If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-105-21886 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.857401,"lon":-77.735113,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Potter | |
| Municipality: Ulysses Township | |
| Operator Name: JKLM ENERGY LLC | |
| Well Pad ID: | |
| Farm/Lease Name: HEADWATERS 146-1HU | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2017-06-07 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: Yes | |
| Latitude: 41.857401 | |
| Longitude: -77.735113 |
| Date | Event |
|---|---|
| 2017-06-07 | New Permit Application |
For data sources see[4]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2633924 | Primary Facility | 2017-09-06 | Routine/Partial Inspection | No Violations Noted | On 9/6/17 at 1228 hrs I attended a preconstruction meeting for the Headwaters 146 well site. JKLM representative, Jeff Long, J.L. Watts representative, John Watts, and New Growth Resources representative, Jim Fowler, were present. Penn E&R developed the Erosion and Sediment (E&S) control plan and J.L Watts is the construction contractor.
We reviewed the E&S drawing. Site drainage is to Cushing Hollow, which is designated as a High Quality stream. The access road will come off of Cushing Hollow Road. A general permit for a minor road crossing (GP-07-5329-17-001) was approved on 4/13/17. The GP-07 authorizes replacement of a stream culvert, which crosses Cushing Hollow at the access road entrance. An existing farm lane will be upgraded and serve as the access road for the site; total length of the access road will be 9,700 feet. The site will consist of a well pad (approximately 350 feet x 500 feet) and two sediment traps. Sediment Trap 1 (ST-1) will be located beyond the southwest pad corner and Sediment |
For data sources see[5]