Well ID: 37-115-20019 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.733889,"lon":-75.876964,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 147522 | |
Farm/Lease Name: GESFORD 3 | |
License Status: | |
Spud Date: | |
Permit Date: 2007-12-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.733889 | |
Longitude: -75.876964 |
Date | Event |
---|---|
2007-12-18 | New Permit Application |
2008-10-13 | Performed Spud Operation |
2008-12-17 | Drilling Completion |
2009-03-07 | Drilling Completion |
2009-03-20 | Perforation |
2009-03-20 | Performed Stimulation |
2009-09-23 | NEWLY DRILLED |
2010-10-01 | DRILLED DEEPER |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2009-03-20 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | 1112149.00 | 248 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 40,755.50 | 128 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | Fracking Fluid | 4,070.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 357.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,925.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1713883 | Primary Facility | 2008-06-03 | Routine/Complete Inspection | Violation(s) Noted | |
1716879 | Primary Facility | 2008-06-26 | Routine/Complete Inspection | No Violations Noted | |
1755685 | Primary Facility | 2008-12-10 | Drilling/Alteration | No Violations Noted | |
1761026 | Primary Facility | 2008-01-05 | Routine/Complete Inspection | No Violations Noted | |
1761486 | Primary Facility | 2009-01-08 | Routine/Complete Inspection | No Violations Noted | |
1764240 | Primary Facility | 2009-01-20 | Drilling/Alteration | No Violations Noted | |
1765492 | Primary Facility | 2009-01-26 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
1765496 | Primary Facility | 2009-01-27 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
1769267 | Primary Facility | 2009-02-02 | Routine/Complete Inspection | No Violations Noted | |
1770595 | Primary Facility | 2009-02-18 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
1772832 | Primary Facility | 2009-02-25 | Drilling/Alteration | No Violations Noted | |
1774162 | Primary Facility | 2009-03-05 | Routine/Complete Inspection | No Violations Noted | |
1774906 | Primary Facility | 2009-02-18 | Administrative/File Review | Violation(s) Noted | |
1774920 | Primary Facility | 2009-02-18 | Administrative/File Review | Violation(s) Noted | |
1775801 | Primary Facility | 2009-03-12 | Drilling/Alteration | No Violations Noted | |
1796704 | Primary Facility | 2009-04-27 | Routine/Complete Inspection | No Violations Noted | |
1796715 | Primary Facility | 2009-05-05 | Routine/Complete Inspection | Violation(s) Noted | 78.86 defective casing or cementing, 78.81(a)(2) failure to prevent migration of gas or other fluids into sources of fresh groundwater, O&G Act 601.201(f) failure to submit written notice of intent to plug well or amend plat. MBC 5/20/09 |
1799622 | Primary Facility | 2008-12-08 | Routine/Complete Inspection | Violation(s) Noted | |
1799633 | Primary Facility | 2008-12-16 | Compliance Evaluation | No Violations Noted | |
1799916 | Primary Facility | 2009-05-01 | Routine/Complete Inspection | No Violations Noted | |
1833415 | Primary Facility | 2009-09-25 | Follow-up Inspection | No Violations Noted | An existing road was used to access the well site. The road and drill pad are stoned with limestone. The Site ID sign and E/S Plan were present at the entrance of the access road. At the time of inspection, there was no drilling activity on site. |
1835390 | Primary Facility | 2009-10-14 | Follow-up Inspection | No Violations Noted | At the time of inspection, there was no drilling activity on site. The inspection was completed as a follow up of a previous inspection performed on 9/25/09 where gas seepage was observed in the cellar of the well. During this inspection, there was only a couple of inches of water on the floor of the cellar. Bubbling was observed coming to the surface around the 16" conductor. |
1845067 | Primary Facility | 2009-11-10 | Follow-up Inspection | No Violations Noted | I inspected the well head for evidence of leakage. There was standing water present in the cellar. Visible bubbling was observed along the outside of the conductor. Due to the level of water in the cellar, it could not be determined where the leakage was coming from. The well is currently on-line. |
1868929 | Primary Facility | 2010-03-08 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
1876536 | Primary Facility | 2010-04-13 | Follow-up Inspection | No Violations Noted | I inspected the well head for evidence of leakage. There was standing water present in the cellar. Visible bubbling was observed coming out of the end of the 9-5/8" vent which was submersed. Bubbling was also observed coming up to surface along the outside of the 9-5/8" casing. Due to the water level in the cellar, it could not be determined where the bubbling was originating from (between 9-5/8" and conductor or outside conductor). The well was shut in and taken offline. A new well head has been placed on the well. Gas readings were collected using a Model 60 gas meter. No readings were detected. |
1879790 | Primary Facility | 2010-04-25 | Drilling/Alteration | No Violations Noted | Met with Brice Jankura DEP, Doug Gosnell- Cabot, and Mark Howard - Boots and Coots. GDS 15 rigged up over GEsford 3. TIH and getting ready to pump first cement plug from TD 6968 back to @5100'. Then will let sit for 24 hrs. Rig will then be skidded over to Gesford 9 to set 2nd plug from 850 to 862. Bubbling still present in both cellars (Gesford 3 and 9) and time of inspection. |
1879804 | Primary Facility | 2010-04-26 | Drilling/Alteration | No Violations Noted | Co. man on site John Crawford. i met with Doug Gosnell and Mark Howard.Gesford 3 was reported to have 0 lbs pressure on the 4" casing. The 7"x4" Annulus was holding 110 lbs. |
1879824 | Primary Facility | 2010-04-27 | Drilling/Alteration | No Violations Noted | Co. man on site John Crawford. i met with Doug Gosnell and Mark Howard. Tagged TOC in Gesford 3 @ 5045. At time of inspection crew TOH after setting second cement plug from 4000' to 5035'. Superior well services on site providing cement work. Cement being used has 1.26 yield and 15.2 lbs/gal. I requested information on compressive strength of the blend of cement being used. |
1881306 | Primary Facility | 2010-04-29 | Drilling/Alteration | No Violations Noted | Bubbling present in cellar. per'd 4 1/2" casing 1680-1682'. pumped 2 1/2 bbls into backside. TOH and circulated clean. WOC to cure. Superior providing cementing services. |
1881355 | Primary Facility | 2010-04-30 | Drilling/Alteration | No Violations Noted | GDS Rig 15 set up on well. plugging activities temporarily on hole until cement is delivered to site. |
1881358 | Primary Facility | 2010-05-03 | Drilling/Alteration | No Violations Noted | Doug Gosnell provided update of activities over weekend. 5/1 perf'd 1500-1502'. rigged up pump truck and after 30bbls able to pump 1/2 bbl/min at 1600 lbs. Set cement retainer at 1485'. TIH with tubing and now waiting on cement to be delivered to site. |
1883220 | Primary Facility | 2010-05-05 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | GDS-15 rig on well. Microfine cement delivered to site on 5/4/10. Squeezed in 2 bbls into perforations behind 4 1/2" casing with 1600 psi. i bbl was left above cement retainer. Crew tried to pull 4 1/2" casing and was not successful. At time of inspection, crew was on standby. During inspection gurgling was heard in cellar of well. |
1883228 | Primary Facility | 2010-05-06 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Running injection rate test to determine injection rate on 4" casing. Perforations have been made in the 4" with 8H/1320-1322' (kb) with TAG Gun. A cement retainer was set at 1295'. Crews TIH with tubing and tried to pump in 3 bbls of water with 15% acetic acid. While on site, injections tests were completed. Basd on the initial injection tests, the formation was not taking any cement. Additional attempts to squeeze cement will be made. |
1883276 | Primary Facility | 2010-05-06 | Drilling/Alteration | No Violations Noted | I Met with Mark Howard of Boots n Coots and Art Stewart from Cabot on the site. GDS Rig 15 is rigged up over well and Superior Well Services was providing cement and pumping services. Mr. Howard stated that the 7" and 4 1/2" casings had been cut at 900'. Two series of injection tests had been performed using freshwater and 15% acetic acid. As I arived on site, they were in the middle of another attempt to squeeze in cement. The crew tripped in hole with tubing and pumped in 3.2 bbls of cement in tubing. With 800lbs of pressure, they were able to pump in 1.3 bbls of cement through the cut section of pipe. Approximately 90' of cement was left above retainer. Mr. Howard mentioned that a pressure gauge and a Barton recorder set up on the 7" x 4 1/2" annulus have showed 0 psi consistently for the past two days with no change. A gauge was also installed on the bull plug on the 9 5/8" x 13 3/8" annulus. Crew will be waiting on cement 24 hrs before resuming plugging activities. |
1886412 | Primary Facility | 2010-05-24 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | At the time of inspection I met with Mark Howard of Boots and Coots who has been overseeing plugging activities for Cabot. Mr. Howard summarized the recent activities. The 7" and 9 5/8" casings were mechanically cut at 300'. An injection rate could not be established at this depth, and therefore no cement was squeezed into the formation. Cement was spotted at 300', and top of cement was tagged at 238'. The top of the 7" casing was cut approximately 1-2" below the top of the 9 5/8" casing. The remaining open sections of casings were then filled to surface with gravel. A metal plate was welded on top of the 9 5/8" casing with a 2" port. A 2" riser with a bull plug and needle valve was screwed into the metal plate. A section of 4 1/2" casing was welded to the well extending approximately 4' above surface. A metal plate containing the well permit number was welded to the top of the 4 1/2" riser. Mr. Howard reported the plugging activities on this well were completed at approximately 18:30 pm on 5/23/10. |
1886581 | Primary Facility | 2010-05-18 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mark Howard, Art Stewart on site. GDS Rig 15. A balanced plug was set at 350' to 425'. Pressured up the 7" with 300 lbs and had 0 psi on the 9 5/8 x 7" annulus. Pressrue bled down two times to 90 psi on 7". pressured up to 300 lbs a third time and let sit overnight. Gauge reading in the morning was 90 psi. Have established no injection rate into cut. Today plan to mechanically cut 7" and 9 5/8" casing at 300' and try to squeeze cement in at that depth. |
1887831 | Primary Facility | 2010-05-27 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | At the time of inspection, there was no activity on site. All drilling equipment has been mobilized off location. The cellar of the well had approximately 1¿ of standing water. Intermittent bubbling was observed on the outside of the 9-5/8¿ casing. This bubbling occurred approximately every 30 seconds to 1 minute and consisted of several bubbles at each time. This bubbling was observed to be southwest of the wellhead. Minor bubbling was also observed on the northern side of the well head and appeared to be coming from the welded plate on the 9 5/8¿ casing. The exact source of the bubbling in this area, however, could not be clearly determined given the depth of the cellar and cloudiness of the water. A 100 lb pressure gauge installed on the 2¿ riser connected to the 9 5/8¿ casing showed 0 psi at the time of inspection. DEP collected a video of the conditions of the wellhead during this inspection. |
1887832 | Primary Facility | 2010-05-28 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | At the time of inspection I met with Bill Shreve of Cabot. The standing water had been removed from the cellar, exposing the 20¿ and 13 3/8¿ casings. Upon inspection, it was determined that the intermittent bubbling observed during previous inspections, was coming from in between the 20¿ conductor and 13 3/8¿ casing. The bubbling continued to be intermitted with several bubbles coming to surface about once every 30 seconds to 1 minute. The bubbling observed the previous day on the northern side of the well head was no longer present. A soapy water mixture was introduced around the well head and casings. During the time of inspection, there was no evidence of bubbling on the northern side of the casing. DEP collected a video of the conditions of the well head at the time of inspection. |
1890884 | Primary Facility | 2010-06-08 | Routine/Complete Inspection | No Violations Noted | |
1891353 | Primary Facility | 2010-06-11 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | 4' of standing water in cellar with minor bubbling present. Arranged for GDS to pump down cellar to determine source of bubbling. Source appears to be from metal plate welded on 9 5/8" casing. Also see occasional bubbling come out in between 20" and 13 3/8" casings. Crew on site installing protective barriers around well. |
1917658 | Primary Facility | 2010-10-04 | Routine/Complete Inspection | No Violations Noted | Inspected well head for gas seepage. Well has been plugged. Monument in place with API #. No evidence of gas observed during inspection. Cellar is open and full of water. No activity on site. |
1959368 | Primary Facility | 2011-03-22 | Routine/Complete Inspection | Violation(s) Noted | |
1976052 | Primary Facility | 2011-05-25 | Follow-up Inspection | No Violations Noted | |
2430034 | Primary Facility | 2015-12-04 | Site Restoration | No Violations Noted | |
2430035 | Primary Facility | 2015-12-04 | Site Restoration | No Violations Noted | |
2481734 | Primary Facility | 2016-04-26 | Routine/Partial Inspection | No Violations Noted | The Department was on site at the Gesford, K. Pad 3 to conduct a Routine Partial Inspection. The E&S Inspection Log indicated that Mike Brilla (TEC) conducted a PCSM inspection on 3/7/16. At the time of the inspection, the site appeared to meet temporary stabilization requirements. |
2625967 | Primary Facility | 2017-08-16 | Routine/Complete Inspection | No Violations Noted | The Gesford K3 pad was well vegetated, including the majority of the pad surface and the cut and fill slopes. The access road was solid and stable. There was no bubbling in the well cellars. Agricultural activity was ongoing around the well site with some wrapped round bales being stored on the corner of the site.
There were no violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1713883 | 541432 | 06/03/2008 | 2008-06-03 | 102.4NOPLAN - No E&S plan developed, plan not on site | Administrative | |
1774906 | 558000 | 02/18/2009 | 2009-02-18 | 212WELLRCD - Failure to submit well record within 30 days of completion of drilling | Administrative | |
1774920 | 558011 | 02/18/2009 | 2009-02-18 | 78.124 - Failure to submit plugging certificate 30 days after well plugged | Administrative | Gesford 3A plug and skid |
1796715 | 562510 | 05/05/2009 | 2009-05-05 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative | 78.86 defective casing or cementing. MBC 5/20/09 |
1796715 | 563107 | 05/05/2009 | 2009-05-05 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | 78.81(a)(2) failure to prevent migration of gas or other fluids into sources of fresh groundwater. MBC 5/20/09 |
1796715 | 563108 | 05/05/2009 | 2009-05-05 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | O&G Act 601.201(f) failure to submit written notice of intent to plug well or amend plat. MBC 5/20/09 |
1799622 | 563394 | 12/08/2008 | 2008-12-08 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1959368 | 607157 | 03/22/2011 | 2011-03-22 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1959368 | 607158 | 03/22/2011 | 2011-03-22 | 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
541432 | 235104 | NOV - Notice of Violation | Comply/Closed | 2008-06-26 | |||
558000 | 244244 | NOV - Notice of Violation | Superseded | 2010-04-15 | |||
558000 | 252129 | COA - Consent Order and Agreement | Superseded | 2010-04-15 | $120,000.00 | $120,000.00 | |
558011 | 244244 | NOV - Notice of Violation | Superseded | 2010-04-15 | |||
558011 | 252129 | COA - Consent Order and Agreement | Superseded | 2010-04-15 | $120,000.00 | $120,000.00 | |
562510 | 246043 | NOV - Notice of Violation | Superseded | 2009-11-04 | |||
562510 | 252129 | COA - Consent Order and Agreement | Superseded | 2010-04-15 | $120,000.00 | $120,000.00 | |
563107 | 246043 | NOV - Notice of Violation | Superseded | 2009-11-04 | |||
563107 | 252129 | COA - Consent Order and Agreement | Superseded | 2010-04-15 | $120,000.00 | $120,000.00 | |
563108 | 246043 | NOV - Notice of Violation | Superseded | 2009-11-04 | |||
563108 | 252129 | COA - Consent Order and Agreement | Superseded | 2010-04-15 | $120,000.00 | $120,000.00 |