X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21429

Well Details

Well ID: 37-081-21429
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: McNett Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 145293
Farm/Lease Name: WEILER UNIT 1H
License Status:
Spud Date:
Permit Date: 2014-03-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.590061
Longitude: -76.822753

For data sources see[1][2][3]

Well History

Date Event
2014-03-06 New Permit Application
2014-04-17 Performed Spud Operation
2014-06-10 Drilling Completion
2014-08-25 Perforation
2015-02-03 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-09-07 2014-09-19 8,973 9,533,620

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid 10-30% Halliburton Acid Hydrochloric Acid 7647-01-0 30 0.1 0
MCS-2510T MULTI-CHEM Scale Inhibitor ETHYLENE GLYCOL 107-21-1 60 0.01 0
FR-66 Halliburton Friction Reducer Hydrotreated Light Petroleum Distillate 64742-47-8 30 0.02 0
MCB-8614 MULTI-CHEM BIOCIDE ALKYL (C12-16) DIMETHYLBENZXYLAMMONIUM CHLORIDE 68424-85-1 5 0.003 0
GLUTARALDEHYDE 111-30-8 30 0.02 0
Water Provided by Customer Base Fluid Fresh Water 0000-00-0 100 99.9 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 184,808.54 16 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 2,217,203.88 365 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 1,089,735.51 348 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 816,959.09 365 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 677,259.21 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste 452.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 480.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 12,352.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste 3,068.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Drill Cuttings 1,255.65 Tons LANDFILL 301358
2015 CHIEF OIL & GAS LLC Produced Fluid 518.14 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Produced Fluid 24,620.61 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 2,937.68 Bbl REUSE (AT WELL PAD)
2017 CHIEF OIL & GAS LLC Produced Fluid 914.35 Bbl REUSE OTHER THAN ROAD SPREADING
2018 CHIEF OIL & GAS LLC Produced Fluid 3,051.01 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 3,521.84 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2269143 Primary Facility 2014-05-08 Routine/Complete Inspection No Violations Noted
2271936 Primary Facility 2014-05-13 Drilling/Alteration No Violations Noted
2275784 Primary Facility 2014-06-03 Drilling/Alteration No Violations Noted
2306284 Primary Facility 2014-09-18 Routine/Complete Inspection No Violations Noted Routine Inspection; 9/18/2014.
2307013 Primary Facility 2014-09-25 Routine/Complete Inspection No Violations Noted
2566534 Primary Facility 2017-02-24 Routine/Complete Inspection No Violations Noted Routine Complete Inspection 2/24/2017.

I entered the site at 12:05. At the time of the inspection, the Cotton Hanlon 1H (081-21428) and the Weiler 1H (081-21429) wells were in production. The fresh water tank pad at the access road remains installed but the tank has been removed. The PCSM (Post Construction Stormwater Management) is permitted for this site has not been implemented. The roadside ditch leading to the first stilling basin (Approximately 575’ south of Barnes Hill Road) has erosion which is causing water to flow around the basin. The well pad was constructed as designed but the permitted plan has an impoundment located south of the well pad. Stormwater is handled by an infiltration berm which has not yet been implemented. The latest restoration schedule, submitted on 11/16/016, indicates Chief is planning to restore the site on 6/10/2017. Currently, the site has not been restored as per 3216(c) of the Oil and Gas Act as amended by Act 13. I recommend implementing the PCSM designed for th

2793514 Primary Facility 2018-10-24 Site Restoration No Violations Noted Two wells staged for production phase. Two each water separators. No leaks detected from production equipment. No violations noted. Property is owned by Cotton Hanlon Incorporated c/o Forestry Dept.

The eSubmission Post Drilling Site Restoration Report was submitted to the DEP on 10/23/2018. Based on this inspection report the Post Drilling Restoration report was accepted on 5/24/2018.

For data sources see[8]

References