Drill Cuttings 35.30 Tons LANDFILL THR029
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 255.40 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CABOT OIL & GAS CORP Drill Cuttings 21.90 Tons LANDFILL NY # 50S08
2010 CABOT OIL & GAS CORP Drill Cuttings 125.80 Tons LANDFILL NY # 02S17
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 153.70 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 CABOT OIL & GAS CORP Drill Cuttings 1,065.60 Tons LANDFILL 100955
2010 CABOT OIL & GAS CORP Fracing Fluid Waste 4,811.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010 CABOT OIL & GAS CORP Drill Cuttings 125.80 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 8-4630-00010/00
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 704.98 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 81.18 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 11.67 Bbl LANDFILL 100955
2011 CABOT OIL & GAS CORP Drill Cuttings 36.80 Tons LANDFILL NY # 50S08
2011 CABOT OIL & GAS CORP Basic Sediment 2.19 Bbl LANDFILL 101534
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 7.20 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 3.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 890.68 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 278.35 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 9.42 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 483.56 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CABOT OIL & GAS CORP Produced Fluid 357.41 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 1,547.32 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CABOT OIL & GAS CORP Drill Cuttings 1.15 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Drill Cuttings 166.19 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Drill Cuttings 0.82 Tons LANDFILL 100081
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 5.04 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 1.32 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Basic Sediment 1.44 Bbl LANDFILL 100081
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 6.87 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD014286009
2011 CABOT OIL & GAS CORP Drill Cuttings 4.35 Tons LANDFILL 132310
2011 CABOT OIL & GAS CORP Drill Cuttings 27.44 Tons LANDFILL 100955
2012 CABOT OIL & GAS CORP Basic Sediment 0.09 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Basic Sediment 4.31 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Basic Sediment 3.88 Bbl LANDFILL 101534
2012 CABOT OIL & GAS CORP Produced Fluid 667.92 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CABOT OIL & GAS CORP Produced Fluid 288.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 306.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 780.09 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 4.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 499.26 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 4.94 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 255.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 286.15 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 223.07 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 102.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 1.28 Tons LANDFILL 301358
2018 CABOT OIL & GAS CORP Produced Fluid 317.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 112.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 852.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1914996 Primary Facility 2010-09-21 Drilling/Alteration No Violations Noted H&P 290. Depth of drilling 9050'. TD is proposed for 11,300'. Drillers log on site and up to date. Secondary containment in place. Showed good returns on cement of both 13 3/8" and 9 5/9" casing strings. No violations observed.
2553092 Primary Facility 2017-01-18 Administrative/File Review No Violations Noted

For data sources see[8]

References