If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-083-56201 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.705428,"lon":-78.790442,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: McKean | |
Municipality: Wetmore Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: WARRANT 3122 3064 | |
License Status: | |
Spud Date: | |
Permit Date: 2013-08-01 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.705428 | |
Longitude: -78.790442 |
Date | Event |
---|---|
2013-08-01 | New Permit Application |
2014-01-24 | Performed Spud Operation |
2014-01-29 | Drilling Completion |
2015-01-13 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | 1,028.81 | 365 | 101.66 | 365 | 22.94 | 365 |
2015 | CATALYST ENERGY INC | 360.2 | 274 | 89.03 | 274 | 8.91 | 274 |
2016 | CATALYST ENERGY INC | 0.00 | 0 | 243.20 | 16 | 243.2 | 1 |
2017 | CATALYST ENERGY INC | 248.70 | 365 | 152.78 | 365 | 5.27 | 365 |
2018 | CATALYST ENERGY INC | 1,416.60 | 365 | 169.79 | 365 | 18.29 | 365 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | Produced Fluid | 401.43 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 401.43 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 128.14 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2016 | CATALYST ENERGY INC | Produced Fluid | 16.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2017 | CATALYST ENERGY INC | Produced Fluid | 10.00 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 20.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 360.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2017 | CATALYST ENERGY INC | Produced Fluid | 358.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | CATALYST ENERGY INC | Produced Fluid | 666.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 10.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 167.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 130.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2243009 | Primary Facility | 2014-01-28 | Drilling/Alteration | No Violations Noted | |
2243013 | Primary Facility | 2014-01-27 | Drilling/Alteration | No Violations Noted | |
2253030 | Primary Facility | 2014-03-05 | Drilling/Alteration | No Violations Noted | |
2312424 | Primary Facility | 2014-09-26 | Routine/Complete Inspection | No Violations Noted | |
2319680 | Primary Facility | 2014-11-03 | Drilling/Alteration | No Violations Noted | |
2598018 | Primary Facility | 2017-05-26 | Site Restoration | No Violations Noted | This is a combination well with an electric powered pumpjack attached. No spills or leaks are noted. The well is tagged. This site is stable and BMPs are in place and functioning. This site has been restored. |
For data sources see[7]