Well ID: 37-105-21855
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Summit Township
Operator Name: JKLM ENERGY LLC
Well Pad ID: 153187
Farm/Lease Name: SWEDEN VALLEY
License Status: Active
Spud Date: 2016-02-20
Permit Date: 2015-12-21
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.713331
Longitude: -77.912706

For data sources see[1][2][3]

Well History

Date Event
2015-12-21 New Permit Application
2016-02-19 Performed Spud Operation
2016-07-09 Drilling Completion
2016-07-21 Perforation
2016-08-12 Perforation
2016-08-13 Perforation
2016-08-14 Perforation
2016-08-15 Perforation
2016-08-16 Perforation
2016-08-17 Perforation
2016-08-18 Perforation
2016-08-19 Perforation
2016-08-20 Perforation
2019-07-22 Deviated

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 JKLM ENERGY LLC 65,162.39 15 0.00 0 0.00 0
2017 JKLM ENERGY LLC 2,534,827.48 359 0.00 0 0.00 0
2018 JKLM ENERGY LLC 1,202,093.00 365 0.00 0 0.00 0
2019 JKLM ENERGY LLC 817,435.00 333 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 JKLM ENERGY LLC Synthetic Liner Materials 16.33 Tons LANDFILL 301358
2016 JKLM ENERGY LLC Produced Fluid 11,300.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 JKLM ENERGY LLC Drilling Fluid Waste 1,930.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2016 JKLM ENERGY LLC Drilling Fluid Waste 1,930.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2016 JKLM ENERGY LLC Waste Water Treatment Sludge 38.67 Tons LANDFILL 301358
2016 JKLM ENERGY LLC Drill Cuttings 1,399.73 Tons LANDFILL 301358
2016 JKLM ENERGY LLC Drilling Fluid Waste 488.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 JKLM ENERGY LLC Produced Fluid 843.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 JKLM ENERGY LLC Drilling Fluid Waste 2,206.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 JKLM ENERGY LLC Other Oil & Gas Wastes 206.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 JKLM ENERGY LLC Produced Fluid 761.67 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 2,104.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 JKLM ENERGY LLC Produced Fluid 3,075.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 JKLM ENERGY LLC Produced Fluid 36.67 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 JKLM ENERGY LLC Produced Fluid 22,604.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 1,133.00 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Basic Sediment 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 JKLM ENERGY LLC Drilling Fluid Waste 748.66 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 120.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 JKLM ENERGY LLC Synthetic Liner Materials 6.00 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Produced Fluid 6,783.34 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Produced Fluid 192.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 JKLM ENERGY LLC Produced Fluid 41.67 Bbl INJECTION DISPOSAL WELL 34-133-20114
2017 JKLM ENERGY LLC Produced Fluid 10,243.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 JKLM ENERGY LLC Waste Water Treatment Sludge 7.00 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 547.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 JKLM ENERGY LLC Other Oil & Gas Wastes 427.56 Bbl REUSE (AT WELL PAD)
2018 JKLM ENERGY LLC Produced Fluid 411.67 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 JKLM ENERGY LLC Produced Fluid 2,192.99 Bbl REUSE (AT WELL PAD)
2018 JKLM ENERGY LLC Produced Fluid 2,805.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 JKLM ENERGY LLC Produced Fluid 409.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2018 JKLM ENERGY LLC Produced Fluid 3,285.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 JKLM ENERGY LLC Produced Fluid 2,836.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 JKLM ENERGY LLC Produced Fluid 337.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 JKLM ENERGY LLC Other Oil & Gas Wastes 66.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 JKLM ENERGY LLC Produced Fluid 764.99 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 JKLM ENERGY LLC Synthetic Liner Materials 0.93 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 863.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 JKLM ENERGY LLC Produced Fluid 1,403.34 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 JKLM ENERGY LLC Produced Fluid 586.67 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 JKLM ENERGY LLC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-155-24099
2019 JKLM ENERGY LLC Produced Fluid 214.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 JKLM ENERGY LLC Produced Fluid 548.78 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 JKLM ENERGY LLC Produced Fluid 1,039.99 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC038
2019 JKLM ENERGY LLC Produced Fluid 36.67 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 JKLM ENERGY LLC Produced Fluid 611.67 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2438035 Primary Facility 2016-01-05 Routine/Partial Inspection No Violations Noted Preconstruction meeting for the Sweden Valley 101 well pad. Logging operations to begin on 1/6/15. Site construction anticipated to begin after logging operations completed and will take approximately 3 weeks. TLT
2452374 Primary Facility 2016-02-18 Preoperation Inspection No Violations Noted Preoperational inspection. Spud notices for the 2HU - 5HU wells were received on 2/17/16 with an anticipated spud date of 2/19/16. Site has been constructed and stabilized. Perimeter E&S controls have been installed. TLT
2467659 Primary Facility 2016-03-24 Routine/Complete Inspection No Violations Noted
2470279 Primary Facility 2016-03-29 Routine/Complete Inspection No Violations Noted
2472921 Primary Facility 2016-04-08 Routine/Complete Inspection No Violations Noted
2509744 Primary Facility 2016-08-11 Routine/Complete Inspection No Violations Noted
2511295 Primary Facility 2016-07-19 Routine/Complete Inspection No Violations Noted
2546838 Primary Facility 2016-12-16 Routine/Complete Inspection No Violations Noted Routine inspection. The 2HU - 4HU wells have been drilled and stimulated. Production equipment has been installed at the site. The site was snow covered and frozen, therefore vegetative cover and E&S controls were not observed. TLT
2551292 Primary Facility 2017-01-09 Routine/Complete Inspection No Violations Noted
2564749 Primary Facility 2017-02-24 Routine/Complete Inspection No Violations Noted
2606492 Primary Facility 2017-05-18 Routine/Complete Inspection No Violations Noted
2609675 Primary Facility 2017-06-22 Routine/Partial Inspection No Violations Noted On 6/22/17 at 1345 hrs I conducted a routine inspection at the Sweden Valley 101 well site. It was overcast and 82 degrees F. Sean Bacha, Oil and Gas Consultant, was present at the site during the inspection.

The 2HU - 4HU wells were drilled in 2016 and are equipped for production. The 5HU well was spud, however, then plugged in December 2016. A new well permit application for the 6V well (105-21900) was received on 6/5/17.

I observed the E&S controls, production equipment and other materials staged on site. Grass is becoming well established on the topsoil stockpile and around the sediment traps; however, vegetative cover on the well pad fill slopes remains sparse. The sediment traps were observed (Photo #1). ST-1 (southern trap) held a minimal amount of water and had a field measured specific conductance of 209 micro Siemens/cm. The filter fabric had come off the rock filter and should be restaked (Photo #2). ST-2 (northern trap) was approximately half full and had a specific conductance of 73 micro Sie

2690882 Primary Facility 2018-01-25 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. The wellhead assembly all fittings all flow lines and all vented annulus were tested for gas. Results of this testing was that no gas was detected on the wellhead assembly or fittings , flow lines , vented annulus or well area.
2691190 Primary Facility 2018-02-05 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. The wellhead assembly all fittings, flow lines and vented annulus were tested for gas. Results of this testing was that no gas was detected on any of these areas of this well.
2706610 Primary Facility 2018-03-12 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. The well annulus 13 3/8"x 9 5/8" and 9 5/8" x 5 1/2" were being vented. The wellhead assembly,fittings,flow lines and annulus vents were tested for combustable gas. Results of this testing was that the 13 3/8" x 9 5/8" had 0% LEL (lower explosion limit) and 0% Methane measured on it with the gas meter. The 9 5/8" x 5 1/2" annulus vent tested 100% LEL (lower explosion limit) and 25% Methane combustable gas. No other gas was detected on the wellhead assembly or the well area.
2715624 Primary Facility 2018-04-06 Routine/Complete Inspection No Violations Noted At the time of this inspection the annulus vents, and cellar and well area were tested for combustable gas. Results of this testing was that no combustable gas was detected on the annulus vents, the cellar or the well area. Rob Bowens (production supervisor) was at this inspection.
2767318 Primary Facility 2018-08-24 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. No combustible gas was detected on the annulus vents,cellar or the well area at this inspection. No violations noted at this inspection.
2768964 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of the JKLM Sweden Valley 101 Well Pad ESG29-105-15-0003 on 8/23/2018 @1130 hours. The weather was 70 degrees sunny, 58% humidity and winds WNW 13 mph.

The 2HU-4HU wells were drilled in 2016 and are currently in production. The 5HU well was spud, then plugged in December 2016.

The access road, well pad and associated controls were inspected. A compressor unit appears to have been installed on the SE corner of the well pad. Large puddles were observed on the pad surface from recent heavy rains. All puddles on teh pad surface measured <300mS/cm(Photo#3). The fluid in teh duck pond containment had a field measured conductivity of 300uS/cm. JKLM representatives were contact and a vac truck was dispatched to the site. The elevated conductivity fluid was removed.

A violation of 25 Pa Code 78a.56(a) is cited as IMMEDIATELY CORRECTED against the 2HU well API#105-21855 due to the remediation of the elevated conductivity fluid by a vac truck during the inspection.

I departe

2804702 Primary Facility 2018-11-19 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. There are two (2) annulus vents openly venting on this well. Annulus vent intermediate 2 x production (9 5/8" x 5 1/2") was venting 100% LEL (lower explosion limit) and 100% METHANE combustible gas. No other annulus vents were noted venting at this inspection. No violations noted at the time of this inspection.
2822372 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection conducted a routine inspection of the JKLM Sweden Valley 101 Well Pad located in Summit Twp, Potter Co. on 1/2/2019 @1115 hours. The weather 32 degrees, cloudy, 78% humidity winds, S @5mph. The site appears to be set up for production.

Empty production tanks appear to be stored around the perimeter of the site. Puddles observed on the pad surface were field screened for conductivity and found to be within normal range. No violations are noted at this time. We departed the site at 1200 hours.

2845844 Primary Facility 2019-02-27 Routine/Complete Inspection No Violations Noted At the time of this inspection this well as in production. A digital gauge was indicating a psi (pounds per square inch) of 1089. There are two annulus vents that are vented to surface and were tested for combustible gas with an Altair 5 x Multi Gas Meter. This gas meter was calibrated on 2-20-19. Results of this testing were 0% LEL ( lower explosion limit) and 0% Methane on the 13 3/8" x 9 5/8" vent and 100% LEL and 9% Methane on the 9 5/8" x 5 1/2" vent. No violations noted at this inspection.