Well ID: 37-115-20180 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.682786,"lon":-75.799106,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Lathrop Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149040 | |
Farm/Lease Name: PHELPS UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2009-06-24 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.682786 | |
Longitude: -75.799106 |
Date | Event |
---|---|
2009-06-24 | New Permit Application |
2009-09-20 | Performed Spud Operation |
2009-10-23 | Drilling Completion |
2010-01-21 | Perforation |
2010-01-21 | Performed Stimulation |
2010-02-25 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-01-21 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CHIEF OIL & GAS LLC | 564,113.00 | 73 | 0.00 | 0 | 0.00 | 0 |
2011 | CHIEF OIL & GAS LLC | 1,509,841.00 | 271 | 0.00 | 0 | 0.00 | 0 |
2012 | CHIEF OIL & GAS LLC | 1,032,447.69 | 351 | 0.00 | 0 | 0.00 | 0 |
2013 | CHIEF OIL & GAS LLC | 814,204.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 348,322.00 | 271 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 345,928.36 | 200 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 513,728.44 | 364 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 624,885.50 | 355 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 480,396.51 | 325 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 336,548.75 | 343 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | CHIEF OIL & GAS LLC | Drilling | 6,104.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0008451 |
2010 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 1,720.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2010 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 8,242.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 670.24 Bbl | LANDFILL | 100955 |
2011 | CHIEF OIL & GAS LLC | Produced Fluid | 131.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 1,591.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2012 | CHIEF OIL & GAS LLC | Produced Fluid | 598.70 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHIEF OIL & GAS LLC | Produced Fluid | 309.40 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 214.08 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 35.71 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 122.77 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 36.45 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 164.01 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 115.46 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 17.24 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1817517 | Primary Facility | 2009-07-27 | Drilling/Alteration | No Violations Noted | At time of inspection there was no activity on site. All rigging and equipment was offsite except for one frac tank. |
1819473 | Primary Facility | 2009-07-06 | Drilling/Alteration | Violation(s) Noted | No E&S plan on-site, well permit # and operator info not posted on-site. MBC input this insp on 8/12/09 as the previous attempt by the OGI inspector to enter this inspection did not complete. MBC 8/12/09. See Insp ID 1816517 done 7/27/09, past viols corrected. MBC 8/12/09 |
1830145 | Primary Facility | 2009-09-21 | Drilling/Alteration | No Violations Noted | At time of inspection Patterson Rig 251 was on site. The Site ID Sign and E/S plan were present at the entrance to the Site. During inspection I met with the Company Man, who indicated they were in the process of drilling a 12-1/4¿ hole with air to approximately 2000¿. The Company Man indicated that water was encountered at approximately 940¿, at which point they began adding soap during drilling to help keep the hole clean. Once TD is reached, 9-5/8¿ surface casing will be set and cemented to surface. I noted to the Company Man that the spray from the discharge line was traveling beyond the reserve pit and well pad are to grassy area nearby. I suggested that this spray be controlled better to direct all cuttings into the reserve pit. The Company Man said he would address this problem. A follow up inspection will be completed. |
1841215 | Primary Facility | 2009-10-22 | Follow-up Inspection | Viol(s) Noted & Immediately Corrected | The inspection was completed to follow up on a reported spill of drilling mud. According to the Company Man on location, approximately 10 bbls of water-based drilling mud spilled onto the well pad as a result of a mud tank overflow. The Operator had the area scraped up using hand shovels and a backhoe. The material was disposed of into the reserve pit. |
1852130 | Primary Facility | 2009-12-17 | Follow-up Inspection | Violation(s) Noted | : I arrived on Site on 12/16/09 at approximately 15:30. At the time of inspection, there was no drill rig on site. A backhoe operator and laborer was on site scraping up plastic lining from the well pad adjacent the reserve pit, and placing the plastic into a rolloff container for disposal. The reserve pit at the time of inspection was frozen over. Freeboard in the reserve pit was less than 2¿. A pile of drill cuttings dumped in one area of the reserve pit extended beyond the pit and onto the well pad. |
1852429 | Primary Facility | 2009-11-10 | Routine/Complete Inspection | No Violations Noted | |
2161100 | Primary Facility | 2013-04-04 | Routine/Partial Inspection | No Violations Noted | |
2713349 | Primary Facility | 2018-03-20 | Routine/Complete Inspection | No Violations Noted | Arrived onsite at 14:30. Weather overcast, ~ 38 degs. (5) wells were present on pad, the Phelps 2H, 1H, 1V, 3H and 4H. The 2H well was shut in and the other (4) wells were producing at time of insp. There was also a US Compressor unit onsite. The 1V, 1H & 2H wells were connected to compressor unit at time of insp. Visual insp. of production tanks showed moderate to heavy corrosion and rust staining at 3 out of 6 prod. tanks. (See pics on page 2). Updating and/or maintenance of prod. tanks is needed.
- Inspection of wells showed all (5) wells had the prod. tree top press. "PTTP", prod. casing press. "PCP" and prod. line press. "PLP" being monitored by wireless data sending units and/or analog gauges. - The 2H, 1H & 1V wells had (1) annular vent present labeled (9 5/8"x 5 1/2") venting to a shared poly vent tank. - The 3H & 4H wells had (2) annular vents present labeled (13 3/8"x 9 5/8") and (9 5/8"x 5 1/2") venting to a shared poly vent tank. A gas check performed at this vent tank lid opening showed 100% C |
2803440 | Primary Facility | 2018-11-14 | Routine/Complete Inspection | No Violations Noted | This inspection was conducted to confirm Chief's assessment that the project meets the minimum requirements for permit termination. The Department’s determination is that the site meets the requirements for permit termination. I recommend the NOT be approved. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1819473 | 569085 | 07/06/2009 | 2009-07-06 | 102.4NOPLAN - No E&S plan developed, plan not on site | Administrative | 102.4(b)(7) viol, no E&S plan posted on-site. See Insp ID 1817517 done 7/27/09, past viols corrected. MBC 8/12/09 |
1819473 | 569086 | 07/06/2009 | 2009-07-06 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | 601.201(g) viol, no well permit # & operator info posted on-site. See Insp ID 1817517 done 7/27/09, past viols corrected. MBC 8/12/09 |
1841215 | 575089 | 10/22/2009 | 2009-10-22 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | immediatly corrected. |
1852130 | 578467 | 12/17/2009 | 2009-12-17 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | Administrative |
For data sources see[8]