If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-085-23364 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.43742,"lon":-80.404778,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Mercer | |
| Municipality: West Salem Township | |
| Operator Name: L & B ENERGY LLP | |
| Well Pad ID: | |
| Farm/Lease Name: MILLER 4 | |
| License Status: ACTIVE | |
| Spud Date: | |
| Permit Date: 2003-07-25 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: Yes | |
| Latitude: 41.437420 | |
| Longitude: -80.404778 |
| Date | Event |
|---|---|
| 2003-07-25 | New Permit Application |
| 2004-01-15 | Performed Spud Operation |
| 2004-01-21 | Drilling Completion |
| 2004-02-03 | Perforation |
| 2004-05-18 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2003 | CEDAR VALLEY ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2004 | CEDAR VALLEY ENERGY INC | 10879 | 365 | 261.95 | 365 | 0.00 | 0 |
| 2005 | CEDAR VALLEY ENERGY INC | 19843 | 365 | 190.48 | 365 | 0.00 | 0 |
| 2006 | CEDAR VALLEY ENERGY INC | 14393.00 | 365 | 164.00 | 365 | 0.00 | 0 |
| 2007 | CEDAR VALLEY ENERGY INC | 9816.00 | 365 | 99 | 365 | 0.00 | 0 |
| 2008 | CEDAR VALLEY ENERGY INC | 6538.00 | 365 | 43.67 | 365 | 0.00 | 0 |
| 2009 | CEDAR VALLEY ENERGY INC | 4915.00 | 365 | 57.73 | 365 | 0.00 | 0 |
| 2010 | CEDAR VALLEY ENERGY INC | 5,010.00 | 365 | 229.06 | 365 | 0.00 | 0 |
| 2011 | CEDAR VALLEY ENERGY INC | 3,867.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2012 | CEDAR VALLEY ENERGY INC | 2,486.00 | 365 | 48.77 | 365 | 0.00 | 0 |
| 2013 | CEDAR VALLEY ENERGY INC | 2,091.00 | 365 | 72.31 | 365 | 0.00 | 0 |
| 2014 | CEDAR VALLEY ENERGY INC | 1,723.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2015 | CEDAR VALLEY ENERGY INC | 1,436.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2016 | L & B ENERGY LLP | 1,574.00 | 365 | 47.28 | 365 | 0.00 | 0 |
| 2017 | L & B ENERGY LLP | 991.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2018 | L & B ENERGY LLP | 855.00 | 365 | 30.45 | 365 | 0.00 | 0 |
| 2019 | L & B ENERGY LLP | 1,145.00 | 365 | 217.52 | 365 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2004 | CEDAR VALLEY ENERGY INC | Brine | 693.00 Bbl | Injection Disposal Well | 1893 1894 3203 |
| 2005 | CEDAR VALLEY ENERGY INC | Brine | 50.00 Bbl | Reuse other than road spreading | |
| 2005 | CEDAR VALLEY ENERGY INC | Brine | 294.00 Bbl | Injection Disposal Well | |
| 2006 | CEDAR VALLEY ENERGY INC | Brine | 202.00 Bbl | Injection Disposal Well | |
| 2008 | CEDAR VALLEY ENERGY INC | Brine | 85.00 Bbl | Other | 3415523795 |
| 2009 | CEDAR VALLEY ENERGY INC | Brine | 40.00 Bbl | Injection Disposal Well | OH-3415523795 |
| 2010 | CEDAR VALLEY ENERGY INC | Produced Fluid | 185.00 Bbl | Injection Disposal Well | 34-155-23795 |
| 2011 | CEDAR VALLEY ENERGY INC | Produced Fluid | 80.00 Bbl | Injection Disposal Well | 34-155-23795 |
| 2013 | CEDAR VALLEY ENERGY INC | Produced Fluid | 40.00 Bbl | Injection Disposal Well | 34-155-21893 |
| 2015 | CEDAR VALLEY ENERGY INC | Produced Fluid | 67.00 Bbl | Injection Disposal Well | 34-007-20919 |
| 2016 | L & B ENERGY LLP | Produced Fluid | 78.00 Bbl | Injection Disposal Well | 34-007-20919 |
| 2017 | L & B ENERGY LLP | Produced Fluid | 66.00 Bbl | Injection Disposal Well | 34-155-24063 |
| 2018 | L & B ENERGY LLP | Produced Fluid | 38.00 Bbl | Injection Disposal Well | 34-007-21847 |
| 2019 | L & B ENERGY LLP | Produced Fluid | 54.00 Bbl | Injection Disposal Well | 34-007-21847 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1329556 | Primary Facility | 2004-04-21 | Administrative/File Review | No Violations Noted | Well record review |
For data sources see[7]