Well Details

Well ID: 37-115-20224
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Dimock Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148440
Farm/Lease Name: GREENWOOD 7
License Status:
Spud Date:
Permit Date: 2009-11-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.751089
Longitude: -75.867917

For data sources see[1][2][3]

Well History

Date Event
2009-11-12 New Permit Application
2009-11-22 Performed Spud Operation
2010-05-05 Drilling Completion
2010-06-12 Perforation
2010-08-17 Performed Stimulation
2011-01-25 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2010-08-17 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2010 CABOT OIL & GAS CORP 1,080,458.00 122 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 2,043,811.64 352 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 993,822.84 362 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 890,194.96 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 779,615.53 353 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 408,498.80 363 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 645,491.87 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 519,817.43 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 472,702.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 418,055.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CABOT OIL & GAS CORP Fracing Fluid Waste 9,615.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 258.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CABOT OIL & GAS CORP Produced Fluid 2,810.57 Bbl REUSE OTHER THAN ROAD SPREADING
2010 CABOT OIL & GAS CORP Basic Sediment 2.96 Bbl LANDFILL 101534
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 155.30 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 CABOT OIL & GAS CORP Drill Cuttings 78.10 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 101247
2010 CABOT OIL & GAS CORP Drill Cuttings 22.10 Tons LANDFILL NY # 50S08
2010 CABOT OIL & GAS CORP Drill Cuttings 127.10 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 8-4630-00010/00
2010 CABOT OIL & GAS CORP Drill Cuttings 127.10 Tons LANDFILL NY # 02S17
2010 CABOT OIL & GAS CORP Drill Cuttings 1.70 Tons LANDFILL 100955
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 524.98 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 0.64 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 1.32 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Basic Sediment 2.63 Bbl LANDFILL 100081
2011 CABOT OIL & GAS CORP Drill Cuttings 4.03 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 9.42 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 11.67 Bbl LANDFILL 100955
2011 CABOT OIL & GAS CORP Drill Cuttings 54.57 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Basic Sediment 12.29 Bbl LANDFILL 101534
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 6.87 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD014286009
2011 CABOT OIL & GAS CORP Produced Fluid 2,161.67 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 4.35 Tons LANDFILL 132310
2011 CABOT OIL & GAS CORP Drill Cuttings 0.82 Tons LANDFILL 100081
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 5.04 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 CABOT OIL & GAS CORP Drill Cuttings 11.64 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD014286009
2012 CABOT OIL & GAS CORP Produced Fluid 871.64 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Basic Sediment 1.64 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Basic Sediment 3.49 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Basic Sediment 4.88 Bbl LANDFILL 101534
2012 CABOT OIL & GAS CORP Produced Fluid 14.84 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 289.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 144.61 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 729.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 60.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 353.53 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 4.25 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 281.21 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 270.94 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 96.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 284.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 299.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 164.45 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 418.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1947533 Primary Facility 2011-01-05 Routine/Partial Inspection Violation(s) Noted SW-defective cement job, 78.86(a) & 78.81(a)(2)&(3), 0.0 psi at 9 5/8 annulus & 0.6 psi at 5 1/2 annulus, 75% peak and sustained 40% gas at 9 5/8 annulus & 90% peak gas at 5 1/2 annulus, 10 day response requested.
1956784 Primary Facility 2011-03-05 Routine/Complete Inspection No Violations Noted
1980745 Primary Facility 2011-06-13 Follow-up Inspection Violation(s) Noted
2007723 Primary Facility 2011-09-02 Routine/Complete Inspection No Violations Noted
2028184 Primary Facility 2011-12-08 Routine/Complete Inspection No Violations Noted Well online. vents open and vented to brine tank. Cellar dry - base filled with gravel. Guage on well reading 2500 psi. Pipeline crews working on site. inspection completed as part of ongoing gas migration investigation.
2033527 Primary Facility 2011-12-05 Incident- Response to Accident or Event No Violations Noted
2139938 Primary Facility 2013-02-14 Follow-up Inspection No Violations Noted On site to collect pressure readings from well. DEP reps on site = Steve Watson., Eric Rooney, and Gene Rickard. DEP met with John Smelko of Cabot. Selman reps on site to assist with pressure reading and gas screening. Cabot shut in annuli at @9am this morning. A digital pressure gauge was installed by Cabot on the 16" x 9 5/8" annulus. Pressure was 0 psi. Gauge was removed, and open vent flow was screened using Model 60 gas meter. Model 60 reading =>5% combustible gas. The pressure gauge was installed on the 9 5/8" x 5 1/2" annulus. Pressure reading was 8.5 psi. Model 60 reading = 100% combustible gas. No samples were collected. After completion of testing, Cabot re-connected vent lines and locked vents open.
2481918 Primary Facility 2016-04-27 Routine/Partial Inspection No Violations Noted The Department was on site at the Greenwood, R. Pad 1 to conduct a Routine Partial Inspection. The E&S Inspection Log indicated that Mike Brilla (TEC) conducted a Post Rain Event Inspection on 4/27/16. It appears as though the landowner has made a road to the left of the access road gate to circumvent said gate. Also, it seems as if the landowner has been working areas on the well site. There is a large area within the well pad surface that looks like wood chips have been strewn across it and sections of plastic packaging are intermixed.

The perimeter ditch does not appear to meet temporary stabilization requirements. The Department requests that the operator investigate the area and deploy a method of erosion control that is consistent with your plan. The production tanks were stained during the inspection. One of the tanks has more staining than the other. The Department requests that the operator inspect the tanks to find the origin of the staining.

2528906 Primary Facility 2016-10-17 Follow-up Inspection No Violations Noted
2642439 Primary Facility 2017-10-02 Site Restoration No Violations Noted I inspected the site for notice of termination (NOT) on October 2, 2017. The site was surrounded by active agriculture (field corn). The access road leading in was in good shape with no rutting and the site was well vegetated on the cut and fill slopes. The pad surface was solid and stable as well. There were no erosional issues noted.

I recommend APPROVAL of this NOT.

There were no violations observed.

2774793 Primary Facility 2018-09-11 Routine/Complete Inspection No Violations Noted Arrived on location at 09:00. Weather: ~ 65 degs., light rain, slight breeze. Onsite to initiate 72 hr. pressure build up test "PBUT" on the annuli of the Greenwood 1V, 6H, 7H & 8H wells. All wells, back side of production casing annuli have been isolated and were venting to onsite poly vent tanks. The 6H, 7H & 8H wells (16"x 9 5/8") cemented annuli had open top 16" casings in cellar *. The 1V wells (9 5/8"x 7") cemented annulus was beneath water level in cellar, no bubbling was noted at time of inspection.

- Upon arrival I met with Cabot O&G Reps. Jeremy Rapp and Sully Rutledge. Prior to shutting in wells annuli, initial gas screenings and flow checks were performed at the 1V (7"x 4 1/2") and 6H, 7H & 8H (9 5/8"x 5 1/2") annuli using the Depts. Altair 5X gas meter, calibrated this morning, and Cabots' RS-484 Alicat "Whisper" flow meter. Pre-shut in screenings showed: - 1V: (7"x 4 1/2") = 100% CH4, 9.2 cf/d; (9 5/8"x 7") open casing top in cellar, No bubbling noted. - 6H: (9 5/8"x 5 1/2") = 100% CH4, 15.2 cf

2775655 Primary Facility 2018-09-14 Routine/Complete Inspection No Violations Noted Arrived on location at: 09:00. Weather: ~ 75 degs., Light rain, Slight breeze. Onsite to conclude the 72-hr. pressure build up test ¿PBUT¿ being performed on the Greenwood 1V, 6H, 7H & 8H wells, back side of production casing annuli and the 1V¿s (9 5/8¿x 7¿) cemented annulus.

- Upon arrival I met with Cabot O&G Rep. Sully Rutledge and Selman and Associates Reps. Kaydee Oliver and Russell Mohlt. There was also a GDS Vac Truck and Operator onsite to add or remove water to cellar areas as needed. The ending PBUT pressures were checked by Cabot Rep. using a digital Crystal pressure gauge. Ending pressures are listed below: - 1V: (7"x 4 ½¿) = 21 psi., Gas sample taken = 100% CH4; (9 5/8"x 7") = 0.0 psi., No sample taken. Cellar was initially full of water w/ no bubbling noted. Cellar was then emptied confirming (9 5/8"x 7") vent line connection to enclosed casing top. - 6H: (9 5/8¿ x 5 ½¿) = 12.0 psi. Gas sample taken = 100% CH4; (16"x 9 5/8") = 0.0 psi. (Open casing top in cellar). Cellar was initially full of w

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1947533 604113 01/05/2011 2011-01-05 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative 0.0 psi at 9 5/8 annulus & 0.6 psi at 5 1/2 annulus, 75% peak and sustained 40% gas at 9 5/8 annulus & 90% peak gas at 5 1/2 annulus
1947533 604114 01/05/2011 2011-01-05 207B - Failure to case and cement to prevent migrations into fresh groundwater Environmental Health & Safety 78.81(a)(2)&(3) - 0.0 psi at 9 5/8 annulus & 0.6 psi at 5 1/2 annulus, 75% peak and sustained 40% gas at 9 5/8 annulus & 90% peak gas at 5 1/2 annulus
1980745 613567 06/13/2011 2011-06-13 78.65(1)* - Rat hole not filled Environmental Health & Safety rathole cleaned and filled in
1980745 613568 06/13/2011 2011-06-13 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. Administrative rathole cleaned and filled in
1980745 613569 06/13/2011 2011-06-13 402CSL B - Failure to meet requirements of permit, rules and regulations, or order of DEP. Environmental Health & Safety rathole cleaned and filled in
1980745 613570 06/13/2011 2011-06-13 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety rathole cleaned and filled in

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
604113 267423 NOV - Notice of Violation
604114 267423 NOV - Notice of Violation
613567 272560 NOV - Notice of Violation
613568 272560 NOV - Notice of Violation
613569 272560 NOV - Notice of Violation
613570 272560 NOV - Notice of Violation