37-113-20102

Well Details

Well ID: 37-113-20102
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Fox Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 150919
Farm/Lease Name: KUZIAK UNIT 1H
License Status:
Spud Date: 2011-08-04
Permit Date: 2011-04-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.559722
Longitude: -76.705917

For data sources see[1][2][3]

Well History

Date Event
2011-04-15 New Permit Application
2011-08-04 Performed Spud Operation
2011-09-17 Drilling Completion
2011-11-07 Perforation
2012-04-27 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-11-14 2011-11-14 7,185 979,062
2 2012-12-12 2012-12-12 7,185 4,143,300

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KR-153SL Superior Well Services Biocide
Diethylene glycol 111-46-6
Polyethylene glycol 25322-68-3 5000.00
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.02
Ethylene glycol 107-21-1 100.00
WFR-3B Superior Well Services Friction Reducer Ethoxylated C12-16 alcohols 68551-12-2 4.00
1,2-Propylene glycol 57-55-6 25.00
Distillates, petroleum, hydrotreated light 64742-47-8 0.14
Stoddard solvent 8052-41-3 10.00
Super Scale Control TSC Superior Well Services Scale Inhibitor 1,2,4-Butanetricarboxylic acid, 2-phosphono- 37971-36-1
Anionic Polymer
Anionic Copolymer
1,2-Propylene glycol 57-55-6 0.04
Water Base Fluid Fresh Water 100.00 84.87
Sand (Proppant) Superior Well Services Propping Agent Quartz 14808-60-7 99.90 14.92
2 FRW-66 Halliburton Energy Services Friction Reducer Hydrotreated Light Distillate
64742-47-8
0.08
Sand (Proppant) Halliburton Energy Services Propping Agent Quartz 14808-60-7 99.90 38.00
Hydrochloric Acid 28 Halliburton Energy Services Acid
Hydrochloric acid 7647-01-0 0.54
Water

7732-18-5 85
Biocide - Bactron K 139 Champion Technologies Biocide Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 10.00
Ethanol 64-17-5 5.00
Glutaraldehyde 111-30-8 5.00 0.04
Water Base Fluid Fresh Water 100.00 62.00
Gyptron T-390 Champion Technologies Scale Inhibitor
Gyptron T-390 Champion Technologies Halliburton Energy Services Scale Inhibitor
Methanol

67-56-1 10.00
0.01

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2012 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2013 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 880,140.00 172 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 384,833.09 309 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 262,565.45 325 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 128,909.85 287 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 82,886.71 313 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 6,641.78 52 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHIEF OIL & GAS LLC Drill Cuttings 1,949.77 Tons LANDFILL 301626
2013 CHIEF OIL & GAS LLC Fracing Fluid Waste 350.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013 CHIEF OIL & GAS LLC Fracing Fluid Waste 43.38 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC006
2013 CHIEF OIL & GAS LLC Fracing Fluid Waste 4,192.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Fracturing Fluid Waste 60.00 Tons RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Produced Fluid 5,736.43 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHIEF OIL & GAS LLC Produced Fluid 45.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 CHIEF OIL & GAS LLC Produced Fluid 3,238.28 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Produced Fluid 3,015.61 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 0.40 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 CHIEF OIL & GAS LLC Produced Fluid 1,005.88 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Produced Fluid 238.61 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 17.40 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1994972 Primary Facility 2011-08-09 Drilling/Alteration No Violations Noted UDI 207. rig moved in on location. Plan on running and cementing 13 3/8 Aug 12, 2011 AM.
1996013 Primary Facility 2011-08-15 Drilling/Alteration No Violations Noted Currently at 1421' UDI Rig 207. running dev survey.
1999112 Primary Facility 2011-08-19 Follow-up Inspection Viol(s) Noted & Immediately Corrected
2032961 Primary Facility 2012-01-10 Routine/Complete Inspection No Violations Noted
2045070 Primary Facility 2012-02-23 Routine/Complete Inspection No Violations Noted
2161466 Primary Facility 2013-04-25 Routine/Complete Inspection No Violations Noted
2363210 Primary Facility 2015-04-13 Routine/Complete Inspection No Violations Noted Arrived @ 11:50. There were two wells on the pad. The 1H was in production. At the 13-3/8” x 9-5/8” annulus there was 5% methane. I could not obtain a separate fiend reading at the 9-5/8” x 5-1/2” annulus. There was some staining immediately around the well cellar. The other well, the 7V, was capped. The cellar was partly water-filled with an oily-looking scum on top. Field readings were 0% methane for both the 13-3/8” x 8-5/8” annulus and 9-5/8” vent. Met Kevin Hadlock towards the end of my inspection. Left @12:30
2481105 Primary Facility 2016-05-04 Routine/Complete Inspection No Violations Noted The site currently has >70% coverage of perennial vegetation; temporary erosion and sediment control BMPs are still in place. No evidence of accelerated erosion or sedimentation was observed.

The electrical conductance of puddles was not screened due to the absence of puddles.

The Erosion and Sediment Control General Permit for this site expires on 06/17/2016. No current well permits exist. Chief has indicated that it plans to partially restore the well pad sometime in 2016. In order to remain in compliance with the Department's regulations regarding site restoration (Title 58 Pa. C.S. § 3216), Chief should obtain a new drilling permit or request a 2-year extension of time for site restoration.

No violations were cited during this inspection.

2499035 Primary Facility 2016-06-30 Routine/Complete Inspection Pending Well in production, compressor on site undergoing routine maintanence. Cellar water filled.

top gauge: 600 psi (0-2000 psi analog) 5-1/2": 600 psi 13" x 9": 74% methane.

2513652 Primary Facility 2016-08-04 Routine/Complete Inspection Violation(s) Noted Arrived @ 10:30. Weather: sunny, warm. No company representatives were present during the inspection. There were 2wells and a small compressor on the site. The Kuziak 1H was in production with artificial lift. This follow-up inspection was prompted by an Inactive Well Status application for Kuziak Unit 7V. Previously on 6/30/16, combustible gas was detected on the Kuziak Unit 1H well at the 13-3/8” x 9-5/8” annulus. Typically, the 1” , 13-3/8” x 9-5/8” annular vent T’s into the 2” 13-3/8” x 9-5/8” annular vent, allowing for cross-contamination. To eliminate that possibility in this follow-up inspection, the annuli were open and isolated from each other prior to my arrival on site. Monitoring was conducted with Altair 5X gas meter (calibrated: 7/26/16).

Kuziak 1H .13-3/8” x 9-5/8”: 17%/volume combustible gas, 9-5/8” x 5-1/2”: 9%/volume combustible gas. The combustible gas detected at the 13-3/8” x 9-5/8” annuli of the Kuziak 1H well is evidence of defective cement which is a violation of Title 25 §78.8

2556777 Primary Facility 2016-01-30 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess general conditions on site. No Chief representatives were present.

This site has been partially restored. The pad has been reduced in size, and much of the remaining area has been de-compacted and vegetated. Temporary erosion and sediment controls were in place around the perimeter of the site. No evidence of accelerated erosion or sedimentation was observed.

No violations were cited during this inspection.

2685693 Primary Facility 2018-01-23 Routine/Complete Inspection No Violations Noted One well staged for production phase. One well not staged for production. Two each sand and water separators. No leaks detected from production equipment. No violations noted.
2736447 Primary Facility 2018-06-01 Routine/Complete Inspection No Violations Noted One well staged for production phase. One water separator. No leaks detected from production equipment. No violations noted.
2788176 Primary Facility 2018-10-11 Routine/Complete Inspection No Violations Noted Chief Oil & Gas submitted a Notice of Termination (NOT) for the Kuziak pad covered under ESG29-113-18-0001. The NOT was received by the Department on 10/5/18.

It had rained throughout the day and during part of the inspections. Some small puddles had formed on the pad and had a conductivity below 100 µS/cm. The pad has been reduced in size and the majority is now vegetation. The areas of vegetation around the site were >70% cover. No E&S issues were observed.

There is 1 active well and 1 inactive well onsite. The well cellars were filled with water; no bubbling was observed. There is also 1 GPU, 1 compressor, and 2 steel produced water tanks onsite and in secondary containment. All containment appeared to be in good condition.

The PCSM measures consist of 1 infiltration berm near the southwest corner of the pad. The berm appeared to be installed and functioning as designed.

No violations noted.

The Department recommends acknowledging termination of coverage under ESG29-113-18-0001.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1999112 618861 08/19/2011 2011-08-19 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. Administrative
2513652 766750 2016-08-04 78.86 Environmental Health & Safety see description in admin.