X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21679

Well Details

Well ID: 37-081-21679
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Eldred Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 153789
Farm/Lease Name: RHONE GAMBLE 99H 52626
License Status:
Spud Date:
Permit Date: 2017-06-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.336490
Longitude: -76.990271

For data sources see[1][2][3]

Well History

Date Event
2017-06-05 New Permit Application
2017-08-26 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SENECA RESOURCES CO LLC Drill Cuttings 90.49 Tons LANDFILL 301358
2017 SENECA RESOURCES CO LLC Synthetic Liner Materials 1.85 Tons LANDFILL 301358
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 18.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 156.43 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 993.71 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Synthetic Liner Materials 2.19 Tons LANDFILL 301358
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 157.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Produced Fluid 322.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 122.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Produced Fluid 246.42 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Produced Fluid 470.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 3.46 Tons LANDFILL 301358

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2629800 Primary Facility 2017-08-28 Routine/Complete Inspection No Violations Noted Spud inspection. 6 cellars apparent beneath timber mats.
2648193 Primary Facility 2017-10-13 Routine/Complete Inspection No Violations Noted I met with Justin Greene when I arrived on-site. Patterson/UTI rig #339 on location, currently drilling the 91H well. Overall, containments were in good condition and site was clean and well maintained. I did note one of the chemical containments that was partially on and partially off of the rig mats, which caused water to pool in the lower section that was off the rig mats. I mentioned to Justin that this most likely did not meet the 110% volume requirement, and he told me that they were planning to move that chemical containment back up onto the rig mats as soon as they could move the 3 Baker tanks that were nearby. I also noted one liner seam at the berm which was torn; Justin stated that he would have it repaired.
2659317 Primary Facility 2017-11-09 Drilling/Alteration No Violations Noted Arrived at 14:00. Weather:rain. Met with Justin Green, company man. Haliburton onsite preparing for intermediate casing cement job on Gamble 92 H.

Other wells onsite: 91H, TD'ed - shortened lateral. 95H, plugged. Will be skid The following wells are conductor only: 96H, 97H, 98H, 99H, 100H. There were no violations observed at the time of my inspection.

2664331 Primary Facility 2017-11-27 Drilling/Alteration No Violations Noted Arrived at 13:00. Weather: sunny. Met with Danny Barrera, company man. Patterson 339 on the 92H doing clean-out run. Ran cedar shaving plug to estimate washout on production well bore. Estimate 15% washout.

Other wells onsite: 91H, TD'ed - shortened lateral. 95H, plugged. Will be skid The following wells are conductor only: 96H, 97H, 98H, 99H, 100H. There were no violations observed at the time of my inspection.

2671783 Primary Facility 2017-12-14 Routine/Complete Inspection No Violations Noted Arrived at 14:50. Patterson 339 drilling the 97H, at 6900'. Drilling with oil base and using managed pressure drilling to keep down hole pressures steady. Met with Danny Berrera (company man). 91H was sidetracked and TD'ed previously. 98H and 99H are conductor only. No violations were observed during my inspection.
2694811 Primary Facility 2018-02-14 Drilling/Alteration No Violations Noted Arrived at 15:40. Weather: warm. Patterson 339 on 98H running casing at 8808'. Met with Danny Barrera, company man. Previously, casing got stuck at approximately 13,000' (TD: 16348'). 5-1/2" casing was previously pulled. Currently using a floatation sub at approx 6000' in an effort to lift the casing off the low-side and assist in getting to bottom. Discussed plate for 95H plug. There were no violations observed at the time of my inspection.
2713708 Primary Facility 2018-03-29 Routine/Complete Inspection No Violations Noted Routine Inspection; 3/29/2018.

At the time of the inspection, the Patterson 339 was onsite drilling the production hole on the Rhone Gamble 95H(081-21676). I met with the Company Man Justin Greene and Rob Boulware (Seneca). The site was very clean and containment was in good condition. I recommend addressing the slope failure on the west side of the pad when conditions are more favorable. No violations noted.

2748793 Primary Facility 2018-07-03 Routine/Complete Inspection No Violations Noted I met Guy Williams, Seneca company man, when I arrived. A workover rig was on location drilling out plugs on the 96H well. Guy accompanied me on my inspection. Sitewide containment was impossible to assess visually due to rig mats over it, but the berms were in good condition and well protected by the rig mats. Puddles were plentiful on the pad surface at the entrance side of the pad; conductance readings were consistently low in these puddles (.7-.9 mS/cm). Water in the Baker tank containments were somewhat higher (3.7-4.2 mS/cm). Guy informed me that vac trucks had been working in these containments since heavy rain had fallen the previous day. Site housekeeping was good.
2783423 Primary Facility 2018-10-03 Routine/Complete Inspection No Violations Noted Weather was 64° and cloudy at time of inspection. Met with Seneca representative Sam Neher on location. There were 3 annulus vents plumbed to surface at time of inspection. Vents are plumbed with ball valves and analog pressure gauges. The 20x13 vent and the 13x9 vent had 0% combustible gas detected. The 9x5 vent had 100% LEL and 100% methane detected at time of inspection. Well had digital pressure monitoring equipment attached above the swab valve and to a wing valve. The gauge above the swab valve read 1550 psi and the gauge attached to the wing valve read 2280 psi at time of inspection. No violations noted at time of inspection.

For data sources see[7]

References