X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21363

Well Details

Well ID: 37-081-21363
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Pine Township
Operator Name: ARD OPR LLC
Well Pad ID: 150520
Farm/Lease Name: BONNELL RUN HUNTING & FISHING CORP D 21H
License Status:
Spud Date:
Permit Date: 2013-12-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.487489
Longitude: -77.278631

For data sources see[1][2][3]

Well History

Date Event
2013-12-10 New Permit Application
2014-05-05 Performed Spud Operation
2014-06-16 Drilling Completion
2014-11-09 Perforation
2015-04-27 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-12-03 2014-12-09 8,416 3,263,150 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Aqucar DB 5 Trican Well Service Biocide Sodium bromide 7647-15-6 1.5 0.000690153 223.711
Dibromoacetonitrile 3252-43-5 50 0.0230051 7457.02
Polyethylene glycol 25322-68-3 65.2 0.0299987 9723.96
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5 0.00230051 745.703
AI-7NR Trican Well Service Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 1 0.00002883 9.346
FR-15 Trican Well Service Friction Reducer Paraffinic, Naphthenic Solvent 64742-47-8 25 0.0223499 7244.63
Proprietary Amide Proprietary 2.5 0.00223499 724.463
Hydrochloric Acid (7.5%) Trican Well Service Acidizing Water 7732-18-5 92.5 0.693455 224781
Hydrochloric Acid 7647-01-0 7.5 0.0562261 18225.5
Water Anadarko Carrier/Base Fluid Water 7732-18-5 100 84.0083 27,231,000.0
Sand (Proppant) Trican Well Service Proppant Quartz 14808-60-7 99 14.9458 4,844,620.0
Hexamethylenetretramine 100-97-0 1 0.150968 48935.6
FEAC-20 Trican Well Service Iron Control Citric Acid 77-92-9 30 0.00204144 661.725
Acetic Acid 64-19-7 50 0.0034024 1102.88
Aqucar DB 100 Trican Well Service Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 97 0.000167578 54.32
2,2-Dibromomalonamide 73003-80-2 0.2 0.00000035 0.112

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 152,537.00 93 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 373,559.00 359 0.00 0 0.00 0
2017 ARD OPR LLC 191,270.24 360 0.00 0 0.00 0
2018 ARD OPR LLC 143,351.10 316 0.00 0 0.00 0
2019 ARD OPR LLC 117,830.86 361 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 ANADARKO E&P ONSHORE LLC Drilling Fluid Waste 110.00 Bbl LANDFILL 301358
2014 ANADARKO E&P ONSHORE LLC Drill Cuttings 891.80 Tons LANDFILL 301626
2015 ANADARKO E&P ONSHORE LLC Drill Cuttings 16.14 Tons LANDFILL 301626
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 63,847.13 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 194.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 274.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 25.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 219.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 2,354.16 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 357.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 6,630.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 2,372.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 189.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ARD OPR LLC Produced Fluid 117.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2017 ARD OPR LLC Produced Fluid 219.36 Bbl REUSE (AT WELL PAD)
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 416.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 225.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Produced Fluid 814.46 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid 111.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Produced Fluid 712.21 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 108.78 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Servicing Fluid 27.50 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 139.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2274416 Primary Facility 2014-05-28 Routine/Complete Inspection No Violations Noted
2276710 Primary Facility 2014-06-05 Drilling/Alteration No Violations Noted
2675766 Primary Facility 2017-12-21 Routine/Complete Inspection No Violations Noted Weather was 30° and sunny at time of inspection. There were no ARD representatives on location at time of inspection. Well has a digital pressure gauge attached above swab valve, on the 5 1/2 x 9 5/8 annulus and on the production casing. Tubing pressure read 1179 psi, casing pressure was 1078 and annulus pressure was 16 psi at time of inspection.
2804248 Primary Facility 2018-11-14 Routine/Complete Inspection No Violations Noted Routine site inspection of Alta's Bonnell Run Pad D well pad on November 14, 2018. There are a total of 4 producing Marcellus wells located on this well pad. Each well is properly labeled. There are (4) 400 bbl produced fluids tanks stationed in secondary containment. A trace of water was observed within this secondary containment. Produced fluids tanks are in good condition. No corrosion was observed on the exterior of the tanks.

The well pad has been partially reduced in size as part of the PCSM plan. Some recently new tree plantings were observed along the N and NW reclaimed area. Overall, the well pad is stable. The Department recommends removing the compost sock along the reclaimed area as it is beginning to deteriorate.

I observed stakes along the well pads access road for PCSM compost infiltration berms. These infiltration berms have not been installed to date.

No violations noted.

For data sources see[8]

References