Well Details

Well ID: 37-105-21723
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Allegany Township
Operator Name: PENN VIRGINIA OIL & GAS CORP
Well Pad ID: 149192
Farm/Lease Name: RISSER
License Status: Plugged and Abandoned
Spud Date: 2010-11-29
Permit Date: 2010-09-30
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.840103
Longitude: -77.879906

For data sources see[1][2][3]

Well History

Date Event
2010-09-30 New Permit Application
2010-11-29 Performed Spud Operation
2010-12-03 New Permit Application
2010-12-29 Drilling Completion
2011-01-12 Drilling Completion
2011-03-17 Fully Plugged
2011-03-29 Perforation
2011-04-04 Perforation
2011-04-05 Perforation
2011-04-06 Perforation
2011-04-07 Perforation
2011-04-08 Perforation
2011-04-11 Perforation
2011-04-12 Perforation
2011-04-13 Perforation
2011-04-14 Perforation
2011-08-15 Fully Plugged
2016-08-17 Begin Plugging
2016-08-17 Finished Plugging

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENN VIRGINIA OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2011 PENN VIRGINIA OIL & GAS CORP 26,581.00 62 0.00 0 0.00 0
2012 PENN VIRGINIA OIL & GAS CORP 88.97 329 0.00 0 0.00 0
2013 PENN VIRGINIA OIL & GAS CORP 53.47 357 0.00 0 0.00 0
2014 PENN VIRGINIA OIL & GAS CORP 47.01 365 0.00 0 0.00 0
2015 PENN VIRGINIA OIL & GAS CORP 26,095.99 362 0.00 0 0.00 0
2016 PENN VIRGINIA OIL & GAS CORP 25,630.00 213 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PENN VIRGINIA OIL & GAS CORP Drill Cuttings 338.84 Tons LANDFILL 101397
2011 PENN VIRGINIA OIL & GAS CORP Fracing Fluid Waste 1,045.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 PENN VIRGINIA OIL & GAS CORP Fracing Fluid Waste 19,730.48 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 PENN VIRGINIA OIL & GAS CORP Fracing Fluid Waste 4,280.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011 PENN VIRGINIA OIL & GAS CORP Produced Fluid 2,120.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2011 PENN VIRGINIA OIL & GAS CORP Fracing Fluid Waste 5,219.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2011 PENN VIRGINIA OIL & GAS CORP Drill Cuttings 858.22 Tons LANDFILL 101397
2012 PENN VIRGINIA OIL & GAS CORP Produced Fluid 12,604.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2013 PENN VIRGINIA OIL & GAS CORP Produced Fluid 4,233.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2014 PENN VIRGINIA OIL & GAS CORP Produced Fluid 8,333.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2015 PENN VIRGINIA OIL & GAS CORP Produced Fluid 3,905.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2016 PENN VIRGINIA OIL & GAS CORP Produced Fluid 1,356.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1930864 Primary Facility 2010-11-29 Routine/Partial Inspection No Violations Noted
1933501 Primary Facility 2010-12-11 Drilling/Alteration No Violations Noted
1934402 Primary Facility 2010-12-15 Drilling/Alteration No Violations Noted
1938286 Primary Facility 2010-12-21 Drilling/Alteration No Violations Noted
1940036 Primary Facility 2010-12-31 Drilling/Alteration No Violations Noted
1941685 Primary Facility 2011-01-07 Drilling/Alteration No Violations Noted
1942007 Primary Facility 2011-01-11 Routine/Partial Inspection No Violations Noted
1954678 Primary Facility 2011-03-02 Follow-up Inspection No Violations Noted
1956741 Primary Facility 2011-03-08 Follow-up Inspection No Violations Noted
1968190 Primary Facility 2011-04-25 Follow-up Inspection No Violations Noted
1971836 Primary Facility 2011-05-06 Routine/Partial Inspection No Violations Noted
2011756 Primary Facility 2011-10-13 Routine/Complete Inspection No Violations Noted A routine site inspection was conducted on Oct. 13, 2011 at 1038. The site ID sign, E&S control plan and perimeter BMPs were observed. The last self -inspection was conducted on10/4/11. The site is actively in the process of being restored. The impoundment is empty; the liner removed and is currently being back-filled. The pad is being reduced in size, the original contours are being re-established and the slopes are scheduled to be seeded and blanketed by the end of October 2011. - MRN
2041165 Primary Facility 2012-01-31 Routine/Complete Inspection No Violations Noted
2069316 Primary Facility 2012-04-30 Routine/Complete Inspection No Violations Noted
2087609 Primary Facility 2012-07-30 Site Restoration No Violations Noted An inspection was conducted at the Risser Pad on July 30, 2012 in response to a Notice of Termination and a Well Site Restoration report received by the Department. The site was determined to meet the requirements of 25 Pa Code §102.22(a)(2) (i) Permanent Stabilization. A minimum uniform 70% perennial vegetative cover, with a density capable of resisting accelerated erosion and sedimentation was observed. The approval of the Notice of Termination is recommended. The Well Site Restoration Report is being approved. No new violations were cited during this inspection. -MRN
2452849 Primary Facility 2016-02-12 Routine/Complete Inspection No Violations Noted Routine inspection. Site has been restored and permanently stabilized. Supplies/materials remain on site that are not necessary for production. Staging of materials is acceptable if the operator has written permission from the surface landowner. TLT
2483159 Primary Facility 2016-05-09 Routine/Complete Inspection No Violations Noted
2507478 Primary Facility 2016-08-02 Plugging(Includes Plugged/Mined Through) No Violations Noted
2511300 Primary Facility 2016-08-16 Plugging(Includes Plugged/Mined Through) No Violations Noted
2511304 Primary Facility 2016-08-16 Plugging(Includes Plugged/Mined Through) No Violations Noted
2511305 Primary Facility 2016-08-17 Plugging(Includes Plugged/Mined Through) No Violations Noted
2511306 Primary Facility 2016-08-17 Plugging(Includes Plugged/Mined Through) No Violations Noted
2571905 Primary Facility 2017-03-13 Routine/Complete Inspection No Violations Noted On 3/13/17 at 1210 hrs I conducted a routine inspection of the Risser well site. It was overcast and 25 degrees F. No one was present during the inspection.

Final restoration of the well site was completed following plugging of the 1H and 2H wells in August 2016. The site has been graded to original contour and seeded and mulched. Above-ground monuments for the plugged wells were not observed in the restored area.

The access road, which was a pre-existing farm lane, was left in place. Some equipment remains at the site, including a large vented tank and other miscellaneous items. As per Section 3216(d) of 58 Pa.C.S. Sections 3201 - 3274 (relating to Development) ("2012 Oil and Gas Act) all production or storage facilities, supplies and equipment shall be removed and the well site restored within nine months after plugging a well. The tank and other miscellaneous items should be removed as part of the final restoration.

To date, Well Site Restoration Reports (WSRRs) for the 1H and 2H wells have not been r

2628389 Primary Facility 2017-08-23 Site Restoration No Violations Noted On 8/23/17 at 1052 hrs I conducted a restoration inspection of the Risser well site. It was mostly sunny and 65 degrees F. No one was present during the inspection.

Final restoration of the well site was completed following plugging of the 1H and 2H wells in August 2016. The site has been graded to original contours and meets the permanent stabilization requirements found under 25 Pa Code Section 102.22(a). The access road, which was a pre-existing farm lane, was left in place. Since the last inspection on 3/13/17, the equipment that remained on site has been removed.

An electronic copy of the Well Site Restoration Report (WSRR) was received on 8/14/17; the report was reviewed on 8/23/17 and found to be administratively complete. No violations were cited during this inspection. I concluded the inspection at 1140 hrs. TLT

For data sources see[7]