If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20117 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.736538,"lon":-75.862843,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 149151 | |
Farm/Lease Name: RATZEL 3V | |
License Status: | |
Spud Date: | |
Permit Date: 2009-03-06 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.736538 | |
Longitude: -75.862843 |
Date | Event |
---|---|
2009-03-06 | New Permit Application |
2009-04-08 | Drilling Completion |
2009-07-19 | Perforation |
2009-08-15 | Performed Stimulation |
2009-09-17 | NEWLY DRILLED |
2009-11-03 | Performed Spud Operation |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2009-08-15 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | 62274.00 | 126 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 94,831.50 | 338 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 36,036.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 32,327.58 | 353 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 24,140.37 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 24,248.18 | 254 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 26,613.81 | 300 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 20,109.61 | 357 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 20,365.43 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 20,887.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 12,034.00 | 207 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 158.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Produced Fluid | 162.48 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Basic Sediment | 1.90 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 95.10 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 47.80 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101247 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 13.50 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 77.80 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 8-4630-00010/00 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 77.80 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.00 Tons | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 0.59 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 133.87 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 26.64 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 13.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 54.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 66.21 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 17.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 71.28 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Servicing Fluid | 1.02 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 85.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 29.21 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 12.79 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 15.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Servicing Fluid | 24.75 Tons | LANDFILL | 100933 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1845084 | Primary Facility | 2009-11-10 | Follow-up Inspection | No Violations Noted | I inspected the well head for evidence of leakage. There was no standing water present in the cellar and no visible bubbling observed. The well is currently on-line. |
1890859 | Primary Facility | 2010-06-08 | Routine/Complete Inspection | No Violations Noted | |
1973819 | Primary Facility | 2011-05-13 | Routine/Complete Inspection | No Violations Noted | |
2295294 | Primary Facility | 2014-07-16 | Complaint Inspection | No Violations Noted | |
2295355 | Primary Facility | 2014-07-21 | Follow-up Inspection | No Violations Noted | |
2295368 | Primary Facility | 2014-07-23 | Follow-up Inspection | No Violations Noted | |
2528779 | Primary Facility | 2016-10-12 | Site Restoration | No Violations Noted | Inspection of the Ratzel P1 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit.
The site has been stabilized and vegetation was found to be greater than 70% uniform perennial growth. Temporary E&S BMPs have been removed from the site. No E&S problems were observed at the time of the inspection. Post Construction Stormwater Management BMPs appear to be installed properly according to the site restoration plans. The well pad is less than or equal to the size indicated on the site restoration plans. Based on the site inspection, I recommend this notice of termination be APPROVED. |
2791954 | Primary Facility | 2018-10-19 | Routine/Complete Inspection | No Violations Noted | Arrived on location at 09:00. Weather: Clear ~ 35 degs. with slight breeze. Onsite to initiate 72 hr. pressure build up test "PBUT" on the annuli of the Ratzel 1H, 2H & 3V wells. Vac Truck had emptied well cellars to verify annuli vent connections. All wells (9 5/8"x 7") & (7"x 4 1/2") annuli have been isolated and were venting to onsite poly vent tanks. All wells (20"x 13 3/8") & (13 3/8"x 9 5/8") cemented annuli had open top casings in cellar. The 2H & 3V wells open casings tops were beneath the cement floor of cellars. (See individual well insp. pictures for cellar details).
- Upon arrival, I met with Cabot O&G Rep. Jeremy Rapp. Prior to shutting in wells annuli, initial gas screenings and flow checks were performed at the wells annuli using the Depts. Altair 5X gas meter, calibrated yesterday, and Cabots' RS-484 Alicat "Whisper" flow meter. Pre-shut in screenings showed gas and flow detected at the following annuli: - 2H: (7"x 4 1/2") = 100% CH4, 575 cf/d - 3V: (7"x 4 1/2") = 100% CH4, 18.5 cf/d All wel |
2795880 | Primary Facility | 2018-10-22 | Routine/Complete Inspection | Pending | Arrived on location at: 08:45. Weather: Overcast ~ 38 degs. Onsite to conclude the 72-hr. pressure build up test ¿PBUT¿ being performed on the Ratzel 1H, 2H & 3V wells annuli.
- Upon arrival I met with Cabot O&G Reps. Jeremy Rapp and Selman and Associates Reps. Kaydee Oliver and Tyler Thomas. There was also a GDS Vac Truck and Operator onsite to add or remove water to cellar areas as needed. The ending PBUT pressures were checked by Cabot Rep. using a digital Crystal pressure gauge.Ending pressures are listed below: - 1H: (7"x 4 1/2") = 0.0 psi., No gas detected.; (9 5/8"x 7") = -2.2 psi., No gas detected. Cellar was full of water, no bubbling was noted. - 2H: (7"x 4 1/2") = 170.1 psi., Gas sample taken = 100% CH4; (9 5/8"x 7") = -3.1 psi., No gas detected. Cellar was full of water. No bubbling was noted. - 3V: (7"x 4 1/2") = 61.0 psi.*, Gas sample taken = 100% CH4; (9 5/8"x 7") = 24.2 psi.*, Gas sample taken = 100% CH4. Cellar was full of water, no bubbling noted. All shut-in annuli were opened back up, ven |
For data sources see[8]