If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-081-21513 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.343461,"lon":-76.973469,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Lycoming | |
| Municipality: Eldred Township | |
| Operator Name: INFLECTION ENERGY (PA) LLC | |
| Well Pad ID: | |
| Farm/Lease Name: WINTER 3 | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2014-09-02 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 41.343461 | |
| Longitude: -76.973469 |
| Date | Event |
|---|---|
| 2014-09-02 | New Permit Application |
For data sources see[4]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2292632 | Primary Facility | 2014-07-24 | Routine/Complete Inspection | No Violations Noted | Clean Streams Law Inspection; 7/24/2014. |
| 2315075 | Primary Facility | 2014-10-14 | Preoperation Inspection | No Violations Noted | At the time of the inspection, the well pad was complete except for some final grading on the auxiliary pad and the addition of erosion control blanketing in the vegetated swale and on some slopes. E&S controls have been installed and remain in good condition. Earthmoving is complete and the entire location will be complete in the very near future. In addition, a Ziegenfuss DR-24 was onsite drilling/setting conductor. In the future, please be sure to have a pre-operational inspection prior to drilling conductor as opposed to drilling concurrent with the pre-operational inspection. Overall, the site is in good condition and no E&S issues were observed. |
For data sources see[5]