X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-20516

Well Details

Well ID: 37-081-20516
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Lycoming Township
Operator Name: BEECH RESOURCES LLC
Well Pad ID: 147543
Farm/Lease Name: DOUGLAS C KINLEY
License Status: INACTIVE
Spud Date: 2011-02-02
Permit Date: 2011-02-07
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.309886
Longitude: -77.116608

For data sources see[1][2][3]

Well History

Date Event
2011-02-07 New Permit Application
2011-03-23 Performed Spud Operation
2011-05-02 Drilling Completion
2011-07-22 Perforation
2012-03-08 DEVIATED
2019-05-10 Inactive Well Request Granted

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-08-10 2011-08-10 8,127 2,859,194

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 WMTI Poly SI40 AMPA Scale Inhibitor Poly Phosphonate 40.00 0.00303000
Hydrochloric acid 7647-01-0 17.00 0.00129000
Water 7732-18-5 70.00 0.00531000
Phosphonic acid 13598-36-2 3.00 0.00023000
WMTI Poly CS39 Universal Well Services Clay Stabilizer Proprietary poly electrolyte 40.00 0.05
Proprietary inorganic chemical 20.00 0.02
Water 7732-18-5 60.00 0.08
Chloride 16887-00-6 30.00 0.04
WMTI Poly SI40 AMPA Universal Well Services Scale Inhibitor
LEB-10X Universal Well Services Gel Breaker Ethylene glycol 107-21-1 60.00 0.00002000
SP-43X Corrosion Inhibitor Diethylbenzene 25340-17-4 1.00 0.00001000
Naphthalene 91-20-3 1.00 0.00001000
1,3,5-Trimethylbenzene 108-67-8 1.00 0.00001000
Isomeric Aromatic Ammonium Salt 10.00 0.00008000
1,2,4-Trimethylbenzene 95-63-6 5.00 0.00004000
Xylenes 1330-20-7 1.00 0.00001000
Cumene 98-82-8 1.00 0.00001000
Isopropanol 67-63-0 5.00 0.00004000
Solvent naphtha, petroleum, light arom 64742-95-6 10.00 0.00008000
Navy fuels JP-5 8008-20-6 5.00 0.00004000
2-Substituted Aromatic Amine Salt 5.00 0.00004000
Kerosine, petroleum, hydrodesulfurized 64742-81-0 5.00 0.00004000
Formalin 50-00-0 1.00 0.00001000
C10-C16 ethoxylated alcohol 68002-97-1 30.00 0.00023000
Methanol 67-56-1 30.00 0.00023000
Distillates, petroleum, hydrotreated light 64742-47-8 5.00 0.00004000
Naphtha, petroleum, heavy catalytic reformed 64741-68-0 10.00 0.00008000
Water Anadarko Carrier/Base Fluid Water 7732-18-5 100.00 86.74
Iron Sta IIC Universal Well Services Iron Stabilizer
Ethylene glycol 107-21-1 30.00 0.00
SP-43X Universal Well Services Corrosion Inhibitor
Biocide EC 6116A Universal Well Services Biocide Polyethylene glycol 25322-68-3 60.00 0.01
Dibromoacetonitrile 3252-43-5 5.00 0.00129000
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00776000
WMTI Poly CFR40G 1020 Universal Well Services Friction Reducer Cationic water-soluble polymer emulsion 100.00 0.09
Sand (Proppant) Universal Well Services Proppant Ferric oxide 1309-37-1 0.10 0.01
Quartz 14808-60-7 99.90 12.07
Alumina 1344-28-1 0.80 0.09
Titanium dioxide 13463-67-7 0.10 0.01
Acid, Hydrochloric (7.5) Universal Well Services Solvent Hydrochloric acid 7647-01-0 7.50 0.06
CMHPG Universal Well Services Gelling Agent Carboxymethylhydroxypropyl Guar Blend 100.00 0.00128000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2011 ANADARKO E&P ONSHORE LLC 17,969.00 9 0.00 0 0.00 0
2012 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2013 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2017 ARD OPR LLC 0.00 0 0.00 0 0.00 0
2019 BEECH RESOURCES LLC 0.00 0 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 315.12 Tons LANDFILL THR029
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 975.24 Tons OTHER
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 25.63 Tons LANDFILL 101397

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1968599 Primary Facility 2011-04-27 Drilling/Alteration No Violations Noted
2090183 Primary Facility 2012-07-30 Complaint Inspection No Violations Noted
2090185 Primary Facility 2012-08-01 Complaint Inspection No Violations Noted
2093189 Primary Facility 2012-08-10 Complaint Inspection No Violations Noted
2125998 Primary Facility 2012-12-14 Routine/Complete Inspection No Violations Noted
2284981 Primary Facility 2014-07-07 Complaint Inspection No Violations Noted Onsite I met with the complainant and representatives of Anadarko concerning erosion of the adjacent strip-cropped corn fields. Evidence of erosion was clearly visible leading from the edge of the field road southwest across the fields. Erosion appears to be caused when stormwater is conveyed down the field road (around the pad) and downslope. No erosion or signs of increased stormwater flow are visible on the pad surface or the fill slope above the road.
2390743 Primary Facility 2015-07-14 Routine/Complete Inspection No Violations Noted On 7/14/2015 I inspected the PCSM (Post Construction Stormwater Management) after being notified by the operator concerning its completion. I found the infiltration trench was constructed but substantially different than the approved plans. I recommend either the plans be modified to include calculations for the existing PCSM (if applicable) or construct the PCSM as designed. On 7/16/2015, Dan Harvey (DEP) and I returned and met with Anadarko representatives concerning the implementation of PCSM. Apparently, the plans used by the contractor were not the final approved plans after the permitting process was complete. Since the both operator and complainant are happy with the function and reduced footprint; the as-built PCSM will need to be modified to include calculations and plans which represent the current conditions.
2578702 Primary Facility 2017-03-29 Routine/Complete Inspection No Violations Noted Notice of Termination Inspection; 3/29/2017.

Dan Harvey (DEP) and I entered the site at 09:20. The current site conditions meet both the PCSM Plans and Site Restoration Plans and the site is permanently stabilized. The Douglas Kinley A 6H (081-20516) is on inactive status and has never been connected to pipeline. I recommend approving the Notice of Termination. I also recommend submitting the Well Site Restoration Report. No Violations Noted.

2580780 Primary Facility 2017-04-07 Administrative/File Review No Violations Noted Administrative inspection; 4/6/2017.

The Well Site Restoration Report (WSRR) was received on 4/6/2017 in response to my request on 3/29/2017. The well site is restored and the WSRR is approved.

2850246 Primary Facility 2019-03-07 Routine/Complete Inspection No Violations Noted Well site recently purchased by Beech Resources and it is intended to be put into production. One well is currently in inactive status. No production equipment on location. Site is sized approximately for production and maintenance. Site stable. No violations noted.
2850253 Primary Facility 2019-03-07 Routine/Complete Inspection No Violations Noted Well site recently purchased by Beech Resources and it is intended to be put into production. One well is currently in inactive status. No production equipment on location. Site is sized approximately for production and maintenance. Site stable. No violations noted.

For data sources see[8]

References