37-081-21287

Well Details

Well ID: 37-081-21287
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Eldred Township
Operator Name: INFLECTION ENERGY (PA) LLC
Well Pad ID: 149806
Farm/Lease Name: BUSH HILL BENNETT 1H
License Status:
Spud Date:
Permit Date: 2013-08-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.330581
Longitude: -76.965014

For data sources see[1][2][3]

Well History

Date Event
2013-08-28 New Permit Application
2013-10-14 Performed Spud Operation
2016-10-21 New Permit Application
2018-01-12 MOD

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 INFLECTION ENERGY LLC 0.00 0 0.00 0 0.00 0
2014 INFLECTION ENERGY (PA) LLC 0.00 0 0.00 0 0.00 0
2015 INFLECTION ENERGY (PA) LLC 0.00 0 0.00 0 0.00 0
2016 INFLECTION ENERGY (PA) LLC 14,511.00 69 0.00 0 0.00 0
2017 INFLECTION ENERGY (PA) LLC 71,102.00 365 0.00 0 0.00 0
2018 INFLECTION ENERGY (PA) LLC 61,984.00 363 0.00 0 0.00 0
2019 INFLECTION ENERGY (PA) LLC 55,578.67 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 INFLECTION ENERGY LLC Drill Cuttings 480.88 Tons LANDFILL 301626
2013 INFLECTION ENERGY LLC Drilling Fluid Waste 450.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 INFLECTION ENERGY LLC Drilling Fluid Waste 158.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 INFLECTION ENERGY LLC Drilling Fluid Waste 158.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 INFLECTION ENERGY LLC Drilling Fluid Waste 450.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 INFLECTION ENERGY (PA) LLC Produced Fluid 5,770.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 INFLECTION ENERGY LLC Drill Cuttings 522.31 Tons LANDFILL 301626
2016 INFLECTION ENERGY (PA) LLC Waste Water Treatment Sludge 36.90 Tons LANDFILL 301626
2016 INFLECTION ENERGY (PA) LLC Produced Fluid 3,419.00 Bbl REUSE OTHER THAN ROAD SPREADING
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 920.00 Bbl REUSE (AT WELL PAD)
2019 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes 80.00 Bbl REUSE (AT WELL PAD)
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 70.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 130.00 Bbl RESIDUAL WASTE TRANSFER FACILITY WMGR123NC039
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 70.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes 175.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2212897 Primary Facility 2013-10-07 Preoperation Inspection No Violations Noted erosion to correct. nothing beyond E&S contros/offsite.
2217842 Primary Facility 2013-10-30 Drilling/Alteration No Violations Noted
2233912 Primary Facility 2014-01-06 Drilling/Alteration No Violations Noted
2236464 Primary Facility 2014-01-09 Routine/Partial Inspection No Violations Noted Dallas Morris 25 onsite waiting for conductor to be drilled. No Vio.
2274685 Primary Facility 2014-05-21 Complaint Inspection No Violations Noted On 5/21/2014 Ms. Renner and I inspected the site. Severe erosion was noted on the cut slope of the infiltration basin and at the inlet swale entering the basin. In addition, erosion was noted in the roadside swale above the basin. Based on the erosion I recommend re-evaluating the basin design itself in addition to possibly adding additional cross culverts to reduce the volume of stormwater entering the basin.
2276593 Primary Facility 2014-05-28 Incident- Response to Accident or Event No Violations Noted 5/26/2014: Tanya Montefusco (Inflection) reported a synthetic oil-based mud spill from the Flexrig 354 after encountering gas while drilling the Bush Hill Bennett 2 (081-21351). The displaced drill mud was sprayed across the well pad, onto the soil stockpile, and on some trees.
2421401 Primary Facility 2015-10-27 Routine/Complete Inspection No Violations Noted
2427693 Primary Facility 2015-11-23 Routine/Complete Inspection No Violations Noted Weather sunny, cold and windy. Arrived @ 11:35There were 4 wells spudded on the site, 3 production tanks, 1production unit, and a bank of 4 Baker tanks on containment.
2438583 Primary Facility 2016-01-04 Complaint Inspection No Violations Noted Weather sunny, cold and windy. Arrived @ 13:20.. There were 4 wells spudded on the site, 3 production tanks, 1production unit, and a bank of 4 Baker tanks on containment.

Bush Hill Bennett 1H: well head capped, cellar empty. Annular vents were monitored for combustible gas using an Altair 5X meter calibrated on 01/04/16. No gas was detected. There were no violations at this time. Left location @ 14:30.

2454755 Primary Facility 2016-03-01 Routine/Complete Inspection No Violations Noted
2469506 Primary Facility 2016-03-30 Routine/Complete Inspection No Violations Noted
2471656 Primary Facility 2016-04-04 Drilling/Alteration No Violations Noted Well top-holed, 6471' md. Intermediate casing: 2532'. Retrievable bridge plug @ 1700', 18 ppg mud below plug. Opening valve on bridge plug as part of a plan to manage intermediate casing pressures. Renegade Services (wireline). Loaded hole with ¿ 120-140 bbls water, pressured up to 3200 psi, opened valve @ 14:00 - pressure dropped to 1500 psi. Blowing down well to gas buster.
2472501 Primary Facility 2016-04-05 Drilling/Alteration No Violations Noted Weather: cold, clear. Arrived @ 7:30. Well being blown down as part of a plan to manage intermediate casing pressures for top-holed wells on this pad. At the time of my inspection the well was blowing down to a gas buster and bringing up mainly gas with some fluid and mud. A gauge on the flowing 2” vent for the 9-5/8” casing read between 85 and > 100 psi on a 0-100 analogue gauge. Contacted Dale Fidurko who said the gauge was broken. Previously pressure had settled down to 20 psi on a 0-6000 psi gauge. The replacement gauge was more sensitive, but didn’t work. Discussed flaring the well with Dale who said that a flare stack was available at Inflection’s yard on Rt 87 and would be brought on site and connected up. Left location @ 10:00
2472520 Primary Facility 2016-04-06 Drilling/Alteration No Violations Noted Weather cold and clear. Arrived @ 8:00. Flare stack on (began afternoon of 4/5/16). Flowing pressure approx. 10 psi. Fluid level in gas buster tank approx 1/10 to 1/5 of tank volume. Flare approx. 8' to 10' high. Left location @ 08:20.
2472532 Primary Facility 2016-04-07 Drilling/Alteration No Violations Noted : Weather rain. Arrived @ 07:45. Flare stack on (began afternoon of 4/5/16). Flowing pressure approx. 10 psi. Fluid level in gas buster tank approx 1/10 to 1/5 of tank volume (apparently unchanged). Flare approx. 8' to 10' high. Left location @ 08:15.

14:30, returned to Bennett. Infomed by Dale by phone that flaring ended at ¿ 12:30.At the time of my inspection, met with Dale Fidurko. Blind flange previously capping the well was replaced with a taller, valved cap. 9-5/8” casing pressure ¿ 100 psi on 0-5000 psi analog gauge. Inflection will check the casing pressure daily. It is anticipated that pressures will rise to ¿ 1400 psi between 4/7/16 and 4/20/16 when the next stage of the study is expected to begin. If pressures should rise higher, other options will be considered. Left location @ 15:00.

2473237 Primary Facility 2016-04-11 Drilling/Alteration No Violations Noted Weather: cold, cloudy, rain. Arrived @ 08:00. Received message from Dale Fidurko on 4/09/16 @ 9:34 informing the Department that shut-in pressure on the Bush Hill Bennett 1H was 1900 psi and Inflection would flare to reduce pressure. Inflection flared from approximately 10:00 to 12:30 on 4/09/16, afterwards shut-in. On 4/11/16, at the time of my inspection Brian Twigg (Inflection ) checked on the well’s shut-in pressure which was 2050 psi. While I was onsite, Dale Fidurko called to tell me that later in the morning, Inflection would begin flaring the well again to reduce the pressure. Noting that the pressure was building to greater than 1800 psi in less than a day, Dale suggested that the well be continuously flared and I agreed with his suggestion. Left location @ 09:00
2473837 Primary Facility 2016-04-12 Drilling/Alteration No Violations Noted Weather: sunny & windy, following earlier rain. Arrived @ 09:30. Dale Fidurko called earlier in the morning to say that the well is being flared, with no back pressure, after a blow-down of approximately 1.5 hours. At the time of my inspection the well was being flared and there was no back pressure.

The annular vents were monitored using an Altair 5X gas meter calibrated on 4/12/16. No methane was detected in either annulus. Left location @ 09:45.

2474035 Primary Facility 2016-04-13 Drilling/Alteration No Violations Noted Arrived @ 07:45, weather cold and sunny. Bennett 1H flaring, no back pressure (0-3000 psi analog).
2475689 Primary Facility 2016-04-14 Drilling/Alteration No Violations Noted Arrrived @ 08:00, cold & sunny. BHB 1H flaring no back pressure (0-3000 psi analog gauge). Doyle crew on site laying iron to move flare to the SE corner. Left @ 08:20.
2475694 Primary Facility 2016-04-18 Drilling/Alteration No Violations Noted Arrived @ 12:20, sunny and warm. BHB 1H flaring no back pressure (0-3000 psi analog gauge). Flare stack moved to SE corner, lines with pressure gauges are in place for the three top-holed wells, pressure valve also in line. Left location @ 12:55.
2477391 Primary Facility 2016-04-22 Drilling/Alteration No Violations Noted Well still flaring.
2479843 Primary Facility 2016-04-26 Drilling/Alteration No Violations Noted Arrived @ 16:00. Weather: sunny, humid. The BHB 1H was shut-in on 4/25/16. The two other top-holed wells: Chaapel Mountain Bennett 1H and Chaapel Mountain Bennett 3H have been shut-in, but pressure monitoring for these two wells also began on 4/25/16 prior to a pressure and flow monitoring study. BHB 1H: shut-in. Intermediate casing pressure: 1600 psi, (0-3000 psi analog gauge). BHB 2H in production. Chaapel Mountain Bennett 1H: Intermediate casing pressure: 1070 psi (0-3000 psi analog gauge). Chappel Mountain Bennett 3H: Intermediate casing pressure: 920 psi (0-3000 psi analog gauge).

Plan is to begin flowing the wells on 4/28/16 and begin measuring rates.

2492577 Primary Facility 2016-06-09 Drilling/Alteration No Violations Noted Arrived @ 10:45. Weather: sunny, pleasant. Personnel on site: Brian Twigg (Inflection), Matt Caldwell (Moody). The purpose of this inspection was to check on the monitoring/flaring arrangements for the 3 top-holed wells on location: BHB 1H, CMB 1H, and CMB 3H, following receipt of Inflection’s update on Intermediate Casing Pressure management for these wells. At the time of inspection: BHB 1H was flaring, and CMB 1H and CMB 3H were shut-in, with intermediate hut-in pressures at 200 psi. Continuous pressure loggers were fitted to the intermediate casings of each top-holed well. Beginning 6/14 @ 6:00, the BHB 1H would also be shut-in. Pressures on the CMB 1H and CMB 3H would be monitored to determine whether a hydraulic connection between the BHB 1H and the CMB wells exists at depth. No violations were observed during this inspection. Left location @ 11:20.
2492578 Primary Facility 2016-06-09 Drilling/Alteration No Violations Noted
2535031 Primary Facility 2016-11-02 Routine/Complete Inspection No Violations Noted Arrived @ 13:30, weather warm and sunny for this routine inspection with no personnel on site. This locaton was previously hit by historically heavy rain which damaged the access road. The BHB 1H was in production. Pressure at the well was 248 psi (digital). No combustible gas was detected at the annular vents. Left location @ 14:10.
2818991 Primary Facility 2018-12-26 Routine/Complete Inspection No Violations Noted One well staged for production (2H). Three additional wells spudded, but not staged for production. These wells are recommended for in active status application with the Department.

One GPU within containment. No violations taken at this time.

Additionally, a fresh water impoundment is on location with maintaind free board.

For data sources see[7]