X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20264

Well Details

Well ID: 37-115-20264
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Dimock Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 149135
Farm/Lease Name: R WARRINER 7
License Status:
Spud Date:
Permit Date: 2010-03-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.751406
Longitude: -75.944922

For data sources see[1][2][3]

Well History

Date Event
2010-03-12 New Permit Application
2010-12-18 Performed Spud Operation
2011-03-05 Drilling Completion
2011-03-22 Perforation
2011-03-22 Performed Stimulation
2011-11-08 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-05-20 2011-05-20 6,762 5,091,198

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CI-150 (Corrosion Inhibitor) Frac Tech Services (FTS) Acid Corrosion Inhibitor Organic Amineresin Salt 30.00 0.00026000
Aromatic Aldehyde 10.00 0.00009000
Quaternary Ammonium Compound 10.00 0.00009000
N,N-Dimethylformamide 68-12-2 10.00 0.00009000
Isopropanol 67-63-0 60.00 0.00053000
Water Carrier/Base Fluid 100.00 88.73
15 HCl Frac Tech Services (FTS) Acid Package Hydrochloric acid 7647-01-0 15.00 0.08
CS-500 SI Frac Tech Services (FTS) Scale Inhibitor No hazardous ingredients 100.00 0.04
FE 100L (Iron Chelator) Frac Tech Services (FTS) Iron Control Product No hazardous ingredients 100.00 0.00179000
FRW-200 Frac Tech Services (FTS) Friction Reducer No hazardous ingredients 100.00 0.06
ICI-3240 Frac Tech Services (FTS) Antibacterial Agent Sodium hydroxide 1310-73-2 4.00 0.00156000
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione 533-74-4 24.00 0.00937000
White Sand Proppant 100.00 11.05

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-03-22 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 1,203,964.00 208 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 1,231,483.55 365 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 751,005.06 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 766,653.02 362 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 414,067.10 355 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 516,191.85 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 408,517.48 363 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 324,817.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 301,921.00 363 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CABOT OIL & GAS CORP Fracturing Fluid Waste 10.80 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 1,501.98 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 0.98 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 1.32 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Basic Sediment 3.74 Bbl LANDFILL 100081
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 9.42 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Drill Cuttings 1,142.92 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 11.67 Bbl LANDFILL 100955
2011 CABOT OIL & GAS CORP Drill Cuttings 1,447.46 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Basic Sediment 22.66 Bbl LANDFILL 101534
2011 CABOT OIL & GAS CORP Drill Cuttings 4.35 Tons LANDFILL 132310
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 6.87 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD014286009
2011 CABOT OIL & GAS CORP Produced Fluid 3,111.80 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 479.00 Bbl LANDFILL THR029
2011 CABOT OIL & GAS CORP Drill Cuttings 0.82 Tons LANDFILL 100081
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 7,944.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 109.43 Tons LANDFILL 100945
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 5.04 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2012 CABOT OIL & GAS CORP Basic Sediment 6.50 Bbl LANDFILL 101534
2012 CABOT OIL & GAS CORP Produced Fluid 1,218.01 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Basic Sediment 2.09 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Basic Sediment 5.89 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Produced Fluid 14.84 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 171.70 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 244.36 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 10.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2014 CABOT OIL & GAS CORP Produced Fluid 814.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 280.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 4.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 220.13 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 225.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 96.18 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 113.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 108.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 40.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 193.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 50.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1944015 Primary Facility 2010-11-26 Routine/Complete Inspection No Violations Noted
1944031 Primary Facility 2010-12-21 Follow-up Inspection No Violations Noted
1976060 Primary Facility 2011-05-25 Follow-up Inspection No Violations Noted
2078601 Primary Facility 2012-06-13 Routine/Complete Inspection No Violations Noted
2389950 Primary Facility 2015-07-14 Routine/Complete Inspection No Violations Noted
2487309 Primary Facility 2016-02-25 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 8:55 a.m., the cellar was empty with no gas detected at the perimeter of the well base, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 546psi on the production casing. I took a walk around the location and everything looked OK.

I left the site at 9:30 a.m.

For data sources see[9]

References