X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-083-49596

Well Details

Well ID: 37-083-49596
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Hamilton Township
Operator Name: PENNHILLS RESOURCES LLC
Well Pad ID:
Farm/Lease Name: WARRANT 5573
License Status: ACTIVE
Spud Date: 2004-08-16
Permit Date: 2004-06-10
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.814880
Longitude: -78.850858

For data sources see[1][2][3]

Well History

Date Event
2004-06-10 New Permit Application
2004-08-17 Performed Spud Operation
2004-08-18 Drilling Completion
2004-09-24 Perforation
2004-09-24 Performed Stage 1 of Stimulation
2004-09-24 Performed Stage 10 of Stimulation
2004-09-24 Performed Stage 11 of Stimulation
2004-09-24 Performed Stage 13 of Stimulation
2004-09-24 Performed Stage 14 of Stimulation
2004-09-24 Performed Stage 15 of Stimulation
2004-09-24 Performed Stage 16 of Stimulation
2004-09-24 Performed Stage 17 of Stimulation
2004-09-24 Performed Stage 18 of Stimulation
2004-09-24 Performed Stage 19 of Stimulation
2004-09-24 Performed Stage 2 of Stimulation
2004-09-24 Performed Stage 20 of Stimulation
2004-09-24 Performed Stage 21 of Stimulation
2004-09-24 Performed Stage 22 of Stimulation
2004-09-24 Performed Stage 23 of Stimulation
2004-09-24 Performed Stage 24 of Stimulation
2004-09-24 Performed Stage 25 of Stimulation
2004-09-24 Performed Stage 26 of Stimulation
2004-09-24 Performed Stage 27 of Stimulation
2004-09-24 Performed Stage 3 of Stimulation
2004-09-24 Performed Stage 4 of Stimulation
2004-09-24 Performed Stage 5 of Stimulation
2004-09-24 Performed Stage 6 of Stimulation
2004-09-24 Performed Stage 7 of Stimulation
2004-09-24 Performed Stage 8 of Stimulation
2004-09-24 Performed Stage 9 of Stimulation
2005-11-02 NEWLY DRILLED
2020-01-08 Perforation
2020-01-10 Performed Stage 10 of Stimulation
2020-01-10 Performed Stage 11 of Stimulation
2020-01-10 Performed Stage 13 of Stimulation
2020-01-10 Performed Stage 4 of Stimulation
2020-01-10 Performed Stage 5 of Stimulation
2020-01-10 Performed Stage 6 of Stimulation
2020-01-10 Performed Stage 7 of Stimulation
2020-01-10 Performed Stage 8 of Stimulation
2020-01-10 Performed Stage 9 of Stimulation
2020-01-22 Performed Stage 1 of Stimulation
2020-01-22 Performed Stage 2 of Stimulation
2020-01-22 Performed Stage 3 of Stimulation
2020-02-18 Reworked

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2004-09-24 1 Sand 46,200 1,050 1,700
2004-09-24 2 Sand 46,200 980 1,250
2004-09-24 3 Sand 46,200 1,050 2,000
2004-09-24 4 Sand 46,200 1,080 1,300
2004-09-24 5 Sand 46,200 1,120 1,800
2004-09-24 6 Sand 46,200 150 1,300
2004-09-24 7 Sand 46,200 1,280 1,550
2020-01-10 8 Sand 46,200 1,825 800
2020-01-10 9 Sand 46,200 1,850 1,500
2020-01-10 10 Sand 46,200 1,965 1,050
2020-01-10 11 Sand 46,200 1,815 1,050
12 Did Not Fracture 46,200 0 0
2020-01-10 13 Sand 46,200 1,850 900
2004-09-24 14 Sand 46,200 1,350 1,800
2004-09-24 15 Sand 46,200 1,470 2,500
2004-09-24 16 Sand 46,200 1,470 1,650
2004-09-24 17 Sand 46,200 1,510 1,500
2004-09-24 18 Sand 46,200 1,610 1,650
2004-09-24 19 Sand 46,200 1,620 2,650
2004-09-24 20 Sand 46,200 1,600 2,750
2004-09-24 21 Sand 46,200 2,054 2,600
2004-09-24 22 Sand 46,200 2,123 3,000
2004-09-24 23 Sand 46,200 1,968 3,350
2004-09-24 24 Sand 46,200 1,997 3,000
2004-09-24 25 Sand 46,200 2,067 2,700
2004-09-24 26 Sand 46,200 2,020 2,300
2004-09-24 27 Sand 46,200 2,047 2,350

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 EAST RESOURCES INC 1827.20 365 0.00 0 0.00 0
2008 EAST RESOURCES INC 1,168.55 365 0.00 0 0.00 0
2010 EAST RESOURCES MGMT LLC 949.9 365 207.50 365 0.00 0
2011 SWEPI LP 819.19 365 101.58 365 0.00 0
2012 SWEPI LP 1,993.82 366 95.89 366 0.00 0
2013 SWEPI LP 801.00 365 0.00 0 0.00 0
2014 SWEPI LP 1,176.64 365 8.89 365 0.00 0
2015 SWEPI LP 1,166.86 365 71.55 365 0.00 0
2016 SWEPI LP 707.45 366 47.71 366 0.00 0
2017 PENNHILLS RESOURCES LLC 414.14 183 22.42 183 0.00 0
2018 PENNHILLS RESOURCES LLC 555.31 364 40.41 364 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 SWEPI LP Produced Fluid 97 Bbl CENT WASTE TRT FAC NPDES PA0102784
2013 SWEPI LP Produced Fluid 97.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 SWEPI LP Produced Fluid 115.16 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 SWEPI LP Produced Fluid 115.16 Bbl CENT WASTE TRT FAC NPDES PA0102784
2015 SWEPI LP Basic Sediment 0.32 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE OHD 066060609
2017 PENNHILLS RESOURCES LLC Produced Fluid 4.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 PENNHILLS RESOURCES LLC Produced Fluid 0.68 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 PENNHILLS RESOURCES LLC Produced Fluid 11.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1372974 Primary Facility 2004-08-26 Routine/Complete Inspection No Violations Noted

For data sources see[8]

References