X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-20961

Well Details

Well ID: 37-081-20961
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cascade Township
Operator Name: ARD OPR LLC
Well Pad ID: 149519
Farm/Lease Name: WALLIS RUN HUNTING CLUB A 5H
License Status:
Spud Date:
Permit Date: 2012-06-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.446458
Longitude: -76.837633

For data sources see[1][2][3]

Well History

Date Event
2012-06-20 New Permit Application
2012-06-25 Performed Spud Operation
2013-08-23 Perforation
2013-09-22 Drilling Completion
2015-04-29 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-26 2013-09-05 7,725 4,629,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Anadarko Carrier/Base Fluid Water 7732-18-5 100 84.4341 38,632,300.0
FR-15 Trican Well Service Friction Reducer Paraffinic, Naphthenic Solvent 64742-47-8 25 0.0190092 8697.53
Proprietary Amide Proprietary 2.5 0.00190092 869.753
Aqucar DB 5 Trican Well Service Biocide Sodium bromide 7647-15-6 1.5 0.000369806 169.203
Polyethylene glycol 25322-68-3 65.2 0.0160742 7354.67
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5 0.00123269 564.009
Dibromoacetonitrile 3252-43-5 50 0.0123269 5640.09
Sand (Proppant) Trican Well Service Proppant Hexamethylenetretramine 100-97-0 1 0.148664 68020.4
Quartz 14808-60-7 99 14.7178 6,734,020.0
Bio-Clear 5000 Trican Well Service Biocide Polyethylene glycol 25322-68-3 70 0.0155656 7121.96
2,2-dibromo-3-nitrilopropionamide 10222-01-2 10 0.00222366 1017.42
Bio-Clear 1000 Trican Well Service Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 98 0.000147789 67.62
AI-7NR Trican Well Service Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 1 0.00002189 10.014
Hydrochloric Acid (7.5%) Trican Well Service Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0426785 19527.3
Water 7732-18-5 92.5 0.526368 240837
FEAC-20 Trican Well Service Iron Control Acetic Acid 64-19-7 50 0.0025826 1181.65
Citric Acid 77-92-9 30 0.00154956 708.991

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2013 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 1,782,736.00 266 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 537,140.00 121 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 683,563.00 365 0.00 0 0.00 0
2017 ARD OPR LLC 299,706.22 365 0.00 0 0.00 0
2018 ARD OPR LLC 222,615.74 340 0.00 0 0.00 0
2019 ARD OPR LLC 172,084.51 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 ANADARKO E&P ONSHORE LLC Drill Cuttings 120.90 Tons LANDFILL 100955
2012 ANADARKO E&P ONSHORE LLC Drill Cuttings 1,201.06 Tons LANDFILL 301626
2014 ANADARKO E&P ONSHORE LLC Produced Fluid 7,356.76 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 2,417.96 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 1,095.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 206.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 72.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 161.24 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 589.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 499.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 84.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2017 ARD OPR LLC Produced Fluid 82.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ARD OPR LLC Produced Fluid 103.43 Bbl REUSE (AT WELL PAD)
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 301.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 52.99 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Produced Fluid 741.54 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 736.40 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Other Oil & Gas Wastes 0.25 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 88.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2083376 Primary Facility 2012-07-11 Routine/Complete Inspection No Violations Noted
2085802 Primary Facility 2012-07-23 Drilling/Alteration No Violations Noted
2094759 Primary Facility 2012-08-21 Routine/Complete Inspection No Violations Noted
2485611 Primary Facility 2016-05-17 Routine/Complete Inspection No Violations Noted Routine Inspection; 5/17/2016.

I entered the location at 10:18 and began the inspection. At the time of the inspection, the Wallis Run Hunting Club A 2H (081-20669), 4H (081-20670), 5H (081-20961), and 6H (081-20971) wells were in production. The well pad area and access road are stabilized and no erosion was noted. The well site remains at its originally constructed size and has not been restored. The ESCGP expired on 6/30/2015. The revised restoration assessment indicates this site will be re-permitted sometime in 2016 and those revisions will be implemented sometime in 2017.

The Department considers a well site to be restored under Section 3216(c) of the 2012 Oil and Gas Act when the oil or gas owners or operators meet the following:

1. All permanent post construction stormwater control features as identified in the Post Construction Stormwater Management/Site Restoration Plan are in place.

2. Remaining impervious areas are minimized. See Section 102.8 (b)(4). Impervious areas include, but are

2568277 Primary Facility 2017-03-06 Routine/Complete Inspection No Violations Noted
2842720 Primary Facility 2019-02-21 Routine/Complete Inspection No Violations Noted Weather: 36 degrees partly cloudy. Fours wells staged for production phase. Four each sand and water separators within polyurethane coated Styrofoam. Main GPU and double walled production tank on location. Salt treatment fluid tank staged near well heads. Tank within containment. No leaks detected from production equipment. No violations noted.

For data sources see[8]

References