Well ID: 37-105-21908 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.725924,"lon":-77.927838,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Potter | |
Municipality: Summit Township | |
Operator Name: JKLM ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: SWEDEN VALLEY 104-7V | |
License Status: | |
Spud Date: | |
Permit Date: 2018-01-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.725924 | |
Longitude: -77.927838 |
Date | Event |
---|---|
2018-01-22 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2684003 | Primary Facility | 2018-01-16 | Preoperation Inspection | No Violations Noted | A preconstruction meeting for the Sweden Valley Tank Farm (ESG29-105-17-0021), The Judson Hollow 302 Well Pad (ESG29-105-17-0011) and the Sweden Valley 104 Well Pad (ESG29105-17-0022) was conducted on 1/16/2018 @ 1100 hours. The preconstruction meeting was held at the JKLM Office located in Coudersport due to inclement weather. Present for the meeting was Jeff Long, JKLM and contractors ESK Inc. and JL Watts.
JKLM is awaiting approval of drilling permits for the Headwaters 104 Well Pad, therefore construction will most likely begin next week at the Sweden Valley Tank Farm. This site will be freshwater until a multi-use permit is obtained from the NCRO. All three ESCGP E&S control plans show Compost Filter Sock (CFS), but JKLM stated they will be using Wood Chip Filter Berms (WCFB). Please be aware WCFB are not approved for use in EV watersheds. Wood chip filter berms shall not be located in areas of concentrated flow or used to construct sediment traps or other impoundments. A 6" thick layer of compost sh |
2740265 | Primary Facility | 2018-06-12 | Preoperation Inspection | No Violations Noted | The DEP conducted a PREOP inspection of the JKLM Sweden valley 104 wells site located in Summit Township Potter County on June 12, 2018 at 1100 hrs. JKLM representative Jeff Long was present for the inspection. The weather was 68° sunny, 53% humidity, winds South at 13 mph.
No issues were observed. This inspection meets the requirements of 58 Pa. C.S. 3258 (a.1) regarding a "pre-operational inspection". I departed the site at 1245 hours. -ELN |
2767194 | Primary Facility | 2018-08-23 | Routine/Complete Inspection | No Violations Noted | The DEP conducted a ROUTINE inspection of the JKLM Sweden Valley 104 well pad on 8/23/2018 @1230 hours. The weather was 70 degrees, sunny, 58% humidity windys WNW 12 mph. The access road, well pad and containment were inspected.
The Falcon Drilling 38 super single rig is onsite batch drilling, the surface casing, 1st, and 2nd intermediate string casings, on the 1HU-5HU wells. The access road, well pad and containment were inspected. The pad-wide containment was holding fluid in some areas with a field measured conductivity of <200uS/cm. The corners of the containment appeared folded down, with the potential to be overtopped. Onsite JKLM personnel stated they were monitoring the corners and working on a solution. Puddles on the pad surface had a field measured conductivity of <500uS/cm. No violations are noted at this time. I departed the site at 1415 hours. |
2811916 | Primary Facility | 2018-12-07 | Routine/Complete Inspection | No Violations Noted | The Department of Environmental Protection (DEP) conducted a routine inspection of the JKLM Sweden Valley 104 well pad on 12/7/2018 @1115 hours. The weather was 23 degrees, overcast, 3-4" of snow was observed on the ground. Humidity 615 with winds WNW @12mph. Activity onsite consists of personnel removing the containment from the top hole rig activity, and placing it in onsite waste containers, in preparation for transition to the H&P flex rig.
No staining or melted spots were observed on the pad surface. No violations are noted at this time. I departed the site at 1225 hours. |
2822397 | Primary Facility | 2019-01-02 | Routine/Complete Inspection | No Violations Noted | The Department of Environmental Protection conducted a routine inspection of the JKLM Sweden Valley 104 Well Pad located in Summit Twp, Potter Co. on 1/2/2019 @1200 hours. The weather 32 degrees, cloudy, 78% humidity winds, S @5mph. The H&P 500 flex rig is onsite and is planning to drill 4 wells. Joe Huston, JKLM Company Man and Jared Jacobini, DEP WQS were present for the inspection.
Foam berms and garage was observed on the north fill slope and should be removed. No violations are noted at this time. We departed the site @ |