Well Details

Well ID: 37-113-20359
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Cherry Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 149614
Farm/Lease Name: YONKIN UNIT 3H
License Status:
Spud Date:
Permit Date: 2016-08-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.545869
Longitude: -76.426919

For data sources see[1][2][3]

Well History

Date Event
2016-08-17 New Permit Application
2016-10-07 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-05-07 2017-05-12 7,626 5,822,920 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 EC6486A Nalco Champion Scale Inhibitor Listed Below
Sand Sargent/Unimin Proppant Listed Below
Water Chief Oil and Gas Carrier/Base Fluid Listed Below
Water 7732-18-5 80 0.02014 11436
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.0033 1871
Ethoxylated (C10-16) alcohols 68002-97-1 35 0.00005000 30
Acetophenone 98-86-2 1 0.00001000 1
Water 7732-18-5 100 85.5815 48,592,300.0
Crystallilne silica 14808-60-7 100 14.144 8,030,800.0
Glutaraldehyde 111-30-8 5 0.00126 715
Quaternary ammonium compound 68424-85-1 10 0.00252 1429
Water 7732-18-5 40 0.00221 1252
Ethanol, 2,2',2"-nitrilotris-,
tris(dihydrogen phosphate) (ester), sodium salt
68171-29-9 30 0.00165 939
Ammonium acetate 631-61-8 13 0.00857 4865
Ethanol 64-17-5 5 0.00126 715
Methanol 67-56-1 5 0.00001000 4
Ethoxylated (C10-16) alcohols 68002-97-1 5 0.0033 1871
Ethylene glycol 107-21-1 30 0.00165 939
Distillate, petroleum, hydrotreated, light 64742-47-8 30 0.01977 11226
Water 7732-18-5 85 0.15111 85800
Diethylene glycol mono-n-butyl ether 112-34-5 60 0.00009000 51
Thiourea 62-56-6 1 0.00001000 1
Alcohols, C12-14, ethoxylated 68439-50-9 5 0.0033 1871
Formaldehyde 50-00-0 1 0.00001000 1
Hydrochloric acid 7647-01-0 15 0.02667 15141
Unihib G GeoSafe Acid Inhibitor Listed Below
Hydrochloric Acid PVS Acidizing Listed Below
BIOC11219A Nalco Champion Biocide Listed Below
Unislick ST-50 CESI Chemical Friction Reducer Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 2,378,965.54 221 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 1,640,915.07 361 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 1,098,624.53 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CHIEF OIL & GAS LLC Drilling Fluid Waste 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CHIEF OIL & GAS LLC Drill Cuttings 587.61 Tons LANDFILL 301358
2017 CHIEF OIL & GAS LLC Drill Cuttings 373.62 Tons LANDFILL 301358
2017 CHIEF OIL & GAS LLC Produced Fluid 3,085.42 Bbl REUSE (AT WELL PAD)
2017 CHIEF OIL & GAS LLC Produced Fluid 300.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CHIEF OIL & GAS LLC Produced Fluid 515.13 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 321.88 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2539066 Primary Facility 2016-11-22 Drilling/Alteration No Violations Noted Arrived at 10:00, weather cold and windy. Met with company man Brandon Jesson. Top-hole rig onsite. Drilled to 1540’ and wwere getting ready to set intermediate casing at 1521’ at the time of my inspection. Surface casing was set at 501’, cement job went well. 505 sks of cement, with 20 bbls of good cement back to surface. Will move over to the Yonkin 1H after the 3H is top holed. Left location @ 11:15.
2544455 Primary Facility 2016-12-13 Routine/Partial Inspection No Violations Noted Routine inspection to assess overall site conditions. Approximately 3-4 inches of snow cover is present over the entire site. No Chesapeake representatives were present.

An air-drill rig has just been removed from the site, and the containment for the drilling activities is in place. No evidence of spill such as staining or odors was observed. Due to cold weather and snow cover, direct observation of the entire well pad surface was not possible. Puddles on the pad surface were frozen, so no screening of electrical conductivity was completed.

No violations were cited during this inspection.

2559335 Primary Facility 2017-02-06 Routine/Complete Inspection No Violations Noted Routine inspection to assess site conditions during drilling operations. Mark Calicutt of Chief was the company man on site.

No evidence of releases such as odors, sheens, or staining was observed. Five barrels were observed being stored outside of containment. I mentioned these to Mr. Calicutt who stated they would be moved to containment immediately. All other chemicals, materials and equipment on site were being stored within containment.

No violations were issued during this inspection.

2559586 Primary Facility 2017-02-06 Drilling/Alteration No Violations Noted
2559623 Primary Facility 2017-02-06 Drilling/Alteration No Violations Noted Arrived at 12:00. Weather: sunny, temperatures in mid-thirties. Precision 569 rig on site. Met with company man Mark Calicutt, drill at 11,760’ and just finishing drilling to TD. Progress over the weekend slowed by lost circulation. Previous well had similar issues. Driller’s log mentioned minor gas show at 4000’. Plan is to set production casing and cement, then move to Yonkin 1H. Left location @ 13:00.
2564806 Primary Facility 2017-02-24 Routine/Complete Inspection No Violations Noted Inspection to assess site conditions after drilling operations. No violations cited.
2582003 Primary Facility 2017-04-12 Routine/Complete Inspection No Violations Noted Three wells drilled and one in production phase(2H). One separator within plastic containment. At least detecting from production equipment. The plastic liner and felt remain on location.
2784699 Primary Facility 2018-10-03 Routine/Complete Inspection No Violations Noted Arrived onsite for a routine site inspection. The pad has been been reduced in size and the site exceeds 70% vegetative cover.

There are 3 properly tagged Marcellus wells staged for production. There are also 3 produced water tanks and 3 GPUs onsite and in secondary containment.

At the time of inspection it was observed that a white storage container plumbed to a well head was missing a cap (Photo #4). It is recommended that this cap be replaced to prevent rainwater from entering the container and possibly causing it to overflow.

No violations noted.