If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-083-56939 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.702,"lon":-78.806939,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: McKean | |
Municipality: Wetmore Township | |
Operator Name: BLACKHAWK ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: WT 3132 KANE ESTATE 7 | |
License Status: | |
Spud Date: | |
Permit Date: 2017-08-18 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.7020 | |
Longitude: -78.806939 |
Date | Event |
---|---|
2017-08-18 | New Permit Application |
2017-10-06 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | BLACKHAWK ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | BLACKHAWK ENERGY LLC | 6,373.75 | 365 | 2,008.25 | 365 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | BLACKHAWK ENERGY LLC | Produced Fluid | 602.50 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | BLACKHAWK ENERGY LLC | Produced Fluid | 251.75 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2642890 | Primary Facility | 2017-10-03 | Routine/Complete Inspection | No Violations Noted | This is a recently constructed well location that is staked. The pit is dug and appears to be dry. There is a liner on site waiting to be placed in. Perimeter controls are in place; no E/S issues are noted on this site. The well permit is posted in a tree on the site. |
2646086 | Primary Facility | 2017-10-11 | Drilling/Alteration | No Violations Noted | Rig just completed drilling @ 2775 ft. Will run water and clean hole tomorrow and pull drill steel. 7" surface casing was cemented and 8bbl. of cement were returned to surface. A pressure test was preformed on the casing shoe; 175 lbs pressure was held for 1/2hr with 6lbs loss. Pit and location are lined and all fluids are directed to pit. |
2670389 | Primary Facility | 2017-12-13 | Routine/Complete Inspection | No Violations Noted | This is a recently drilled well that has not yet been fraced. There is a 20 mil lined pit on site. This site is stable and snow covered. No spills or leaks are noted. The permit is available in a tree on site. |
2688759 | Primary Facility | 2018-01-31 | Drilling/Alteration | No Violations Noted | Fracing at this time stage 5 of 11 or 12. Fluids are going into a lined pit. |
2708682 | Primary Facility | 2018-03-22 | Routine/Complete Inspection | No Violations Noted | The Operator has been undertaking spot stoning of roads in this area following spring thaw and drilling/stimulation of the wells. A 3/20 meeting was held with the operator and US Forest Service to discuss ways to build up roads and prevent erosion as well as to create better conditions for future development.
To that end, the operator has placed down spot stone near the lease tank battery and 3/21 placed down pit run stone near the culvert crossing below the #7 site. Temporary measures to prevent sediment from reaching waters below have also been taken. When weather conditions allow, further road work including shaping of roads and stoning will be done. |
2796267 | Primary Facility | 2018-10-30 | Site Restoration | No Violations Noted | This is a site restoration inspection following operator submission of a Well Site Restoration Report.
The operator has gotten vegetation growing on all disturbed areas. The pit has been filled in and vegetation is growing. BMPs are in place and appear to be functioning. This location is considered to be restored. |
For data sources see[7]