37-081-20302

Well Details

Well ID: 37-081-20302
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cascade Township
Operator Name: ARD OPR LLC
Well Pad ID: 148171
Farm/Lease Name: DAVID C DUNCAN A 5H
License Status:
Spud Date:
Permit Date: 2010-05-26
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.456431
Longitude: -76.913022

For data sources see[1][2][3]

Well History

Date Event
2010-05-26 New Permit Application
2010-06-30 Performed Spud Operation
2010-10-18 Drilling Completion
2011-03-04 DEVIATED
2011-04-28 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2011 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2012 ANADARKO E&P ONSHORE LLC 566,274.00 74 0.00 0 0.00 0
2013 ANADARKO E&P ONSHORE LLC 1,876,710.00 363 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 657,192.00 365 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 244,204.00 186 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 394,563.00 361 0.00 0 0.00 0
2017 ARD OPR LLC 299,410.67 336 0.00 0 0.00 0
2018 ARD OPR LLC 184,736.44 365 0.00 0 0.00 0
2019 ARD OPR LLC 409,293.81 349 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 36.67 Tons LANDFILL THR029
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 137.37 Tons LANDFILL 101397
2012 ANADARKO E&P ONSHORE LLC Produced Fluid 85.51 Bbl REUSE OTHER THAN ROAD SPREADING
2012 ANADARKO E&P ONSHORE LLC Produced Fluid 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 ANADARKO E&P ONSHORE LLC Fracturing Fluid Waste 120.00 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013 ANADARKO E&P ONSHORE LLC Produced Fluid 4,426.31 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ANADARKO E&P ONSHORE LLC Produced Fluid 1,540.11 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 783.01 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 36.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 72.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 161.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 228.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 23.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 ARD OPR LLC Produced Fluid 7.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ARD OPR LLC Produced Fluid 11.14 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid 98.16 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 33.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Other Oil & Gas Wastes 16.34 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 1,053.90 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1939567 Primary Facility 2010-12-28 Routine/Complete Inspection No Violations Noted
1951637 Primary Facility 2011-02-15 Routine/Partial Inspection No Violations Noted
1991674 Primary Facility 2011-07-21 Drilling/Alteration No Violations Noted
2069473 Primary Facility 2012-05-15 Routine/Complete Inspection No Violations Noted
2092418 Primary Facility 2012-08-10 Routine/Complete Inspection No Violations Noted
2120857 Primary Facility 2012-11-30 Routine/Complete Inspection No Violations Noted
2576330 Primary Facility 2017-03-29 Routine/Complete Inspection No Violations Noted Routine Inspection; 3/23.2017. I entered the site at 14:45. At the time of the inspection, the David C. Duncan A 4-6H (081-20531, 20302, 081-20530) wells were in production. Currently, permit 081-21565 remains active until 4/17/2017. The well was permittedin 2015 and drilling has not yet been initiated. Erosion was noted on the northeast cut slope going down onto the pad surface. ESX10-081 0017 (02) (major modification) was issued on 7/18/2016 and includes PCSM (Post Construction Stormwater Management) plansfor the current well pad surface. Stormwater is controlled through the use of infiltration berms. Currently, the PCSM has not been implemented. No Violations Noted.
2578497 Primary Facility 2017-03-23 Routine/Complete Inspection No Violations Noted Routine Inspection; 3/23.2017. I entered the site at 14:45. At the time of the inspection, the David C. Duncan A 4-6H(081-20531, 081-20302, 081-20530) wells were in production. Currently, permit 081-21565 remains active until 4/17/2017. The well was permitted in 2015 and drilling has not yet been initiated. Erosion

was noted on the northeast cut slope going down onto the pad surface. ESX10-081 0017 (02) (major modification) was issued on 7/18/2016 and includes PCSM (Post Construction Stormwater Management) plans for the current well pad surface. Stormwater is controlled through the use of infiltration berms. Currently, the permitted PCSM has not been implemented. No Violations Noted.

2583275 Primary Facility 2017-04-13 Routine/Complete Inspection No Violations Noted Arrived @ 11:50. Weather: clear, light breeze. There were 3 producing wells in a linear arrayNo personnel were onsite at the time of my inspection. For all three wells, there was water in the cellars but no bubbling. The 9-5/8” x 5-1/2” vent was shut to a gauge. No other annular vents were visible. All pressures readings are digital.

David Duncan A 5H: Top gauge: 643 psi, 5-1/2”: 734 psi, 9-5/8” x 5-1/2”: 667 psi. David Duncan A 6H: Top gauge: 628 psi, 5-1/2” 799 psi, 9-5/8” x 5-1/2”: 0 psi, mechanical lift David Duncan A 4H: Top gauge: 610 psi, 5-1/2” 674 psi, 9-5/8” x 5-1/2”: -2 psi There was foam injection on the 4H and 6H. Left location @ 12:30. There were no violations at the time of my inspection.

2785012 Primary Facility 2018-10-05 Routine/Complete Inspection No Violations Noted Three wells in the production phase. Three GPUs and two separators. One double walled steel production water tank near separators. No leaks from equipment. No violations.

For data sources see[7]

References