If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20321 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.732822,"lon":-75.840875,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Brooklyn Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 149089 | |
Farm/Lease Name: POST 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-03-29 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.732822 | |
Longitude: -75.840875 |
Date | Event |
---|---|
2010-03-29 | New Permit Application |
2010-10-21 | Performed Spud Operation |
2011-05-22 | Drilling Completion |
2011-06-08 | Perforation |
2011-06-08 | Performed Stimulation |
2011-11-01 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-07-13 | 2011-07-13 | 7,168 | 4,017,426 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | B244 | Special Products | Antibacterial Agent | Glutaraldehyde | 111-30-8 | 25.00 | 0.00608000 | |
A264 Corrosion Inhibitor | Schlumberger | Corrosion Inhibitor | Aliphatic alcohols, ethoxylated #1 | 30.00 | 0.00027000 | |||
Methanol | 67-56-1 | 40.00 | 0.00037000 | |||||
Aliphatic acids | 30.00 | 0.00027000 | ||||||
Prop-2-yn-1-ol | 10.00 | 0.00009000 | ||||||
Gelling Agent J580 | Schlumberger | Gelling Agent | Non-Hazardous | 100.00 | 0.02 | |||
L058 | Schlumberger | Iron Stabilizer | Sodium erythorbate | 6381-77-7 | 100.00 | 0.00029000 | ||
J609 | Schlumberger | Friction Reducer | Ammonium sulfate | 7783-20-2 | 30.00 | 0.03 | ||
J218 Breaker | Schlumberger | Breaker | Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 100.00 | 0.00146000 | ||
J532 | Schlumberger | Crosslinker | Sodium tetraborate decahydrate | 1303-96-4 | 30.00 | 0.00477000 | ||
Aliphatic polyol | 30.00 | 0.00477000 | ||||||
Scale Inhibitor B317 | Schlumberger | Scale Inhibitor | Ethylene glycol | 107-21-1 | 5.00 | 0.00050000 | ||
Trisodium phosphate | 7601-54-9 | 5.00 | 0.00050000 | |||||
Water | Carrier/Base Fluid | 100.00 | 90.06 | |||||
Sand (Proppant) | Proppant | 100.00 | 9.77 | |||||
28 HCl | Schlumberger | Acid Package | Hydrochloric acid | 7647-01-0 | 28.00 | 0.08 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-06-08 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 2,074,775.12 | 349 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 819,944.91 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 686,965.51 | 355 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 483,186.62 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 463,035.50 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 384,057.63 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 344,316.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 309,127.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 16.62 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 611.80 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.69 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 11.10 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1,182.45 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 500.00 Bbl | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.55 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 6,929.62 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 1,999.55 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 5.98 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 9.94 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 40.81 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 5.99 Bbl | LANDFILL | 100081 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 363.19 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 175.45 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 616.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 29.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 133.94 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 4.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 86.69 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 99.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 133.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 6.35 Tons | REUSE (AT WELL PAD) | |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 25.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 105.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 38.03 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 154.06 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1939306 | Primary Facility | 2010-12-22 | Follow-up Inspection | No Violations Noted | |
1976021 | Primary Facility | 2011-05-25 | Follow-up Inspection | No Violations Noted | |
1976946 | Primary Facility | 2011-05-31 | Routine/Complete Inspection | Violation(s) Noted | Wel drilled. Rig off location. Crews on site picking up rolloff containers. Parrish on site working on wells installing vent lines. Site has been scrated clean. All plastic removed. Observed bubbling approximately 1 away from base of well head. Bubbles once every 5 secs. Also observed bubbling along cellar wall. Rathole not filled in. Violation of 25 Pa Code 78.65 (1). |
2009315 | Primary Facility | 2011-10-05 | Follow-up Inspection | No Violations Noted | DEP on site at 12:40. Inspected cellar - no evidence of gas leaks. Well is shut in with @ 3300 psi on 5 1/2". Well has been fracced - all production equipment in place. Annuli open and vented to poly tank. DEP offsite at 12:45. |
2375434 | Primary Facility | 2015-06-02 | Routine/Complete Inspection | No Violations Noted | |
2469236 | Primary Facility | 2016-03-30 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 13:25 p.m., the cellar was about a quarter full of water with no bubbling noticed, the (20x13) vent pipe was open and venting to a tank, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 694psi on the production casing. I took a walk around the location and everything looked OK.
I left the site at 13:50 p.m. |
2852044 | Primary Facility | 2019-03-12 | Routine/Complete Inspection | No Violations Noted | I inspected the Post pad on March 12, 2019. It was about 33 degrees F and flurrying. The sky was overcast.
The access road was short, mostly dry, and stable. The well pad was well graded and had some leftover snow patches. It did not have any areas of instability noted. The pad appears to have recently been reworked, with all slopes well stabilized using matting, mulch or a combination of both. There were permanent PCSMs visible and all areas were stabilized. Untouched areas of the pad had adequate vegetation and there were no areas of concern noted. The wells were clearly labeled. There were no noted violations. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1976946 | 612388 | 05/31/2011 | 2011-05-31 | 78.65(1)* - Rat hole not filled | Environmental Health & Safety | rathole filled in |
For data sources see[9]