If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20087 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.683883,"lon":-75.905678,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 149508 | |
Farm/Lease Name: W CHUDLEIGH 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-12-31 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.683883 | |
Longitude: -75.905678 |
Date | Event |
---|---|
2008-12-31 | New Permit Application |
2009-12-07 | Performed Spud Operation |
2010-01-17 | Drilling Completion |
2010-05-23 | Perforation |
2010-05-23 | Performed Stimulation |
2010-11-15 | NEWLY DRILLED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-05-23 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 71,309.50 | 185 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 65,961.90 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 42,043.78 | 364 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 35,834.15 | 364 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 31,764.39 | 320 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 24,062.59 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 29,609.21 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 24,248.98 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 25,213.00 | 316 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 62,308.00 | 359 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | Basic Sediment | 1.85 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 170.10 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Produced Fluid | 686.21 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 51.50 Tons | LANDFILL | 101247 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 14.60 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 83.80 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 102.40 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.10 Tons | LANDFILL | 100955 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 83.80 Tons | LANDFILL | 8-4630-00010/00 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 524.98 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 4.03 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 11.67 Bbl | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 1.55 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 9.42 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 336.79 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.64 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 54.57 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.82 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 5.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1.32 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 0.85 Bbl | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 6.87 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 4.35 Tons | LANDFILL | 132310 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.31 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Servicing Fluid | 2.15 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 1.04 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.80 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 9.89 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2012 | CABOT OIL & GAS CORP | Servicing Fluid | 0.22 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 183.29 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Servicing Fluid | 187.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 60.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 50.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 27.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 97.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 72.23 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 1.77 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 33.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 43.77 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 24.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 20.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 479.53 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 3.44 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 279.88 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1799885 | Primary Facility | 2009-04-29 | Routine/Complete Inspection | No Violations Noted | |
1852433 | Primary Facility | 2009-12-02 | Routine/Complete Inspection | No Violations Noted | |
1855904 | Primary Facility | 2010-01-07 | Drilling/Alteration | No Violations Noted | I arrived on site at 10:30 am. I met with the Company Man on site - Lowell Angelette. The drill rig on site is H&P Flex Rig 290. Surface casing is set at 1504' and cemented with 15 bbls returned to surface. At time of inspection, drilling depth was at 3782'. Drilling on air 8-3/4" hole to TD and then will be setting 5-1/2" production casing. This is a vertical Marcellus well. Drillers log was on site and up to date. BOP's were in place and tested. Reserve pit had approximately 8' of freeboard and liner appeared to be in good condition. Secondary containment was in place around substructure and equipment on location. |
1884485 | Primary Facility | 2010-01-05 | Routine/Complete Inspection | No Violations Noted | |
1956726 | Primary Facility | 2011-03-05 | Routine/Complete Inspection | Violation(s) Noted | |
1972915 | Primary Facility | 2011-05-12 | Follow-up Inspection | No Violations Noted | |
2012681 | Primary Facility | 2011-10-19 | Routine/Complete Inspection | No Violations Noted | DEP on site 12:50. Well is in production. No activity on site. Vents are open. Well tag is present. No violations observed. |
2438151 | Primary Facility | 2015-12-31 | Site Restoration | No Violations Noted | The Department was on site to conduct a Notice of Termination (NOT) for the Chudleigh W P1 well site (5809802). The wells associated with this site are as follows: |
2601267 | Primary Facility | 2017-06-06 | Administrative/File Review | No Violations Noted | |
2662518 | Primary Facility | 2017-11-17 | Routine/Complete Inspection | No Violations Noted | This inspection is related to e-Facts Inspection ID: 2662496. There was no activity at the time of the inspection. There were no violations noted. If you have any questions, please contact me. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1956726 | 606426 | 03/05/2011 | 2011-03-05 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1956726 | 606427 | 03/05/2011 | 2011-03-05 | 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. | Administrative |
For data sources see[8]