If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-21619 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.330544,"lon":-77.032408,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Hepburn Township | |
Operator Name: SENECA RESOURCES CO LLC | |
Well Pad ID: | |
Farm/Lease Name: WALTERS GAMBLE 40H 51712 | |
License Status: | |
Spud Date: | |
Permit Date: 2015-12-28 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.330544 | |
Longitude: -77.032408 |
Date | Event |
---|---|
2015-12-28 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2511033 | Primary Facility | 2016-08-09 | Routine/Complete Inspection | No Violations Noted | I entered the site off Spook Hollow Road at 10:56. The RCE (Rock Construction Entrance) has been installed and the perimeter E&S controls have been installed. At the time of the inspection, the contractor was scraping topsoil off the well pad area and stockpiling it on the southeast corner of the location as specified in the plans. No E&S issues were noted during the inspection and the area downslope of the earth disturbance is well vegetated, further reducing the potential for accelerated erosion. Spook Hollow and Rose Valley Roads were both upgraded prior to commencing earth disturbance on the well site. No Violations Noted. |
2520319 | Primary Facility | 2016-09-14 | Preoperation Inspection | No Violations Noted | I entered the site off Spook Hollow Road at 08:10. At the time of the inspection, the well pad’s limestone surface course was being installed and topsoil was being re-applied to graded slopes. The major earthmoving for the site is complete and most of the previously disturbed soils have been tracked-in and hydro-seeded. The infiltration trench has also been installed on the fill side of the pad as designed. Overall, the site is nearly complete. E&S controls remain installed and appear to be functioning properly. This inspection fulfills the Pre-Operational Inspection requirement of the O&G Act as amended by Act 13. No violations noted. |
For data sources see[5]