Well ID: 37-115-20092 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.712817,"lon":-75.946638,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148385 | |
Farm/Lease Name: G SHIELDS 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-03-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.712817 | |
Longitude: -75.946638 |
Date | Event |
---|---|
2009-03-12 | New Permit Application |
2009-08-14 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 195,695.50 | 204 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 132,852.26 | 357 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 97,967.78 | 353 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 49,061.93 | 363 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 56,281.35 | 321 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 25,086.06 | 322 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 50,364.24 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 47,874.21 | 358 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 31,090.00 | 302 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 26,541.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | Drilling | 600.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0027057 |
2009 | CABOT OIL & GAS CORP | Drilling | 1,190.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0008451 |
2009 | CABOT OIL & GAS CORP | Drilling | 777.00 Bbl | Brine or Industrial Waste Treatment Plt | PAR9000009 |
2009 | CABOT OIL & GAS CORP | Drilling | 2,200.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2010 | CABOT OIL & GAS CORP | Basic Sediment | 2.22 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 51.90 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101247 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 171.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Produced Fluid | 314.11 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 14.70 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,100.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 84.50 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 103.20 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.10 Tons | LANDFILL | 100955 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 357.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD085690592 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 84.50 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 8-4630-00010/00 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,073.55 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,140.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 1.15 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 276.97 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.47 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.66 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.69 Tons | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Servicing Fluid | 67.82 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.40 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.81 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 102.17 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Servicing Fluid | 86.52 Bbl | LANDFILL | 100945 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 52.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 199.45 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 7.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 250.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 5.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 58.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 4.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 34.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 30.07 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 44.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 36.34 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 19.59 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Servicing Fluid | 42.09 Tons | LANDFILL | 100933 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 37.47 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 7.73 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 90.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1851911 | Primary Facility | 2009-11-12 | Routine/Complete Inspection | No Violations Noted | |
1890399 | Primary Facility | 2010-05-24 | Routine/Complete Inspection | No Violations Noted | |
2028197 | Primary Facility | 2011-12-13 | Drilling/Alteration | No Violations Noted | DOH Energy 282. Co. man Ronnie Wright. Ran Temp logs. Perf'd and squeezed on 4 1/2' string. shot holes 1420 - 1422 (4 shots/ft). Were able to squeeze @ bbls of microfine cement into perforations. monitored for 48 hrs. Pressured up to 1500 lbs - no leak off detected. When let off , start to again see buildup of pressure on backside up to 520psi. Currently waiting for instructions on next procedure. Will be running CBL tomorrow. |
2029561 | Primary Facility | 2011-12-22 | Drilling/Alteration | No Violations Noted | Currently doing remedial work on well. On 12/28 perf'd and squeezed .5 bbl microfine cement at 1442-1444 (6 SPF). Pressured up to 1500 lbs and held for 48 hrs. Reportedly no shows of pressure on annulus after squeeze. Currently drilling out cement and tagging top of sand. Will be installing chart recorders on annulus and let sit over holiday break. Work to resume on 12/28. |
2405548 | Primary Facility | 2015-09-09 | Routine/Complete Inspection | No Violations Noted | |
2496273 | Primary Facility | 2016-06-27 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 10:35a.m., the cellar was empty with no gas detected at the perimeter of the cellar, the (9x5) vent pipe was open and venting to a tank, there was 584psi on the production casing. I took a walk around the location and everything looked OK.
I left the site at 11:10a.m. |
2691058 | Primary Facility | 2018-02-05 | Administrative/File Review | No Violations Noted | The Well Site Restoration Report required by 78.65 was accepted. No violations were noted. If you have any questions, please contact me. |
2704585 | Primary Facility | 2018-03-08 | Routine/Complete Inspection | No Violations Noted | Arrived at location at 08 30. Weather: Overcast, cold, ~ 25 degs. (2) wells were present on location, the Shields, G. 1V and 5H. Both wells were producing at time of inspection. Both wells production pressures were being monitored by remote monitors sending data to Total Flow Control Units "TFCU"s with LED readouts located by production units. Each well had (1) annular vent plumbed to a shared poly vent tank. The 1V wells annular vent was labeled (9 5/8" x 4 1/2") and the 5H wells annular vent was labeled (9 5/8" x 5 1/2"). Both wells annular vents were open and venting to vent tank. A gas check performed at the shared vent tank opening showed: 100% LEL, 100% CH4. Gas check performed 3' away from vent tank showed 0% LEL, 0% CH4.
- Review of well history showed that previous 72 hr. pressure build up tests "PBUT" had been performed on these wells on (10/29 - 11/1/11) and (12/28 - 12/31/11). The initial PBUT showed the 1V, (9x4) press. build to 550 psi. and the 5H, (9x5) built to 8 psi. Subsequently, Cabot perf |
2706931 | Primary Facility | 2018-03-19 | Routine/Complete Inspection | No Violations Noted | Arrived at location at 08:45. Weather: Clear, cold, ~ 30 degs. (2) wells were present on location, the Shields, G. 1V and 5H. Both wells were producing at time of inspection. Onsite to witness start of the 72hr. press. build up test "PBUT" being performed on both wells surface x production casing annuli. Upon arrival met with Cabot O&G Reps., Adam Vogt, Aaron Onks, Brody Webster and Steve Catalfamo onsite. Both wells surface x production casing annuli were equipped with pressure logging units tied into Cabot's cygnet monitoring system. Adam confirmed communication with loggers through cynet system. These annuli were shut in at 09:00. We will return to site on Thursday, March 22 at 09:00 for conclusion of the 72 hr. PBUT.
Wells pressures were taken off LED readouts mounted at production units. (Prod. Casing Press. = CP, Static Press. = SP, Differential Press. = DP.) Shields, G. 1V: CP = 466.8 psi., SP = 491.4 psi., DP = 9.0 psi. Shields, G. 5H: CP = 490.7 psi., SP = 493.8 psi., DP = 61.8 psi. No obvious c |
2709411 | Primary Facility | 2018-03-22 | Routine/Complete Inspection | No Violations Noted | Arrived at location at 09:00. Weather: Clear, cold, ~ 30 degs. Onsite for the conclusion of the 72hr. press. build up test "PBUT" being performed on both wells surface x production casing annuli. The PBUT was started on 3/19/18 at 09:00. Upon arrival met with Cabot O&G Reps., Adam Vogt & Aaron Onks and (3) Selman & Assoc. Reps. Both wells surface x production casing annuli were equipped with pressure logging units tied into Cabot's cygnet monitoring system. The PBUT ending pressures were:
- 1V: (9 5/8"x 4 1/2") = 212 psi. - 5H: (9 5/8"x 5 1/2") = 42 psi. Gas checks performed by the Dept. and Selman showed: 100% CH4. The Dept. and Selman collected gas samples off both these annuli at approx. 09:30. Both wells annuli were bleed down and opened back up to poly vent tank. Post PBUT, water samples were collected at area resident by Eric Rooney, D.E.P. Geologist and Moody & Associates prior to bleeding pressures off of gas wells. - The press. build in the 1V (9x4) annulus is a significant increase from the last |
2739575 | Primary Facility | 2018-06-05 | Routine/Complete Inspection | No Violations Noted | Arrived on location at 08:30. Weather: Clear, mild ~ 60 degs. Cabot O & G has mobilized "Hybrad" W/O Rig onto location to start remedial work of the 1V wells (9x4) annulus. I met with Cabot's Well Site Supervisor "WSS", James Restley, on location. Mr. Restley mentioned that Rig crew will be arriving on location at 10:00 today to start rigging up "RU", W/O rig and ancillary rig equipment. GDS site contractors were onsite readying to set liner and containment as needed.
- A protective cage has been placed around the existing 5H well. This well will remain in production throughout the 1V wells remedial work. - Mr. Restley anticipates having site prep and W/O RU completed to start remedial operations tomorrow morning. We discussed basics of W/O plan and anticipated timeline. Cabot will be sending daily progress reports throughout these W/O operations. All was found in good order at time of inspection. Left site at 09:30. |
For data sources see[7]