37-113-20348

Well Details

Well ID: 37-113-20348
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Forks Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 153153
Farm/Lease Name: WARBURTON NORTH UNIT 1H
License Status:
Spud Date: 2015-11-13
Permit Date: 2015-10-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.542039
Longitude: -76.533111

For data sources see[1][2][3]

Well History

Date Event
2015-10-15 New Permit Application
2015-11-13 Performed Spud Operation
2015-12-06 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-07-01 2016-07-08 7,970 7,832,540 0
2 2016-03-16 2016-03-20 7,659 7,820,360

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Bactron K-139 Nalco Champion Biocide Listed Below
Sand Sargent/Unimin Proppant Listed Below
EC6486A Nalco Champion Scale Inhibitor Listed Below
Unislick ST-50 CESI Chemical Friction Reducer Listed Below
Water Chief Oil & Gas Carrier/Base Fluid Listed Below
Hydrochloric Acid (15%) PVS Acidizing Listed Below
Water 7732-18-5 100 86.5374 65,362,500.0
Water 7732-18-5 40 0.0022 1658
Ethoxylated (C10-16) alcohols 68002-97-1 35 0.00006000 46
Ethylene glycol 107-21-1 30 0.00165 1244
Water 7732-18-5 85 0.17466 131925
Alcohols, C12-14, ethoxylated 68439-50-9 5 0.00347 2618
Crystallilne silica 14808-60-7 100 13.1566 9,937,300.0
Distillate, petroleum, hydrotreated, light 64742-47-8 30 0.0208 15710
Hydrochloric acid 7647-01-0 15 0.03082 23281
Ethanol 64-17-5 5 0.00127 962
Alcohols, (C10-16), ethoxylated 68002-97-1 5 0.00347 2618
Methanol 67-56-1 5 0.00001000 7
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.00347 2618
Quaternary ammonium compound 68424-85-1 10 0.00255 1924
Acetophenone 98-86-2 1 0.00000100 1
Thiourea 62-56-6 1 0.00000100 1
Glutaraldehyde 111-30-8 5 0.00127 962
Formaldehyde 50-00-0 1 0.00000100 1
Triethanolamine Tri 68171-29-9 30 0.00165 1244
Water 7732-18-5 80 0.02038 15395
Short Chained Glycol Ether 112-34-5 60 0.0001 79
Ammonium acetate 631-61-8 13 0.00901 6808
Unihib G GeoSafe Acid Inhibitor Listed Below
2 Hydrochloric Acid (15%) PVS Acidizing Hydrochloric Acid 7647-01-0 15 0.0182 13995
Water 7732-18-5 85 0.10312 79304
EC6486A Nalco Champion Scale Inhibitor Triethanolamine Tri 68171-29-9 30 0.00168 1289
Ethylene Glycol 107-21-1 30 0.00168 1289
Water 7732-18-5 40 0.00223 1718
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Alcohols, ethoxylated 68551-12-2 5 0.00297 2282
Alcohols, ethoxylated 68439-50-9 5 0.00297 2282
Ammonium acetate 631-61-8 13 0.00772 5934
Petroleum distillates, hydrotreated light 64742-47-8 30 0.01781 13693
Alcohols, ethoxylated 68002-97-1 5 0.00297 2282
Water 7732-18-5 42 0.00223 1718
Bactron K-219 Nalco Champion Biocide Methanol 67-56-1 40 0.0112 8616
Quarternary Ammonium Compounds 68424-85-1 20 0.0056 4308
Water 7732-18-5 30 0.0084 6462
Gluteraldehyde 111-30-8 10 0.0028 2154
Water Chief Oil & Gas Base Fluid Water 7732-18-5 100 84.8593 65,260,900.0
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Acetophenone 98-86-2 1 0.00000100 1
Ethoxylated alcohol 68002-97-1 35 0.00004000 27
Short Chained Glycol Ether 112-34-5 60 0.00006000 46
Formaldehyde 50-00-0 1 0.00000100 1
Thiourea 62-56-6 1 0.00000100 1
Methanol 67-56-1 5 0.00001000 4
Sand Sargent/Unimin Proppant Silica Substrate 14808-60-7 100 14.9264 11,479,100.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 1,324,505.08 206 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 1,390,557.07 357 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 1,083,740.96 363 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 953,480.03 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CHIEF OIL & GAS LLC Drill Cuttings 1,227.83 Tons LANDFILL 301358
2015 CHIEF OIL & GAS LLC Drilling Fluid Waste 440.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 CHIEF OIL & GAS LLC Drilling Fluid Waste 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2015 CHIEF OIL & GAS LLC Drilling Fluid Waste 210.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CHIEF OIL & GAS LLC Fracturing Fluid Waste 360.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CHIEF OIL & GAS LLC Fracturing Fluid Waste 5,303.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Produced Fluid 9,710.85 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 217.92 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 CHIEF OIL & GAS LLC Produced Fluid 1,231.09 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Produced Fluid 427.66 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 269.81 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 96.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2418292 Primary Facility 2015-10-21 Routine/Partial Inspection No Violations Noted Construction of the access road is underway. Erosion and sediment control BMPs are in place and in good repair. Temporary stabilization is in place. No signs of accelerated erosion or sedimentatio nwere observed.
2424241 Primary Facility 2015-11-12 Preoperation Inspection No Violations Noted Preoperational inspection conducted at Chief's request in preparation for spudding. E&S controls installed as permitted. Erosion control matting in place as temporary stabilization.
2425921 Primary Facility 2015-11-18 Routine/Complete Inspection No Violations Noted Arrived @ 11:58, weather cloudy, cold and windy. Patterson 254 was rigging up. I met with Billy Swanson (Chief Company Man). The drilling program was not available available at the time of inspection.
2426635 Primary Facility 2015-11-20 Routine/Complete Inspection No Violations Noted Routine inspection conducted to review site conditons during rig set up. Chief representative Bill Swanson on site.
2427862 Primary Facility 2015-11-24 Drilling/Alteration No Violations Noted Arrived 10:30, cloudy and cold. Met with Billy Swanson (Co. Man). At the time of inspection drilling depth was 1540', this will be the set depth for the intermediate casing. Crew from Warrior were preparing to run a CBL on the surface casing. Surface cement job went well with 25 bbls back to surface. No violations at the time of inspection. Left locatoin @ 11:10.
2428380 Primary Facility 2015-11-30 Drilling/Alteration No Violations Noted Arrived at 12:00, weather cold and cloudy with some sun. Patterson 254 was preparing to build the curve. Company man Billy Swanson was at the nearby Hart pad at the time of my inspection. Walked the pad and noted that drilling chemicals were on containment. Left to go to the Hart pad location at 12:30.
2428765 Primary Facility 2015-12-01 Routine/Complete Inspection No Violations Noted Routine inspection conducted to review site conditons during drilling. Primary and secondary containments were in place in the rig work area. No evidence of spills within the containment was observed. Containment was in place around light plants, generators, and storage tanks situated outside of the rig work area. No evidence of spills within the containment was observed.
2429384 Primary Facility 2015-12-02 Plugging(Includes Plugged/Mined Through) No Violations Noted Arrived @ 11:17. Weather: rain. Met with company man Paul Rico who arrived yesterday. Patterson 254 at 8795’, landed the curve at ¿ 3:30. No violations at the time of inspection. Left location @ 13:17.
2431961 Primary Facility 2015-12-10 Routine/Complete Inspection No Violations Noted Routine inspection conducted to review site conditons after drilling. Crews are on site completing the remainder of rig-down tasks. The well pad surface was visually screened for signs of spills such as staining; no suspect areas were identified. Erosion and sediment controls for the site are in place and in good repair. No evidence of accelerated erosion or sedimentation was observed.
2444103 Primary Facility 2016-01-25 Routine/Complete Inspection No Violations Noted Arrived @ 12:30. Weather: cold, cloudy. There was one TD-ed well on location with a night cap in place and concrete barriers around the well area. There was gravel in the cellar. The top of the gravel was about 2’ below the lip. 17. Annular vents were plumbed into a 500-gallon poly tank. The polytank vent was monitored with an Altair 5X gas meter calibrated on 1/20/16. No methane was detected. There were no violations at this time. Left location @ 13:00.
2464843 Primary Facility 2016-03-15 Routine/Complete Inspection No Violations Noted Equipment is being set up for well stimulation. Containment was in place in the area surrounding the well head and under the sand tanks, pump trucks, and other equipment. Smaller containment units were in place under vehicles and other equipment. Two vaccuum units were in place for use in removing water and fluids from the containment during the stimulation process.

Temporary erosion and sediment controls on site were in good repair. No evidence of accelerated erosion or sedimentation was observed.

No violations were cited during this inspection.

2464885 Primary Facility 2016-03-15 Routine/Complete Inspection No Violations Noted Arrived @ 11:20. Weather: cold, cloudy. Met with company man Justin Myers. The site is being prepared for fraccing. Universal is doing the frac with Cased Hole Solutions handling the wire line. Plan to begin fraccing operations on 3/16/16. Operations should continue for ¿ 5 days. On 3/13/16 did run-in with coiled tubing rig and toe frac. Sand trucks were arriving as I departed the site @ 12:20. No violations were observed at the time of my inspection.
2465850 Primary Facility 2016-03-18 Routine/Complete Inspection No Violations Noted All equipment and chemicals on site were located within containment, and no evidence of spilled materials was observed.

A loose piece of erosion control matting was observed on the berm of a sediment basin off of the southeast side of the well pad. This section of matting should be repaired.

No violations were cited during this inspection.

2466944 Primary Facility 2016-03-22 Routine/Complete Inspection No Violations Noted Routine inspection conducted to review site conditons and status of well stimulation. Crews were preparing to rig up a coil-tube drill rig for removing the plugs.

The electrical conductance of pussles on the pad surface was screened using an Oakton PCtestr handheld probe. The puddle contucctance ranged from 550 - 1,700 umhos/cm.

Appropriate containment was in place under equipment and surrounding the well head.

The loose piece of erosion control matting observed during the March 18, 2016 inspection (Insp. ID. Nos. 2465849 & 2465850) has not yet been repaired.

No violations were cited during this inspection.

2467619 Primary Facility 2016-03-17 Drilling/Alteration No Violations Noted Arrived @ 11:35. Weather: cold, cloudy. Fraccing was in progress at the time of my inspection. Met with company man Brett Fowler, also met Chief Completions Manger Bryce Yeager. Stage 5 was finished during my inspection. The duration for the stage was approximately 2.5 hours. The target parameter was the pump rate (90 bpm). There was a brief shut-down ¿ 1 hour into the frac due to a leak. Otherwise the stage went well. The frac will consist of 19 stages and should be done by Sunday night (3/20/16), according to Fowler. Current estimates for the timing of the flowback are 5-7 months – they are waiting on pipeline. Left location at 13:30.
2467640 Primary Facility 2016-03-21 Drilling/Alteration No Violations Noted Arrived @ 11:15. Weather: sunny. Met with Company man Gib Blevins. Coiled tubing rig was onsite and preparing to drill out plugs following completion of frac job. Pressure at the well head was ¿ 2000 psi, according to Blevins. Also onsite was DEP WQS Chris Yeakel. Took a lap around the location with Yeakel. Left @ 12:15.
2468778 Primary Facility 2016-03-28 Drilling/Alteration No Violations Noted Arrived @ 10:02. Weather: cloudy, following rain. Met with Greg Rohrer (Chief). Flowback began at 9:00, and 1225 psi well head pressure. Flowback is to prove gas and lock in lease, according to Greg. Will flowback at 45-50 bbls/hr until the well produces gas. Then will flare to prove gas. Entire job should take 2 to 5 days. Well head pressure 1125 psi @ 10:30. Also onsite were crew with Oil States. There were no violations at the time of my inspection.
2468825 Primary Facility 2016-03-29 Drilling/Alteration No Violations Noted Arrived @ 10:04. Weather: Sunny, windy. Flowing back,conditions steady since yesterday. Oil States crew onsite were monitoring the flowback, and vaccing out water on containment. Left location @ 10:20. There were no violations observed at the time of my inspection.
2473188 Primary Facility 2016-03-29 Routine/Complete Inspection No Violations Noted Arrived @ 9:24. Weather: rain, heavy at times. Well had been previously flowed back from 3/28/16 for approximately 3 days. Crew members were removing liner and cleaning up. Annular vents were plumbed to a 330-gallon polytank. Left location @ 09:40.
2558094 Primary Facility 2017-01-25 Routine/Complete Inspection No Violations Noted Arrived @ 12:40. Weather: cloudy, warm, snow on location. No personnel onsite. The Warburton N 1H is in production. Cellar water-filled, no bubbles.

Top gauge: 900 psi (0-5000 anal) 5-1/2”: 1100 psi (0-5000 anal) Annular vents plumbed to polytank. Left location @ 1:15

2563173 Primary Facility 2017-02-21 Routine/Complete Inspection No Violations Noted No violations cited.
2782342 Primary Facility 2018-09-28 Site Restoration No Violations Noted Chief Oil & Gas submitted a Notice of Termination (NOT) for the Warburton North Unit pad covered under ESG 29-113-15-0005. The NOT was received by the Department on 9/19/18.

There is 1 properly tagged Marcellus well staged for production. There is also one each produced water tank and GPU onsite and in secondary containment.

There are 2 infiltration basins serving as PCSM BMPs. Both appear to have been constructed according to plans and functioning properly. Overall the site is >70% vegetative cover. However, some slopes near the access road are bare (Photos #4, 11).

Due to recent rainfall over the previous days the produced water tank secondary containment was appox. 50% full with water (Photo #9). The GPU secondary containment was almost over topped by rainwater (Photo #10).

The department recommends returning the NOT and resubmitting after the areas of the pad near the access road have been reseeded and vegetation is better established.

2791425 Primary Facility 2018-10-18 Administrative/File Review Violation(s) Noted Administrative Inspection created to cite a violation against a well in which Chief entered the wellbore less than eight hours after cementing the casing. This inspection/violation is part of a CACP found under Enforcement Record ID #368514.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2791425 831080 2018-10-18 2018-10-18 78a85(c)4 Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
831080 368514 CACP - Consent Assessment of Civil Penalty COMP - Completed 2018-10-18 2018-10-18 $220,000.00 $220,000.00

For data sources see[8]