If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20263 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.751397,"lon":-75.945031,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 149135 | |
Farm/Lease Name: R WARRINER 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-03-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.751397 | |
Longitude: -75.945031 |
Date | Event |
---|---|
2010-03-17 | New Permit Application |
2010-04-29 | Performed Spud Operation |
2011-02-03 | Drilling Completion |
2011-04-18 | Perforation |
2011-04-18 | Performed Stimulation |
2011-11-08 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-05-20 | 2011-05-20 | 6,651 | 7,007,784 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ICI-3240 | Frac Tech Services (FTS) | Antibacterial Agent | Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.00942000 | |
Sodium hydroxide | 1310-73-2 | 4.00 | 0.00157000 | |||||
FRW-200 | Frac Tech Services (FTS) | Friction Reducer | No hazardous ingredients | 100.00 | 0.07 | |||
CI-150 (Corrosion Inhibitor) | Frac Tech Services (FTS) | Acid Corrosion Inhibitor | Quaternary Ammonium Compound | 10.00 | 0.00009000 | |||
Organic Amineresin Salt | 30.00 | 0.00026000 | ||||||
Aromatic Aldehyde | 10.00 | 0.00009000 | ||||||
Isopropanol | 67-63-0 | 60.00 | 0.00052000 | |||||
N,N-Dimethylformamide | 68-12-2 | 10.00 | 0.00009000 | |||||
FE 100L (Iron Chelator) | Frac Tech Services (FTS) | Iron Control Product | No hazardous ingredients | 100.00 | 0.00175000 | |||
CS-500 SI | Frac Tech Services (FTS) | Scale Inhibitor | No hazardous ingredients | 100.00 | 0.04 | |||
Water | Carrier/Base Fluid | 100.00 | 89.00 | |||||
15 HCl | Frac Tech Services (FTS) | Acid Package | Hydrochloric acid | 7647-01-0 | 15.00 | 0.08 | ||
White Sand | Proppant | 100.00 | 10.78 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-04-18 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 2,171,240.74 | 208 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 2,458,640.45 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 1,494,293.96 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 1,455,482.99 | 360 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 814,045.89 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 1,042,478.14 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 777,349.52 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 617,916.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 582,111.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 12.92 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,506.98 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 2.28 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1.32 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 4.78 Bbl | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 9.42 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 178.51 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 11.67 Bbl | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 888.80 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 15.48 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 4.35 Tons | LANDFILL | 132310 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 6.87 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 2,653.78 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 109.00 Bbl | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.64 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 9,500.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 5.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 4.77 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 1,072.23 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 2.38 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 5.63 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 14.84 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 214.63 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 222.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 10.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 649.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 288.83 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 4.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 186.87 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 172.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 144.82 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 151.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 131.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 70.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 210.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 49.02 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1944008 | Primary Facility | 2010-11-26 | Routine/Complete Inspection | Violation(s) Noted | |
1944030 | Primary Facility | 2010-12-21 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
1946677 | Primary Facility | 2011-01-11 | Drilling/Alteration | No Violations Noted | Testing BOP's. Drilling out surface casing after test complete. Inspected cellar - no evidence of gas at surface. Site lined with plastic. No violations observed. 9 5/8" casing cemented with 490 sks of 15.6 wt. cement. 1.3 Yield. 15 bbls return to surface reported. |
1946690 | Primary Facility | 2011-01-26 | Follow-up Inspection | Violation(s) Noted | Responded to spill of @20 bbls of freshwater mud. met with Jerry Dugas and Cal Elton (Co. Man). Catch pan inder secondary shakers overfilled and lost 20 bbls of mud onto plastic underneath pan. Pan was full when spill occurred. Violation will remain open until final cleanup can be verified. discussed keeping catch basin empty, and also keeping man on shakers at all times as preventative measures. |
1956750 | Primary Facility | 2011-02-18 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
1956758 | Primary Facility | 2011-02-18 | Follow-up Inspection | No Violations Noted | |
1976056 | Primary Facility | 2011-05-25 | Follow-up Inspection | No Violations Noted | |
2078600 | Primary Facility | 2012-06-13 | Routine/Complete Inspection | No Violations Noted | |
2389948 | Primary Facility | 2015-07-14 | Routine/Complete Inspection | No Violations Noted | |
2487306 | Primary Facility | 2016-05-25 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 8:55 a.m., the cellar was empty with no gas detected at the perimeter of the well base, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 559psi on the production casing. I took a walk around the location and everything looked OK.
I left the site at 9:30 a.m. |
2603735 | Primary Facility | 2017-06-13 | Routine/Complete Inspection | No Violations Noted | I inspected the well site on June 13, 2017. The pad surface was solid and well graded, and there was a fair amount of vegetation growing on the pad surface. The fill slope was well vegetated and stable. The well cellars showed no bubbling and all the wells were labeled. The access road was solid and smooth, with no evidence of washing despite recent rains. Overall the site had no erosional issues at the time of inspection.
There were no violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1944008 | 603246 | 11/26/2010 | 2010-11-26 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1946690 | 603841 | 01/26/2011 | 2011-01-26 | 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Environmental Health & Safety |
For data sources see[9]