Well Details

Well ID: 37-081-21368
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Pine Township
Operator Name: ARD OPR LLC
Well Pad ID: 150520
Farm/Lease Name: BONNELL RUN HUNTING & FISHING CORP D 222
License Status:
Spud Date:
Permit Date: 2013-12-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.487506
Longitude: -77.278706

For data sources see[1][2][3]

Well History

Date Event
2013-12-10 New Permit Application
2014-05-10 Performed Spud Operation
2014-08-14 Drilling Completion
2014-11-09 Perforation
2015-03-11 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-16 2014-12-02 8,379 4,738,200 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AI-7NR Trican Well Service Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 1 0.00002712 12.684
Aqucar DB 5 Trican Well Service Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5 0.00234815 1098.21
Polyethylene glycol 25322-68-3 65.2 0.0306198 14320.6
Sodium bromide 7647-15-6 1.5 0.000704444 329.462
Dibromoacetonitrile 3252-43-5 50 0.0234815 10982.1
FR-15 Trican Well Service Friction Reducer Paraffinic, Naphthenic Solvent 64742-47-8 25 0.0235946 11035
Proprietary Amide Proprietary 2.5 0.00235946 1103.5
Sand (Proppant) Trican Well Service Proppant Hexamethylenetretramine 100-97-0 1 0.146007 68286.4
Quartz 14808-60-7 99 14.4547 6,760,350.0
Aqucar DB 100 Trican Well Service Biocide 2,2-Dibromomalonamide 73003-80-2 0.2 0.00000038 0.18
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 97 0.000186662 87.3
Water Anadarko Carrier/Base Fluid Water 7732-18-5 100 84.5435 39,540,300.0
FEAC-20 Trican Well Service Iron Control Citric Acid 77-92-9 30 0.00192019 898.056
Acetic Acid 64-19-7 50 0.00320031 1496.76
Hydrochloric Acid (7.5%) Trican Well Service Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0528865 24734.6
Water 7732-18-5 92.5 0.652267 305060

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 352,585.00 93 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 990,551.00 359 0.00 0 0.00 0
2017 ARD OPR LLC 482,137.69 360 0.00 0 0.00 0
2018 ARD OPR LLC 375,638.43 330 0.00 0 0.00 0
2019 ARD OPR LLC 317,960.27 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 ANADARKO E&P ONSHORE LLC Drilling Fluid Waste 990.00 Bbl LANDFILL 301358
2014 ANADARKO E&P ONSHORE LLC Drill Cuttings 1,346.57 Tons LANDFILL 301626
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 16,750.54 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 226.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 230.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 255.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 2,125.99 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 209.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 7,722.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 1,461.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 108.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ARD OPR LLC Produced Fluid 66.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2017 ARD OPR LLC Produced Fluid 126.33 Bbl REUSE (AT WELL PAD)
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 268.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 152.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Produced Fluid 501.04 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid 82.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Produced Fluid 581.46 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 81.36 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Servicing Fluid 20.90 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 102.88 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2274419 Primary Facility 2014-05-28 Routine/Complete Inspection No Violations Noted
2276711 Primary Facility 2014-06-05 Drilling/Alteration No Violations Noted
2675701 Primary Facility 2017-12-21 Routine/Complete Inspection No Violations Noted Weather was 30° and sunny at time of inspection. There were no ARD representatives on location at time of inspection. Well has a digital pressure gauge attached above swab valve, on the 5 1/2 x 9 5/8 annulus and on the production casing. Tubing pressure read 1041 psi, casing pressure was 1154 and annulus pressure was 4 psi at time of inspection.
2804449 Primary Facility 2018-11-14 Routine/Complete Inspection No Violations Noted Routine site inspection of Alta's Bonnell Run Pad D well pad on November 14, 2018. There are a total of 4 producing Marcellus wells located on this well pad. Each well is properly labeled. There are (4) 400 bbl produced fluids tanks stationed in secondary containment. A trace of water was observed within this secondary containment. Produced fluids tanks are in good condition. No corrosion was observed on the exterior of the tanks.

The well pad has been partially reduced in size as part of the PCSM plan. Some recently new tree plantings were observed along the N and NW reclaimed area. Overall, the well pad is stable. The Department recommends removing the compost sock along the reclaimed area as it is beginning to deteriorate.

I observed stakes along the well pads access road for PCSM compost infiltration berms. These infiltration berms have not been installed to date.

No violations noted.

For data sources see[8]

References