37-083-56939

Well Details

Well ID: 37-083-56939
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Wetmore Township
Operator Name: BLACKHAWK ENERGY LLC
Well Pad ID:
Farm/Lease Name: WT 3132 KANE ESTATE 7
License Status:
Spud Date:
Permit Date: 2017-08-18
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.7020
Longitude: -78.806939

For data sources see[1][2][3]

Well History

Date Event
2017-08-18 New Permit Application
2017-10-06 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 BLACKHAWK ENERGY LLC 0.00 0 0.00 0 0.00 0
2018 BLACKHAWK ENERGY LLC 6,373.75 365 2,008.25 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 BLACKHAWK ENERGY LLC Produced Fluid 602.50 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2019 BLACKHAWK ENERGY LLC Produced Fluid 251.75 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2642890 Primary Facility 2017-10-03 Routine/Complete Inspection No Violations Noted This is a recently constructed well location that is staked. The pit is dug and appears to be dry. There is a liner on site waiting to be placed in. Perimeter controls are in place; no E/S issues are noted on this site. The well permit is posted in a tree on the site.
2646086 Primary Facility 2017-10-11 Drilling/Alteration No Violations Noted Rig just completed drilling @ 2775 ft. Will run water and clean hole tomorrow and pull drill steel. 7" surface casing was cemented and 8bbl. of cement were returned to surface. A pressure test was preformed on the casing shoe; 175 lbs pressure was held for 1/2hr with 6lbs loss. Pit and location are lined and all fluids are directed to pit.
2670389 Primary Facility 2017-12-13 Routine/Complete Inspection No Violations Noted This is a recently drilled well that has not yet been fraced. There is a 20 mil lined pit on site. This site is stable and snow covered. No spills or leaks are noted. The permit is available in a tree on site.
2688759 Primary Facility 2018-01-31 Drilling/Alteration No Violations Noted Fracing at this time stage 5 of 11 or 12. Fluids are going into a lined pit.
2708682 Primary Facility 2018-03-22 Routine/Complete Inspection No Violations Noted The Operator has been undertaking spot stoning of roads in this area following spring thaw and drilling/stimulation of the wells. A 3/20 meeting was held with the operator and US Forest Service to discuss ways to build up roads and prevent erosion as well as to create better conditions for future development.

To that end, the operator has placed down spot stone near the lease tank battery and 3/21 placed down pit run stone near the culvert crossing below the #7 site. Temporary measures to prevent sediment from reaching waters below have also been taken. When weather conditions allow, further road work including shaping of roads and stoning will be done.

2796267 Primary Facility 2018-10-30 Site Restoration No Violations Noted This is a site restoration inspection following operator submission of a Well Site Restoration Report.

The operator has gotten vegetation growing on all disturbed areas. The pit has been filled in and vegetation is growing. BMPs are in place and appear to be functioning. This location is considered to be restored.