If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-105-21723 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.840103,"lon":-77.879906,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Potter | |
Municipality: Allegany Township | |
Operator Name: PENN VIRGINIA OIL & GAS CORP | |
Well Pad ID: 149192 | |
Farm/Lease Name: RISSER | |
License Status: Plugged and Abandoned | |
Spud Date: 2010-11-29 | |
Permit Date: 2010-09-30 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.840103 | |
Longitude: -77.879906 |
Date | Event |
---|---|
2010-09-30 | New Permit Application |
2010-11-29 | Performed Spud Operation |
2010-12-03 | New Permit Application |
2010-12-29 | Drilling Completion |
2011-01-12 | Drilling Completion |
2011-03-17 | Fully Plugged |
2011-03-29 | Perforation |
2011-04-04 | Perforation |
2011-04-05 | Perforation |
2011-04-06 | Perforation |
2011-04-07 | Perforation |
2011-04-08 | Perforation |
2011-04-11 | Perforation |
2011-04-12 | Perforation |
2011-04-13 | Perforation |
2011-04-14 | Perforation |
2011-08-15 | Fully Plugged |
2016-08-17 | Begin Plugging |
2016-08-17 | Finished Plugging |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PENN VIRGINIA OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | PENN VIRGINIA OIL & GAS CORP | 26,581.00 | 62 | 0.00 | 0 | 0.00 | 0 |
2012 | PENN VIRGINIA OIL & GAS CORP | 88.97 | 329 | 0.00 | 0 | 0.00 | 0 |
2013 | PENN VIRGINIA OIL & GAS CORP | 53.47 | 357 | 0.00 | 0 | 0.00 | 0 |
2014 | PENN VIRGINIA OIL & GAS CORP | 47.01 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | PENN VIRGINIA OIL & GAS CORP | 26,095.99 | 362 | 0.00 | 0 | 0.00 | 0 |
2016 | PENN VIRGINIA OIL & GAS CORP | 25,630.00 | 213 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PENN VIRGINIA OIL & GAS CORP | Drill Cuttings | 338.84 Tons | LANDFILL | 101397 |
2011 | PENN VIRGINIA OIL & GAS CORP | Fracing Fluid Waste | 1,045.71 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | PENN VIRGINIA OIL & GAS CORP | Fracing Fluid Waste | 19,730.48 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | PENN VIRGINIA OIL & GAS CORP | Fracing Fluid Waste | 4,280.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2011 | PENN VIRGINIA OIL & GAS CORP | Produced Fluid | 2,120.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2011 | PENN VIRGINIA OIL & GAS CORP | Fracing Fluid Waste | 5,219.52 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2011 | PENN VIRGINIA OIL & GAS CORP | Drill Cuttings | 858.22 Tons | LANDFILL | 101397 |
2012 | PENN VIRGINIA OIL & GAS CORP | Produced Fluid | 12,604.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2013 | PENN VIRGINIA OIL & GAS CORP | Produced Fluid | 4,233.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2014 | PENN VIRGINIA OIL & GAS CORP | Produced Fluid | 8,333.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2015 | PENN VIRGINIA OIL & GAS CORP | Produced Fluid | 3,905.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2016 | PENN VIRGINIA OIL & GAS CORP | Produced Fluid | 1,356.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1930864 | Primary Facility | 2010-11-29 | Routine/Partial Inspection | No Violations Noted | |
1933501 | Primary Facility | 2010-12-11 | Drilling/Alteration | No Violations Noted | |
1934402 | Primary Facility | 2010-12-15 | Drilling/Alteration | No Violations Noted | |
1938286 | Primary Facility | 2010-12-21 | Drilling/Alteration | No Violations Noted | |
1940036 | Primary Facility | 2010-12-31 | Drilling/Alteration | No Violations Noted | |
1941685 | Primary Facility | 2011-01-07 | Drilling/Alteration | No Violations Noted | |
1942007 | Primary Facility | 2011-01-11 | Routine/Partial Inspection | No Violations Noted | |
1954678 | Primary Facility | 2011-03-02 | Follow-up Inspection | No Violations Noted | |
1956741 | Primary Facility | 2011-03-08 | Follow-up Inspection | No Violations Noted | |
1968190 | Primary Facility | 2011-04-25 | Follow-up Inspection | No Violations Noted | |
1971836 | Primary Facility | 2011-05-06 | Routine/Partial Inspection | No Violations Noted | |
2011756 | Primary Facility | 2011-10-13 | Routine/Complete Inspection | No Violations Noted | A routine site inspection was conducted on Oct. 13, 2011 at 1038. The site ID sign, E&S control plan and perimeter BMPs were observed. The last self -inspection was conducted on10/4/11. The site is actively in the process of being restored. The impoundment is empty; the liner removed and is currently being back-filled. The pad is being reduced in size, the original contours are being re-established and the slopes are scheduled to be seeded and blanketed by the end of October 2011. - MRN |
2041165 | Primary Facility | 2012-01-31 | Routine/Complete Inspection | No Violations Noted | |
2069316 | Primary Facility | 2012-04-30 | Routine/Complete Inspection | No Violations Noted | |
2087609 | Primary Facility | 2012-07-30 | Site Restoration | No Violations Noted | An inspection was conducted at the Risser Pad on July 30, 2012 in response to a Notice of Termination and a Well Site Restoration report received by the Department. The site was determined to meet the requirements of 25 Pa Code §102.22(a)(2) (i) Permanent Stabilization. A minimum uniform 70% perennial vegetative cover, with a density capable of resisting accelerated erosion and sedimentation was observed. The approval of the Notice of Termination is recommended. The Well Site Restoration Report is being approved. No new violations were cited during this inspection. -MRN |
2452849 | Primary Facility | 2016-02-12 | Routine/Complete Inspection | No Violations Noted | Routine inspection. Site has been restored and permanently stabilized. Supplies/materials remain on site that are not necessary for production. Staging of materials is acceptable if the operator has written permission from the surface landowner. TLT |
2483159 | Primary Facility | 2016-05-09 | Routine/Complete Inspection | No Violations Noted | |
2507478 | Primary Facility | 2016-08-02 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2511300 | Primary Facility | 2016-08-16 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2511304 | Primary Facility | 2016-08-16 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2511305 | Primary Facility | 2016-08-17 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2511306 | Primary Facility | 2016-08-17 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2571905 | Primary Facility | 2017-03-13 | Routine/Complete Inspection | No Violations Noted | On 3/13/17 at 1210 hrs I conducted a routine inspection of the Risser well site. It was overcast and 25 degrees F. No one was present during the inspection.
Final restoration of the well site was completed following plugging of the 1H and 2H wells in August 2016. The site has been graded to original contour and seeded and mulched. Above-ground monuments for the plugged wells were not observed in the restored area. The access road, which was a pre-existing farm lane, was left in place. Some equipment remains at the site, including a large vented tank and other miscellaneous items. As per Section 3216(d) of 58 Pa.C.S. Sections 3201 - 3274 (relating to Development) ("2012 Oil and Gas Act) all production or storage facilities, supplies and equipment shall be removed and the well site restored within nine months after plugging a well. The tank and other miscellaneous items should be removed as part of the final restoration. To date, Well Site Restoration Reports (WSRRs) for the 1H and 2H wells have not been r |
2628389 | Primary Facility | 2017-08-23 | Site Restoration | No Violations Noted | On 8/23/17 at 1052 hrs I conducted a restoration inspection of the Risser well site. It was mostly sunny and 65 degrees F. No one was present during the inspection.
Final restoration of the well site was completed following plugging of the 1H and 2H wells in August 2016. The site has been graded to original contours and meets the permanent stabilization requirements found under 25 Pa Code Section 102.22(a). The access road, which was a pre-existing farm lane, was left in place. Since the last inspection on 3/13/17, the equipment that remained on site has been removed. An electronic copy of the Well Site Restoration Report (WSRR) was received on 8/14/17; the report was reviewed on 8/23/17 and found to be administratively complete. No violations were cited during this inspection. I concluded the inspection at 1140 hrs. TLT |
For data sources see[7]